Since January, 2003
            
 (a random before-and-after moment)
June 28, 2007
March 17, 2019
Half at I, Looking Southeast (see more)

While I like passing along news to the 15 of you out there who read this stuff, the reality is that my favorite part of continuing to maintain JDLand is the photos. I like taking them, I like archiving them, I like choosing which ones to post, I like updating the before-and-after Sliders and the project pages, and I like looking at the old photos to remind myself of what I used to see when wandering around the neighborhood.
However, with so many active construction sites, by the time I walk around to visit all of them and do all of the photographing and database-ing and project page-updating and slider-updating, my energy wanes when it comes time to write actual posts.
Oops.
So here's a few tidbits while I recover, and if you want to see new pictures taken in Sunday's glorious sunshine, I invite you to check out the updated sliders as well as my pages on Dock 79/Florida Rock, 909 Half, Agora/Whole Foods, Insignia, F1rst, Homewood Suites, the Bixby, the Virginia Avenue Tunnel, and Southeast Blvd., where I, ahem, finally posted photos of the finished project a mere 13 months after it opened.
In the meantime:
* JBG HALF ST. ZONING: Last Thursday the Zoning Commission heard testimony on JBG's plans for its 420ish-unit combination condo/rental building planned for just north of Nats Park at Half and N.
Urban Turf has a detailed summary of the hearing, but having watched it myself, I can boil it down to: the commissioners didn't really spend much time talking about the not-a-typical-DC-box design, which they seemed to like. Instead, most of the discussion was centered around zoning issues of setbacks and LEED certification. It comes back for an expected vote on April 11.
However, developers working on designs of future projects might want to know that Commissioner Peter May took a moment to tell the hearing that he's "getting tired of all of the glass buildings" coming to the commission, apparently losing interest in "seeing the inside of everyone's apartment and the inside of everyone's office."
* BRIDGE PARK DELAY: Did we say 2018? How about late 2019? A feasibility study will be happening soon to see whether the piers that were left in the Anacostia when the old 11th Street bridges were demolished are going to be able to in fact be used for the bridge park. One other note: the project has currently raised a little more than $11 million of the expected $35 million construction costs.
* OKAY, ONE PIC: A JDLand gold star to Clark Construction for what has to be the tidiest excavation hole I've looked into. This is the hole from which JBG's 1244 South Capitol residential building will arise, just north of the ballpark's western parking garage.
* JDLAND HAPPY HOUR: Been wanting to meet fellow residents/office workers/JDLand readers? Then mark your calendar for Thursday, March 10 at 5:30 pm at Scarlet Oak, and come say hello and hang out! I'll even have a few coveted JDLand t-shirts available for purchase.
Comments (13)
   
 
 More Recent News

JDLand.com Home

Comments

Shogungts says: (2/29/16 4:44 PM)
There has to be at least 16 of us reading these :)


JES says: (2/29/16 4:54 PM)
"getting tired of all of the glass buildings," really? I'll take modern and glassy over more boring red brick any day (looking at you 82I and Parc Riverside...)


Shogungts says: (2/29/16 5:28 PM)
@JES - Agree with the glass being better, but I will take the red brick over the sandstone (Park Chelsea and Velocity) and at least the two you mentioned have a lot of glass and metal accents to balance the brick unlike something like Capitol Hill Tower.


Joni says: (2/29/16 8:36 PM)
In case we don't mention it often enough, we readers really appreciate the tremendous amount of work you put into this. I wouldn't have moved down here had I not stumbled upon your blog!


JD says: (2/29/16 9:49 PM)
Thank you so much, Joni! I really appreciate my readers who really appreciate JDLand! :)


DCisforLovers says: (3/1/16 10:47 AM)
JD ditto what Joni said, I check this every day! So nice to be up to speed on everything going on in our neighborhood. With that said, any idea/update on tenants for the Arris retail space other than Philz Coffee yet?


Daedam says: (3/1/16 10:54 AM)
JD, I also echo the sentiments of Joni and DCisforLovers. I'm not sure when I would have taken notice of the neighborhood without your blog, but I've been living here for nearly seven years now thanks to your efforts in documenting the area and its potential and progress. Your blog and GGW are my top two must-read news sources. Thanks for all you do!


JD says: (3/1/16 11:23 AM)
Thanks all--I really do appreciate it!

@DCisforLovers: Nothing yet announced at Arris. I believe they are trying to schedule a ribbon cutting in the near future, and perhaps there'd be some announcements in conjunction with that.


MJM says: (3/1/16 1:19 PM)
Yeah, not a bad site even if its run by a gator.....


Shogungts says: (3/1/16 2:31 PM)
Agree with MJM - Go Canes!


AUshutterbug says: (3/1/16 10:43 PM)
I just moved to DC and I just wanted to say I am so glad I stumbled upon your blog. I chose an apartment in Southeast DC and you're really helping me get to know my neighborhood. Thank you!


CJBabyDaddy says: (3/2/16 2:44 PM)
In keeping with the spirit of this thread and hoping that a 2XL T-Shirt can be held for me to buy on the 10th:

We love you, JDLand,
Oh, yes, we do-ooo,
We read no other blogs,
You know that’s tru-uuue,
And if it weren’t for you, we’d all be blu-uuue,
Oh, JDLand, we love you-uuu!




JD says: (3/2/16 2:48 PM)

:-)

Birdie!

(Except I don't have any 2XLs, so now you'll hate me.)

You all are swell.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

JD on Slider-Palooza, March 2019: I'm psyched that Suzuki is back. I thought he was a great part of the team back ...
202_cyclist on Slider-Palooza, March 2019: Their pitching staff is pretty solid, the bullpen is uncertain. Rendon, Eaton, ...
JD on Slider-Palooza, March 2019: I'm pretty optimistic this year, surprisingly.
202_cyclist on Slider-Palooza, March 2019: So, any predictions for the Nats this season?
202_cyclist on Slider-Palooza, March 2019: https://m.youtube.com/watch?v=vimZj8HW0Kg
JD on Slider-Palooza, March 2019: Boombox Boxing, billing itself as "boxing remixed" and "your next group fitness ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 03/18/19
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
   
03/18/19 
FC 1331 LLC / BEN BEDDO
TL1900017 / CONSTRUCTION
REVISION to existing permit TL1700205 submitted to reduce scope of work to the permitted set to reduce costs.
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
4 I ST SE   
03/19/19 
null
E1905494 / SUPPLEMENTAL
150 I ST SE   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
   
03/21/19 
WILLIAM C SMITH / null
E1905564 / SUPPLEMENTAL
   
03/21/19 
WILLIAM C SMITH / null
E1905563 / SUPPLEMENTAL
328 I ST SE   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
1200 NEW JERSEY AVE SE 20590   
03/22/19 
DC WATER / MICHELLE GABBITAS
AH1900676 / CONSTRUCTION
Cured in Place Pipe Lining of existing sanitary sewers using existing manholes. The sewer runs from 2nd St SE and I (Eye) St SE under 2nd St SE to M St SE. It then goes under the US Department of Transportation to Tingey St SE. Work requires more than 24 hours of continuous operation to complete, necessitating an After Hours Permit. Work will be performed on weekends to minimize disruption to ...
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.