Since January, 2003
            
 (a random before-and-after moment)
January 22, 2006
May 6, 2008
Half at O, Looking West (see more)

The Sakura Matsuri Japanese Street Festival, one of the largest of the annual events associated with the National Cherry Blossom Festival, will be relocating to New Jersey and M Streets SE this year, thanks to a squeeze on Pennsylvania Avenue resulting from the impending opening of the Trump International Hotel.
The festival, which attracted more than 40,000 people last year, will be held Saturday, April 16--and with the festival listing its entrances as being at New Jersey and N, First and N, and First and M, it appears to be on the footprint of the Yards, at the former Spooky Building 213 and (eventual Spooky Park) site. (If so, there's a lot of dirt to be covered over in the next five weeks!)
The festival bills itself as the "largest one-day celebration of Japanese culture in the United States," and the "grand finale of the National Cherry Blossom Festival." Alas, the official festival web site has not yet posted a 2016 program guide, or festival map, but tickets are on sale for $8 in advance--they'll be $10, cash only, at the gates. There are some details available on the food/beverage and "Bring Japan Home" offerings.
It doesn't sound like this is a permanent move, with WBJ quoting the president of the Japan-America Society as saying that “We’re already thinking ahead to 2017 to see where we might need to go."
The Cherry Blossom Parade is from 10 am to noon along Constitution Avenue, with Sakura Matsuri running from 10:30 am to 6 pm, so judicious non-attendees will definitely want to avoid the Green Line that day.
Comments (6)
   
 
 More Recent News
 All posts: Events, sakura

JDLand.com Home

Comments

BLT says: (3/3/16 11:56 AM)
Good to know that huge area may be spiffed up at, or near, the beginning of baseball season.


202_cyclist says: (3/3/16 1:40 PM)
And the beer fest at Nats Park is also on Apr. 16!


dude says: (3/4/16 8:04 AM)
Sounds good to me.

Would be a shame if they don't get it looking nicer between now and then.


JES says: (3/5/16 4:41 PM)
It's been over a year since that building bit the dust; crazy how long it's taken to lay sod... was there some environmental cleanup that needed to happen?


jdc says: (3/6/16 7:58 PM)
Just to echo JES - that area is as much of an eyesore now as it was before. I cannot believe nothing was done all this time. Forget sod, how about some random wildflower seeds thrown down at least? It's so visually unappealing and it lies at the center of JDLand.


JD says: (3/7/16 1:49 PM)
If you look at my shot from the roof of Arris today, you can see that the Spooky Park footprint is getting smoothed considerably, in preparation for seeding for grass sometime this month. (How that jibes with the festival being held there, well.... I think it's possible the festival might end up on one of the Yards parking lots.)

At the very least the Spooky Park sidewalks are supposed to be open for baseball season, making the walk from the New Jersey & M subway exit to the ballpark a slightly more spacious one.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

bdj on ANC 6D07 Candidates: Yes!! Jimmy Johns would be great!
JD on ANC 6D07 Candidates: ABC application seems to indicate that the new liquor store at 1015 Half Street ...
CJBabyDaddy on ANC 6D07 Candidates: Last time I went to the TG on 1st Street, just north of the ballpark, I was unse...
GarfieldPark on ANC 6D07 Candidates: It wasn't that bad, although too hipster for me. I'll take a Jimmy John's...you'...
bdj on ANC 6D07 Candidates: I've always thought that Taylor Gourmet was a poor restaurant. Food wasn't great...
JD on ANC 6D07 Candidates: That's my assumption, too. By the time you demolish the upper floors, you don't ...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
150 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/22/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/22/18
1000 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Street / Unknown
 09/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/18
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/13/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/08/18
400 B/O M ST SE   THEFT
Shoplifting
 09/02/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/26/18

Recent Issued Building Permits Archive  
1108 3RD ST SE   
09/04/18 
JULIANA DUFFY / HERVE BILLIET
SOL1800816 / CONSTRUCTION
This is a new rooftop solar installation for 1108 3rd Street SE, Washington, DC, 20003.
   
