Since January, 2003
            
 (a random before-and-after moment)
May 6, 2006
August 5, 2017
Cushing at N, Looking South-Southwest (see more)

Rumored a few months ago after a liquor license application appeared in the pipeline, it's officially being announced today by Forest City Washington that the owners of Brooklyn Winery will be opening DC's first "urban winery" in a new 16,000-square-foot pavilion on the southwest corner of 4th and Water Streets SE in the Yards Park.
It will be named District Winery, and is to "feature the most popular components" of the Brooklyn version--it will be a full-service restaurant, and will also have a wine tasting area, a private events space with an open-air terrace, and, "of course, an impressive collection of wines, crafted and aged onsite." The Brooklyn operation is also apparently a quite popular venue for weddings.
The new pavilion's design will apparently be quite a wood-and-glass look that will echo the nearby Lumber Shed and the Yards Park itself. When I wrote about the rumors back in May, I included some 2009-era imaginings of what the pavilion could look like from when the Yards Park was going through its approvals process, but my understanding is that the design has evolved considerably, with District Winery's input. (No new renderings are being made available just yet, however.)
Forest City says it expects to start construction in the spring of 2016 and that the winery would open in the fall of 2017.
Comments (19)
   
 
 More About Restaurants/Nightlife

JDLand.com Home

Comments

JD says: (9/21/15 10:40 AM)
One other item in the press release is that the planned PN Hoffman condo building and its sibling Forest City apartment building at 4th and Tingey are now expected to get underway in spring 2016 as well (there had originally been "late 2015" talks).


nairobs says: (9/21/15 11:05 AM)
Is it just me or does a year and a half seem like a really long time to build a one or two story pavilion?


JD says: (9/21/15 11:07 AM)
That's to not only build it but do all the necessary work to open the winery. I'm guessing that build-out, decorating, staffing, training, etc., is not a six-week job.


walt says: (9/21/15 12:47 PM)
JD, which corner of 4th and Tingey is the planned Forest City apartment building? It seems so long that 4th street has been closed off/under construction/in a mess that I was hoping they'd cool down on construction for a while or get it all over with at once. It does look great down there, but I can't walk by without getting sick from the smell of all the port-potties for the construction workers. Yikes!


JD says: (9/21/15 12:54 PM)
The only corner left at 4th and Tingey that isn't built-out--the southeast corner, where the trapeze school is (until it moves to New Jersey and Tingey sometime in the coming months). Here's the deets on the two buildings planned: link


willinrm says: (9/21/15 1:14 PM)
This may be old news but I was clicking around and saw that Chelsea/wholefoods (aka the never ending project) building will begin leasing January 2016


JD says: (9/21/15 1:20 PM)
My approach to the Park Chelsea leasing dates is now the same as the approach to most restaurant opening dates (and the 11th Street Bridge Park estimated completion dates, for that matter): take any pronouncements as an interesting piece of potential information, but don't mark it in ink on your calendar. At some point, the dates will be right, but will it be this particular pronouncement, or the next one....? :)




202_cyclist says: (9/21/15 2:17 PM)
@JD:

Interesting--- the H Street streetcar is also supposed to be carrying passengers by January 2016.

link


Section314 says: (9/21/15 9:04 PM)
It appears construction of the replacement Trapeze school has begun.


BillP says: (9/22/15 8:42 AM)
this is kind of a bummer as this open green space was a de facto part of yards park.

i guess the BID will have to start scheduling less popular acts for the free friday concerts because the yards park proper is going to be pretty darn small when all is said and done.


JD says: (9/22/15 9:23 AM)
One thing to keep in mind is that while yes, this patch of green (and eventually the one next to it) will be gone, the footprint stops at the sidewalk and tree/bench line on the south end. The grass that steps down to the boardwalk is not going anywhere.



S.B. says: (9/22/15 12:19 PM)
So does that mean this field is now going to be gone? Doesn't that mess up the event space that they have established there?


JD says: (9/22/15 12:24 PM)
The winery footprint is the eastern-most patch of grass--until the other pavilion gets built, the patch of grass between the winery and the Lumber Shed will still be there.

But yes, this does take away that events space. But this has been planned all along, that there would be two new pavilions built on these spots.



bryan says: (9/22/15 1:49 PM)
Regarding the condo/apartment on Parcel O: Your project page says the southern end of the condo/apartment will be closed by extending water street. Are there plans for the area just south of that? ie between the new water street and the riverwalk forest section of the park.


