Since January, 2003
            
 (a random before-and-after moment)
August 28, 2004
May 19, 2019 
Half at I, Looking East (see more)

This is mainly an excuse for me to post photos I got by schlepping up onto the Douglass Bridge on Sunday, but it's worth noting that it was announced last week that vertical construction is now finished on Dock 79, the 305-unit residential building that is the first phase of the never-thought-it-would-finally-happen redevelopment of the Florida Rock site along the Anacostia River. And so let's take a moment to look back to what the site looked like in 2005, and what it looks like now:
One other item of note at the site--as seen below, beams have been placed connecting a portion of the main concrete walkway at Diamond Teague Park to what will be Dock 79's plaza and Anacostia Riverwalk footprint, and without realizing it I did a pretty good job of matching my photo of the beams to the rendering of the same location:
There will be over 15,000 square feet of retail in the building, and in a press release from developer MRP Realty last week, John Begert is quoted as saying the retail space is being "programmed" with "a dynamic mix of local authentic restaurant operators," though no retail tenants have been announced as yet.
Most of this retail space will be facing the "esplanade" and this plaza, which MRP's press release says is "inspired by the concept of the “ecotone,” an ecological term referring to the transitional zone between two ecosystems."
The plaza also is directly south of the "grand staircase" of Nationals Park, ensuring that (some) views of the river from those steps and the viewing platform on the upper concourse are not completely lost.
The building is expected to deliver in the summer of 2016, and will have a ground-floor club/game room, a health club, a rooftop swimming pool, WiFi, air-conditioned storage, bike storage, a business lounge, and a 24-hour front desk.
The subsequent phases of the six-acre project are currently envisioned as a second residential building with 282 units and 5,600 square feet of retail, followed by a 313,000-square-foot office building with 11,500 square feet of retail, and then a fourth building that could be a hotel or another residential or office building, with 260,000 square feet of space and 12,600 square feet of ground-floor retail. (The footprint of the final two phases is, however, right up against the western end of the existing Douglass Bridge, so it might be awhile before those come to pass.)
See my Dock 79/Florida Rock page for lots more photos and renderings.
Comments (3)
   
 
 More About Florida Rock
 All posts: dock79, Florida Rock, riverwalk

JDLand.com Home

Comments

Jaybird says: (11/9/15 11:04 AM)
I'm anticipating arriving at a Nats game via the Alexandria ferry, sipping a pre-game beer at this place, then stepping inside the park, all with a certain ease not possible any other way, which is to say it avoids the crowds on the north side and is all close together.



Chaifetz10 says: (11/9/15 1:57 PM)
We went down to Sideyards this past weekend, and walking down New Jersey Ave from the Metro, we could see active construction equipment at what would be roughly New Jersey Ave and N St, on the south side. So far I haven't tracked anything down for this parcel... can anyone help me figure out what's being worked on here?


JD says: (11/9/15 1:58 PM)
That's DC Water doing infrastructure work as part of its huge Clean Rivers project.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

bdj on Nom News: There’s some signs up on the Tishman Speyer development on 1st and K/I that name...
conngs0 on Nom News: The return of Congressional Cleaners if fantastic news! Same ownership and ever...
JD on Nom News: It will be the return of Congressional Cleaners (the place that used to be at Ca...
GarfieldPark on Nom News: Good news for I and NJ Ave residents: signs on door of I ST space has a dry clea...
conngs0 on Nom News: I agree that it's strange that the senior center appears untouched (perhaps work...
walt on Nom News: Anybody have an update on the reconstruction for the Senior Center? It's nice ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/23/19
1000 B/O 7TH ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/17/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 05/17/19
1100 SOUTH CAPITOL ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 05/16/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/15/19
300 K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/14/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/19
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/11/19
200 B/O K ST SE   ROBBERY  05/11/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/01/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/29/19
1500 B/O SOUTH CAPITOL ST   THEFT
Theft First Degree (theft From Building)
 04/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/19
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
04/30/19 
CBRE / HELEN M MAPPLEBECK
TL1900080 / CONSTRUCTION
First generation finish out of Suite #100 at Square 769N Building, first floor for a 1,374 SF hair salon
   
05/17/19 
CAPPER 769N CONDOMINIUM / WILLIAM J. ANDERSON
P1906344 / SUPPLEMENTAL
   
05/22/19 
HELEN M. MAPPLEBECK / HEE YEOL HWANG
E1907663 / SUPPLEMENTAL
   
05/22/19 
CBRE / DOMINIC E TOTARO
M1902700 / SUPPLEMENTAL
1331 4TH ST SE CU   
05/01/19 
FC 1331 LLC / BEN BEDDO; BEN BEDDO
SG1900282 / CONSTRUCTION
INSTALL WALL MOUNTED BLADE SIGN WITH EXTERNAL ILLUMINATION. SIGN DOES NOT ENCROACH PUBLIC SPACE.
   
05/09/19 
FC 1331 LLC / BEN BEDDO
B1908465 / CONSTRUCTION
INSTALLATION OF RESTAURANT SUMMER GARDEN WITHIN PROPERTY LINE.
1331 4TH ST SE R-2   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906870 / SUPPLEMENTAL
   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906871 / SUPPLEMENTAL
1017 4TH ST SE   
05/17/19 
MIKE MORAWSKI / KYLE YOST; KYLE YOST
SOL1901148 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
150 I ST SE   
05/21/19 
WILLIAM C SMITH CO / null
E1907650 / SUPPLEMENTAL
250 M ST SE   
05/20/19 
SWUARE 769 LLC / PATRICK B. MCATEER
P1906137 / SUPPLEMENTAL
   
05/20/19 
SQUARE 769 LLC / CHRISTOPHER J. PETRAKES
M1902543 / SUPPLEMENTAL
880 NEW JERSEY AVE SE   
04/29/19 
880 NEW JERSEY AVE LLC / null
M1902401 / SUPPLEMENTAL
   
05/02/19 
880 NEW JERSEY AVENUE LLC / null
M1902440 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH FL 20590   
05/13/19 
JBG/FEDERAL CENTER LLC / null
P1906172 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH 20590   
05/01/19 
JBG/ FEDERAL CENTER LIC / null
P1905855 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
05/02/19 
SQUARE 742, LLC / SAM HOLLEN; NA
B1909008 / CONSTRUCTION
INTERIOR RENOVATION TO 6TH FLOOR OFFICE SPACE. DEMISING PARTITIONS, FURNITURE, MECHANICAL , ELECTRICAL AND LIFE SAFETY. 980 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY
1200 NEW JERSEY AVE SE 20590   
05/09/19 
JBG/FEDERAL CENTER LLC / CARLOS E. MONTES
P1906111 / SUPPLEMENTAL
79 POTOMAC AVE SE   
05/08/19 
RIVERFRONT HOLDINGS I LLC / null
E1907222 / SUPPLEMENTAL
227 TINGEY ST SE   
05/10/19 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
B1909472 / CONSTRUCTION
First Extension to B1801871, to Expire on 11 / 25 / 2019. Original Scope: Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR. 6-month extension of permit B1801871.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.