09/06/18 
JULIANA DUFFY / null
E1810366 / SUPPLEMENTAL
1015 4TH ST SE   
09/17/18 
GASTON CHAN / KYLE YOST
SOL1800945 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
09/19/18 
GASTON CHAN / null
E1810828 / SUPPLEMENTAL
1300 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810371 / SUPPLEMENTAL
1346 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810372 / SUPPLEMENTAL
1310 10TH ST SE   
09/10/18 
NAVFAC / BLAINE LINKOUS
EX1800093 / CONSTRUCTION
Federal property at the Washington Navy Yard. Project is for the installation of outside underground utilities including new potable water valves and stormdrain. All work is cut and cover utility install. Sediment controls will be provided.
2 EYE ST SE   
09/18/18 
null
M1803959 / SUPPLEMENTAL
   
09/18/18 
null
P1809280 / SUPPLEMENTAL
4 I ST SE   
08/29/18 
CRESCENT COMMUNITIES / MITCH A. PERMUY 727-210-0492
E1809865 / SUPPLEMENTAL
   
09/18/18 
JOHN MORIARTY / null
M1803958 / SUPPLEMENTAL
2 I ST SE   
08/27/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801251 / CONSTRUCTION
WR #3573836-VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM
   
08/29/18 
CRESCENT CAPITAL VIEW LLC / KIM MITCHELL
TL1800059 / CONSTRUCTION
EXPEDITION / VELOCITY PROGRAM - INTERIOR WORK ONLY FULL-SERVICE RESTAURANT WITH 78 SEATS AND 80 OCCUPANTS INDOORS. WITH BUILDOUT OF AN EXISTING COLD DARK SHELL STRUCTURE AT THE GROUND FLOOR OF THE 2 I STREET BUILDING PERMIT B1713380. THE BUILDOUT IS FOR A RETAIL KITCHEN.
   
09/11/18 
MCDONALDS CORPORATION / null
E1810511 / SUPPLEMENTAL
   
09/19/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801319 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - PEPCO CREWS WILL ALSO BE WORKING WEEKENDS (SATURDAY AND SUNDAYS) FROM 6AM TIL 6PM - WORK IS ONGOING
150 I ST SE   
09/10/18 
WILLIAM CSMITH CO / GLENNWOOD ROGERS
M1803857 / SUPPLEMENTAL
418 L ST SE   
09/14/18 
null / NA NA NA
EHOP18998072 / HOME OCCUPATION
202 M ST SE   
09/05/18 
UNITED STATES OF AMERICA / DANIEL KISER; X
SG1800384 / CONSTRUCTION
Installation of 4 wall mounted signs. 2 @ 26.25 SF and 2 @ 35.5 sf
300 M ST SE   
08/27/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809629 / CONSTRUCTION
INTERIOR RENOVATION TO 3RD FLOOR OFFICE SPACE FOR NEW MEDICAL OFFICE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. LEAD WALLS FOR X-RAY ROOM. NO STRUCTURAL. 3006 SQUARE FEET. THE CENTERS FOR ADVANCED ORTHOPEDICS, LLC SUITE 325 **CHANGE IN USE, LEVEL 2 ALTERATION
   
09/05/18 
FEDERAL CENTER LP / null
P1808927 / SUPPLEMENTAL
   
09/05/18 
FEDERAL CENTER LP / null
P1808926 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE 1ST FL   
09/18/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1809276 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 3RD FLOOR   
09/17/18 
SQUARE 742 LLC / null
P1809222 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
08/30/18 
SQUARE 742 LLC / null
E1810159 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
09/07/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ASHLEY TORRES
TL1800132 / CONSTRUCTION
Tenant Layout to 1st floor for commercial bank use. 3036SF
   
09/10/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M1803863 / SUPPLEMENTAL
   
09/12/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1810553 / SUPPLEMENTAL
125 O ST SE   
08/29/18 
DISTRICT OF COLUMBIA / DAVID T FONTANA
B1803497 / CONSTRUCTION
Revision to issued permit B1700636 for new six story DC WATER HQ office to include: Minor door, ramp and partition changes, corrections to foundation, slab and framing due to field conditions, MEP & FA coordination with other changes, minor changes to landscaping and water utility site work.
71 POTOMAC AVE SE   
08/27/18 
FORIDA ROCK PROPERTIES INC / null
AH1801250 / CONSTRUCTION
afterhours to pour concrete on jobsite from 8 / 27 / 2018 to 9 / 27 / 2018 from 9pm to 7am
   
08/31/18 
FORIDA ROCK PROPERTIES INC / MITCH PERMUY 7272100492
E1810173 / SUPPLEMENTAL
79 POTOMAC AVE SE   
09/13/18 
RIVERFRONT HOLDINGS I LLC / JOHN HOMICK 301-390-4800
E1810571 / SUPPLEMENTAL
221 TINGEY ST SE   
09/10/18 
KELLY THORNBURG / GLENNWOOD ROGERS
M1803850 / SUPPLEMENTAL
227 TINGEY ST SE   
09/07/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1801286 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for precast concrete façade panel installation. Work to take place from 7pm on 9 / 24 / 2018 to 7am on 9 / 25 / 2018.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.