Since January, 2003
            
 (a random before-and-after moment)
January 22, 2006
June 16, 2018
Half at K, Looking West-Northwest (see more)

This is mainly an excuse for me to post photos I got by schlepping up onto the Douglass Bridge on Sunday, but it's worth noting that it was announced last week that vertical construction is now finished on Dock 79, the 305-unit residential building that is the first phase of the never-thought-it-would-finally-happen redevelopment of the Florida Rock site along the Anacostia River. And so let's take a moment to look back to what the site looked like in 2005, and what it looks like now:
One other item of note at the site--as seen below, beams have been placed connecting a portion of the main concrete walkway at Diamond Teague Park to what will be Dock 79's plaza and Anacostia Riverwalk footprint, and without realizing it I did a pretty good job of matching my photo of the beams to the rendering of the same location:
There will be over 15,000 square feet of retail in the building, and in a press release from developer MRP Realty last week, John Begert is quoted as saying the retail space is being "programmed" with "a dynamic mix of local authentic restaurant operators," though no retail tenants have been announced as yet.
Most of this retail space will be facing the "esplanade" and this plaza, which MRP's press release says is "inspired by the concept of the “ecotone,” an ecological term referring to the transitional zone between two ecosystems."
The plaza also is directly south of the "grand staircase" of Nationals Park, ensuring that (some) views of the river from those steps and the viewing platform on the upper concourse are not completely lost.
The building is expected to deliver in the summer of 2016, and will have a ground-floor club/game room, a health club, a rooftop swimming pool, WiFi, air-conditioned storage, bike storage, a business lounge, and a 24-hour front desk.
The subsequent phases of the six-acre project are currently envisioned as a second residential building with 282 units and 5,600 square feet of retail, followed by a 313,000-square-foot office building with 11,500 square feet of retail, and then a fourth building that could be a hotel or another residential or office building, with 260,000 square feet of space and 12,600 square feet of ground-floor retail. (The footprint of the final two phases is, however, right up against the western end of the existing Douglass Bridge, so it might be awhile before those come to pass.)
See my Dock 79/Florida Rock page for lots more photos and renderings.
Comments (3)
   
 
 More About Florida Rock
 All posts: dock79, Florida Rock, riverwalk

JDLand.com Home

Comments

Jaybird says: (11/9/15 11:04 AM)
I'm anticipating arriving at a Nats game via the Alexandria ferry, sipping a pre-game beer at this place, then stepping inside the park, all with a certain ease not possible any other way, which is to say it avoids the crowds on the north side and is all close together.



Chaifetz10 says: (11/9/15 1:57 PM)
We went down to Sideyards this past weekend, and walking down New Jersey Ave from the Metro, we could see active construction equipment at what would be roughly New Jersey Ave and N St, on the south side. So far I haven't tracked anything down for this parcel... can anyone help me figure out what's being worked on here?


JD says: (11/9/15 1:58 PM)
That's DC Water doing infrastructure work as part of its huge Clean Rivers project.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

dude on Slider-Palooza, March 2019: Slide, slide, slippity slide.
JD on Slider-Palooza, March 2019: Enjoy the calm news-free weekend, everybody!
202_cyclist on Signage, and Not-Yet-Signage: @michaelj-- it is actually 818 Potomac Ave. Condos are planned here, where the ...
michaelj on Signage, and Not-Yet-Signage: Hi JD - Any news on what the new project is on the SW corner of L SE and 9th SE?...
JD on Signage, and Not-Yet-Signage: In other news, residents of F1rst have been alerted that there is a deal for JBG...
JD on Signage, and Not-Yet-Signage: @dcgent Yup, I mentioned the trapeze school move when I wrote about the Chemonic...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 03/18/19
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
   
03/18/19 
FC 1331 LLC / BEN BEDDO
TL1900017 / CONSTRUCTION
REVISION to existing permit TL1700205 submitted to reduce scope of work to the permitted set to reduce costs.
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
4 I ST SE   
03/19/19 
null
E1905494 / SUPPLEMENTAL
150 I ST SE   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
328 I ST SE   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.