Since January, 2003
            
 Sliding from Before to After

Another piece of the puzzle that has been Half Street directly north of Nats Park is falling into place, as JBG filed plans last week with the Zoning Commission for a 424ish-unit combination condo/rental project at Half and N Streets, SE, with more than 65,000 square feet of retail on two floors, in a design that most assuredly can't be described as a typical Washington, DC "box."
The Capitol Gateway Zoning Overlay requires buildings just north of the ballpark to "minimize unarticulated walls," and there is no doubt that this design, by ODA Architecture of New York, passes that test, with "extensive modulation" through the use of "balconies [and] extensive landscaping incorporated into the elevations." (This mondo-articulated approach to building design seems to be an ODA hallmark, as you can see from the company's portfolio.)
The condo portion, on the south side of the building at Half and N facing the ballpark, would have approximately 224 1- and 2-bedroom units, while the rental portion on the north end would have 200 units, mostly studio and 1-bedroom units but also with about 10 3-bedroom units. (And the units will have irrigation systems for the balconies, to keep that greenery nice and lush, though I'd still suggest branded watering cans placed strategically as well.)
The rendering above is the view at Half and N, like you were standing at the Nats Park ticket booths looking to the northwest, on the site currently home to the southern portion of the Fairgrounds. Here's a few more drawings, looking down Half Street toward the ballpark (maybe from just a little south of Buffalo Wild Wings) and looking down from On High.
The residential entrances would be on Van Street, facing JBG's just-underway residential building at 1244 South Capitol, which also has two stories of retail, as you can see in the rendering at below left, looking north on Van from N. In the below-right rendering, you can see at left the "Via," a wide pedestrians-only alley that will run along the north end of this project and the south end of Brandywine's planned 25 M Street office building.
For zoning geeks, this filing is actually a modification, revising the design that Akridge received approvals for back in 2009, which planned one office building and one residential building for this portion of the west side of Half Street. A graphic included in the new filing gives a handy siteplan comparison of the modifications, and made me laugh as I realized the line drawing of the new design looks like it could have been drawn on an Etch-a-Sketch. These massing drawings are also worth a look, to give an idea of exactly how the building undulates along Half, as well as how the condo (green) and rental (orange) units are situated.
The only thing that will probably dismay observers is that it's likely the project won't get underway until after the 2016 baseball season ends, making it likely that it won't be completed by the time the Major League Baseball All-Star Game arrives at Nats Park in July of 2018, though the exterior should at least be finished by then.
And because JBG gets a gold star for the thoroughness of its filing, I'll just toss in a few more of the renderings they included, showing the building's interior courtyard (open to Van Street and the west) and the anticipated view from inside the ballpark, with the view of this new building flanked by 1244 South Capitol and the Jair Lynch condo/rental/retail project coming to the Half Street Hole site.
I've added a few of these renderings to the project page, which of course also has a big pile of Before photos and some history of the lot--part of the corner of Half and N has a history that's a bit spicier than we normally discuss around here.
Next, we'll wait to see how the zoning commissioners feel about such an outside-the-box design.
Comments (11)
   
 
 More About Development News

JDLand.com Home

Comments

JD says: (12/14/15 10:45 AM)
PS: It's the first day of school for the masses at the new Post building. Hopefully this is the beginning of the end of the weeks and weeks of move-related angst and work.


JHUGrad says: (12/14/15 11:34 AM)
Wow... this project looks amazing. This will be the project that solidifies the fact that DC's investment in funding Nationals Park was well worth it!


FromTheTurret says: (12/14/15 2:24 PM)
JD, do you know where the entrance to the garage will be for these buildings? With Half street closed during Nats games, I would think it would be from Van Street...but I don't want to assume.


JD says: (12/14/15 2:25 PM)
Yes, Van. (I mentioned the residential entrances but didn't think to say "garage" as well.)


FromTheTurret says: (12/14/15 3:35 PM)
Reading hard. Thank you!


