Not quite six months after buying the land on the northeast corner of Half and N streets across from Nats Park currently known as Monument Valley, the MacFarlane/Jair Lynch joint venture has now submitted to the Zoning Commission its new plans for the site, a 10-story building with 461,700 square feet of residential (and possibly hotel) development, combined with at least 60,000 square feet of retail.
Back a couple of lifetimes ago, Monument Realty also planned a residential, retail, and hotel project on this site, so this filing is actually a modification to the previously approved plans. The new designs by architectural firm Hord Coplan Macht, seen in these renderings purloined from the zoning filing, would add at least 23,000 square feet of retail to what had been planned, mostly in the second-floor space along Half Street, as shown in the drawing below, as well as potentially an additional 8,000 square feet on the second floor facing N Street, depending on the all-important "market conditions."
The new project would have either 445 residential units and no hotel at all, or 365 residential units and a 80-room hotel on the north end of the site (down from a 200-room hotel in Monument's designs). The new design includes condos (apparently 130ish of them) in the south wing along N Street, with the rest being rental units.
As in the original designs, there would still be a small street called "Monument Place" running between this building and its neighbor to the north, 55 M Street, allowing the retail offerings to wrap around onto the building's north side--however, in these new plans it would be a pedestrian-only street, negating the need for a curb cut on Half Street.
In addition, the basically-an-alley Cushing Place would still be extended through to N Street, through an opening in the ground floor of the south side of Lynch's building. (If you look closely at the top rendering, you can see it.) There would still be three levels of underground parking with approximately 231 spaces. And there would be all manner of streetscape work to make the sidewalks--and the walk to the ballpark--a bit more inviting than they are now.
For you zoning groupies, there's also one special exception being requested, that the project be allowed to have two roof enclosures instead of one on the south wing of the building that fronts N Street. And note that this is all under the Capitol Gateway Overlay design review process.
These new plans will be presented to ANC 6D on Monday night (March 9), with a zoning hearing date apparently as yet unannounced. My Monument Valley project page has a few of the old Monument renderings, should you wish to compare.
UPDATE: The zoning hearing is apparently now scheduled for May 28.
Comments (13)
   
 
 More About Monument Valley/Half St.

JDLand.com Home

Comments

BLT says: (3/8/15 8:33 PM)
The good thing is once construction does begin, it will go vertical rather quickly! This is exciting to see.


JES says: (3/9/15 11:54 AM)
So I'm not too familiar with construction timelines. Assuming zoning has no issues with this plan, what would be the earliest we'd see construction starting? A year?


JD says: (3/9/15 11:58 AM)
They have said they are targeting 2016. A CG Overlay review is a quicker process than a PUD, especially since this is a modification. Then it's building permits. And finalizing construction financing.



BLT says: (3/9/15 12:39 PM)
Looks like a construction trailer and equipment have arrived at the Homewood Suites site today. They were wotking on the fencing earlier today.


JD says: (3/9/15 12:40 PM)
If you're having trouble keeping track of the Half Street 2.0 resurgence, I created this handy graphic:
link

It's part of my spruced-up-for-Opening-Day What's New Since Last Season page:
link



JD says: (3/9/15 12:41 PM)
@BLT, thanks for the update! I look forward to the race amongst readers to be the first to report ground being broken there. :)


BLT says: (3/9/15 3:53 PM)
And the Bonchon signs are going up! I should win a jdland t-shirt for this special reporting. :)


JD says: (3/9/15 5:40 PM)
Since MJM sent me a pic on Twitter showing fencing stuff happening at the Ballpark Square/99 M site, can somebody confirm that there was also stuff happening today at the 50 M/Homewood Suites site? (right across Half from the Big Stick)



BLT says: (3/9/15 5:56 PM)
@jd...I can walk over to 50 M and snap a picture. Can I send to an email?


JD says: (3/9/15 6:01 PM)
Sure! You can just send to jd at jdland etc. Thanks.

(Not that I didn't trust you--just that sometimes people confuse project locations, and since there was action elsewhere, just wanted to be doubly sure.)


BLT says: (3/9/15 6:07 PM)
No problem. Lots going on around here and I'm sure sites are confused often.


JD says: (3/9/15 6:10 PM)
I now have photographic evidence that BLT was correct. :)



Westnorth says: (3/10/15 11:43 AM)
60,000 feet -- finally, a retail space big enough for a "junior anchor." Most of the buildings around here have had spaces <20,000 feet, and there's only so much specialty retail to go around so far.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

jdc on June Construction Update: Sigh. If only, as shown in that photo, that segment of Half Street would be clos...
202_cyclist on June Construction Update: JD-- thank you for posting the article. I'm impressed by the engineering requir...
JD on June Construction Update: And since I skipped writing about the new Douglass Bridge, here's a good piece a...
malatesta on June Construction Update: That's, uh, not a very good article. It's correct in that I know there's plenty ...
202_cyclist on June Construction Update: Well, One Hill South looks a lot more comfortable than a baby prison.
202_cyclist on June Construction Update: @RMP— BARF! BARF! and BARF!
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/19/18 
CAPPER CARROLLSBURG VENTURE LLC / null
E1807795 / SUPPLEMENTAL
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
100 H ST SE   
06/19/18 
DISTRICT OF COLUMBIA / RUSSELL COX
FD1800083 / CONSTRUCTION
Construction of foundation only
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
1200 NEW JERSEY AVE SE 20590   
06/20/18 
JBG/FEDERAL CENTER LLC / ALFRED F JORDAN 202-437-5067
E1807865 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.