SWag says: (9/22/15 3:25 PM)
@bryan a developer for FC told me that it would be a very low condo building going in that space. no plans yet. unless JD has the super scoop (which I wouldn't doubt for a second...)


JD says: (9/22/15 3:28 PM)
{whistling, looking around}


SWag says: (9/22/15 4:01 PM)
LoL!


conngs0 says: (9/23/15 4:03 AM)
I'd just like to thank the developers for keeping this lot in such excellent condition until a suitable project came along. Although I have no doubt that the grassy space (and the one next to it) contributed slightly to the value of the land by serving as a great complement to the Yards Park, it simultaneously increased the ability of neighbors to enjoy the park too. Looking forward to trying out the new winery!


Westnorth says: (9/29/15 11:44 PM)
If I were the owner, I would've put gravel rather than grass down to avoid just this sort of confusion. Or the confusion over on Church Street NW, where the eponymous church wants to rebuild on what some *very* confused neighbors think is "their" park.

Most of the rental events I've been to this year have been over on the lawn west of the waterfall.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

JD on Capitol Riverfront BID: Might be a record--USDOT had I think eight of them and there were other building...
malatesta on Capitol Riverfront BID: Tower crane going up at parc Riverside part 2, which brings the crane count in J...
nsfw on First Tidbits of: Positive initial review in the post for Chloe: https://www.washingtonpost.com/l...
dude on Capitol Riverfront BID: 15 years! Congrats!
202_cyclist on Capitol Riverfront BID: JD-- congratulations on the award. This morning I noticed that glass is being i...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   BURGLARY
Burglary Two
 01/13/18
1000 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/18
500 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/09/18
900 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/07/18
100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/04/18
400 B/O M ST SE   THEFT
Shoplifting
 01/02/18
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/31/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/19/17

Recent Issued Building Permits Archive  
1331 2ND ST SE   
12/22/17 
DC WATER / DAVE LEVINE
AH1800369 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417. TO EXCLUDE LEGAL HOLIDAYS.
1331 4TH ST SE CU   
12/27/17 
FC 1331 LLC / GARY BRENT; N/A
SG1800119 / CONSTRUCTION
Install 1 illuminated blade sign and 7 non-illuminated window vinyl signs - CHLOE BY HAIDAR KAROUM
   
12/28/17 
FC 1331 LLC / BEN BEDDO
TL1700205 / CONSTRUCTION
New Tenant Layout for restaurant
1300 4TH ST SE   
01/05/18 
FORREST CITY WASHINGTON / GEORGE ARTHUR KING
SB1800091 / CONSTRUCTION
To abandon 18 6 inch diameter 80 foot deep dewatering wells and 4 2 inch diameter 50 feet deep observation wells per the DOEE regulations
1346 4TH ST SE   
01/12/18 
ALAN OWINGS / ROBERT HENRY
AH1800415 / CONSTRUCTION
After Hours Permit for 1 / 15 / 18 from 7AM to 7PM to perform concrete operations, framing, operations, and utility operations.
411 I ST SE   
12/27/17 
ABIGAIL A SMITH / ROBERT D. JOHNSTON
E1802679 / SUPPLEMENTAL
337 L ST SE   
12/22/17 
JENNIFER LANCASTER / null
E1802602 / SUPPLEMENTAL
   
01/11/18 
JENNIFER LANCASTER / BJORN FALK
SOL1800005 / CONSTRUCTION
Installation of a 3.6kW solar PV system. Roof Mounted, 10 panels
300 M ST SE STE# 400   
01/03/18 
FEDERAL CENTER LP / SAM HOLLEN
B1803531 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE CONFERENCE ROOM. PARTITIONS, CEILING, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 680 SQUARE FEET. CACI SUITE 400
25 POTOMAC AVE SE DOCK 79   
01/11/18 
RIVERFRONT HOLDINGS I LLC / null
P1802701 / SUPPLEMENTAL
227 TINGEY ST SE   
12/29/17 
JW CAPITAL PARTNERS / MELISSA DIAZ
FD1700126 / CONSTRUCTION
Parcel L1- Foundation to Grade permit for the new construction on an 11 story full service hotel building with restaurant and retail.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.