Mark says: (12/14/15 7:05 PM)
I'm disappointed they're not planning any three bedroom condos.


dude says: (12/14/15 8:44 PM)
Wow, that's pretty attractive in an ugly sort of way.


Blue says: (12/15/15 5:43 AM)
Makes me want to sell my place and move! I love it!


Jaybird says: (12/15/15 11:33 AM)
JD,

If I recall correctly, this block used to be called the "Ballpark District."

Is that still used?


JD says: (12/15/15 11:36 AM)
That was never really any sort of official name--the city tried to use that when starting to plan for the area right around the ballpark (not just this block in particular) but it never really stuck.


202_cyclist says: (12/15/15 1:53 PM)
The new buildings look great and they look like a vast improvement over the proposed Akridge buildings.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

202_cyclist on Postponing the Happy: So it is referring to the Caps? They’re colluding with Tampa?
JD on Postponing the Happy: Twitter says it's "collusion." And those are Ovechkin and Kuznetsov's numbers.
202_cyclist on Postponing the Happy: There is a sign at the top of the F1rst building, “8 + 92 = CROBOP” (In Cyrillic...
jdc on Postponing the Happy: Speaking of Half Street improvements, within the last few weeks additional light...
202_cyclist on Postponing the Happy: There was a big debate a while ago on this site about whether exterior work for ...
VelocityChris on Postponing the Happy: JD-yes, there are signs in the window and I received a paper in the mail. Closin...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/19/18
400 B/O M ST SE   THEFT
Shoplifting
 05/16/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/16/18
400 B/O M ST SE   THEFT
Shoplifting
 05/15/18
900 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/12/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/11/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/10/18
100 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/09/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/09/18
UNIT B/O M ST SE   BURGLARY
Burglary Two
 05/09/18
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/08/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/08/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/06/18
400 B/O M ST SE   THEFT
Shoplifting
 05/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/30/18
900 B/O 5TH ST SE   HOMICIDE
Murder II
 04/30/18
100 B/O L ST SE   ROBBERY  04/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/27/18
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/26/18
1200 B/O SOUTH CAPITOL ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/26/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/24/18
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/23/18
1100 B/O 2ND PLACE SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/20/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
05/01/18 
DC WATER / DAVE LEVINE
AH1800901 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 DC WATER. CORMAN CONSTRUCTION 301-34-5417.
907 4TH ST SE   
05/01/18 
RYAN WILLING / null
E1806431 / SUPPLEMENTAL
   
04/30/18 
RYAN M WILLING / KYLE YOST
SOL1800442 / CONSTRUCTION
4.2kw rooftop solar pv system, less than 4' above roof
1212 4TH ST SE   
04/23/18 
FOREST CITY APARTMENTS / null
PP1803006 / POST CARD
101 H ST SE   
05/14/18 
SQUARE 737 LLC / DFM DEVELOPMENT SERVICES, LLC
B1808785 / CONSTRUCTION
Revision to Permit TL1800054 to revise the Whole Foods Market permit address from 800 New Jersey SE to 101 H Street SE.
100 H ST SE   
05/14/18 
DISTRICT OF COLUMBIA / null
E1806787 / SUPPLEMENTAL
2 I ST SE   
05/08/18 
CRESENT CAPITOL VIEW MF LLC / COMPOSITION SYSTEMS INC
AH1800928 / CONSTRUCTION
AFTER HOURS PERMIT TO WORK SUNDAY 5 / 13 / 18 FROM 7 AM UNTIL 7 PM UNDER OCCUPANCY PERMIT PA10636830 TO INSTALL A SIGN BAND.
10 I ST SE   
05/02/18 
CAPITOL HILL RACQUET CLUB / JOHN WYCKOFF
SB1800290 / CONSTRUCTION
Install 4 soil borings to less than 50 feet using dual tube geoprobe DPT tooling. Collect soil samples and install 1-inch diameter sch 40 PVC temp monitoring wells in 2 of 4 borings. Wells and borings will be abandoned with 24 hours of sampling using a bentonite grout mixture with bentonite / water ratio of 2 to 1. All IDW will be contained in drums.
150 I ST SE   
05/17/18 
SQUARE 737 LLC / JAMES WOLF
P1806078 / SUPPLEMENTAL
421 L ST SE   
05/16/18 
DORAN BUTUCHE / DORAN BUTUCHE
F1800255 / CONSTRUCTION
To install a fence and gate to the front yard. The construction, placement, style and color will be similar to fencing already in place at adjoining homes. Entire fence is in public space.
202 M ST SE   
05/18/18 
NURI EROL / PAT SNYDER
B1804587 / CONSTRUCTION
EXISTING PIZZA RESTAURANT - NEW OWNER, NEW EQUIPMENT + NEW GELATO & COFFEE SERVICE. MINOR HVAC, PLUMBING & ELECTRIC
800 NEW JERSEY AVE SE 1ST FL   
05/14/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1806780 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
05/09/18 
WHOLE FOODS MARKET / MELISSA DIAZ
TL1800054 / CONSTRUCTION
THE PROJECT IS A TENANT FIT-OUT OF AN EXISTING SPACE IN A MIXED USE PROJECT BEING DEVELOPED UNDER A SEPARATE PERMIT. THE PROJECT IS A WHOLE FOODS MARKET OCCUPYING THE GROUND FLOOR AND A MEZZANINE WITHIN THE BUILDING. - TPR
   
05/11/18 
SQUARE 737 LLC / null
P1805955 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
04/24/18 
CSX TRANSPORTATION, INC. / NA CSX TRANSPORTATION, INC.
AH1800871 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
   
05/11/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1800309 / CONSTRUCTION
Per " Work Plan, Geotechnical Investigation, dated May 2, 2018 (see attached), the work involves drilling 6 soil borings using a hollow stem auger rig and a mud rotary drill rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 75 to 150 ft.
1100 NEW JERSEY AVE SE 2ND FL   
05/10/18 
SQUARE 742 LLC / null
P1805902 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 6TH FL.   
04/24/18 
SQUARE 742 LLC / null
P1805463 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/24/18 
SQUARE 742 LLC / null
P1805476 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
04/23/18 
JBG/FEDERAL CENTER LLC / JOE SPINELLI
B1804445 / CONSTRUCTION
Interior Alteration of existing Starbucks on first floor, CO151951, to include new finishes and furniture, electrical, plumbing, mechanical, 19 seats, 43 occupancy load, 1,781sqft. No exterior work.
   
04/23/18 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1807818 / CONSTRUCTION
INTERIOR RENOVATIONS FOR 1ST FLOOR CONFERENCE ROOM. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. 185 SQUARE FEET. DOT
71 POTOMAC AVE SE   
05/11/18 
MRP REALTY / ELIZABETH DE SMET
SB1800270 / CONSTRUCTION
Installation of 124 wellpoints to assist in the construction of mixed use structure at Potomac Avenue.
   
05/18/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800039 / CONSTRUCTION
Removal of an Underground Storage Tank (UST) 7 feet in diameter and approximately 9 feet long (approximately 2000 gallons). Suspected Fuel Tank. Tank is filled with 8 inches of unknown content. Tank will be removed and disposed off as per the appropriate standards and requirements.
227 TINGEY ST SE   
04/25/18 
JW CAPITAL PARTNERS / MELISSA DIAZ
B1801074 / CONSTRUCTION
Parcel L1- New construction of 11-story full service hotel with restaurant and retail per Zoning Order 17-07. Includes 225 hotel rooms and 4 elevators. SWM and GAR combined with adjacent Parcel L2 to be permitted separately. TPR
221 TINGEY ST SE   
04/30/18 
GONE YARD HOTEL OWNER, LLC / DFM DEVELOPMENT SERVICES, LLC
B1808252 / CONSTRUCTION
Yards Parcel L-1 : Permit Revision for B1801074 to update owner information to Gone Yard Hotel Owner, LLC and permit address to new address: 221 Tingey Street SE.
300 TINGEY ST SE   
05/09/18 
FC BOILERMAKER LLC / FAY A KENNEDY
E1806640 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.