Since January, 2003
            
 Sliding from Before to After

FLASH
EXCLUSIVE
MUST CREDIT JDLAND
I would not want anyone to think I am not providing the news that is of utmost interest and importance, so please study the photo at right (click to enlarge) to confirm with your own lying eyes that work is now underway on the concrete slab at the bottom of the 800 New Jersey/Whole Foods hole. In other words, there's nowhere to go but up now.
You'll still have to wait until at least 2017 to get your quinoa, but this summer the view into the neighborhood from the freeway should be changing yet again.
This has been a JDLand Special Report. We now return you to regularly scheduled programming.
Comments (15)
   
 
 More About 800 NJ/Whole Foods

JDLand.com Home

Comments

JD says: (2/4/15 3:11 PM)
OT: I'm working on a real post on this (you know, doing some *reporting*, which can take a bit of time), but so that @202_cyclist doesn't have an attack I will note that 909 Half Street got its shoring permit today.


JES says: (2/4/15 4:23 PM)
909? Are they still building this? link


JD says: (2/4/15 4:26 PM)
I assume so.


JD says: (2/4/15 4:28 PM)
The shoring permit is "EXCAVATION SHEETING AND SHORING AS PER PLAT AND PLANS FOR A NEW MIXED-USE BUILDING CONSISTING OF 13 STORIES AND 3 BELOW GRADE LEVELS OF PARKING." They remain decidedly tight-lipped, though.


JES says: (2/4/15 4:30 PM)
Grrr. I like pretty renderings.


JD says: (2/4/15 4:32 PM)
I'm pretty sure this is the first time in my 12 years of this that a project has gotten to an approved excavation permit without my seeing a single drawing.


JD says: (2/4/15 4:44 PM)
... And, for those not following the mini-discussion on Twitter, apparently the Ballpark Square site (1st Street just south of M) has been locked up, with parking booths removed. The south end of this lot has its excavation permit--the north end is the 99 M office building site, with no approved permits. But perhaps that footprint is going to be staging for the Ballpark Square (residential/hotel) work.

Also keep an eye for any sudden movement at 50 M.

I am going to drop from exhaustion trying to keep track of all of these once they get going--that's four probably starting Any Minute Now, if you count BP Square, 50 M, 909 Half (all with excavation permits approved), and then the likely 82 I start.


JES says: (2/4/15 4:59 PM)
But have Homewood Suites and BP Square been removed from the Nats parking inventory yet? THAT is the question!


JD says: (2/4/15 5:01 PM)
Neither of them were Nats lots last year. 99 M was, though.


JES says: (2/4/15 5:18 PM)
Ahh. Did not know that.


JD says: (2/4/15 5:23 PM)
They were still cash lots, but weren't Official Nats lots. I think the 50 M site went out of the Nats inventory at least two seasons ago, if not three. I wrote last year about the southern half of Lot F not being part of the inventory, and how they were planning that the lot would be unavailable not long after the start of the season because of the start of construction. (Tee hee.)

But this now makes two official Nats lots out of the official inventory from last year--the stub Lot F and the 1015 Half garage Lot P, along with two cash lots (50 M and BP Square). Forest City will bring 220ish spaces back when the lot gets built on the southwest corner of the Spooky lot, but otherwise, we may be starting to see a bit of lot scarcity. And it's generally only office buildings that offer public parking in their underground lots, so it may be a while before there's new offerings underground.



JD says: (2/4/15 5:25 PM)
(.... though maybe BP Square will have some public parking available in its garage thanks to the hotel and all of that retail.)



JES says: (2/4/15 8:07 PM)
We all knew the surface lots had a limited shelf life anyway. The fewer suburbanites blowing stop signs and almost running into me in crosswalks, the better.


Alan says: (2/5/15 10:26 AM)
The 50 M lot reverted to a Nats lot overnight midway through the season last year--no idea why. I want to say it was marked for Lot H permit holders, but can't remember. Never really filled up though during any games except playoffs.


JD says: (2/5/15 10:29 AM)
It was Lot J, I think. Lot H is the garage at 20 M, so maybe it was overflow.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

conngs0 on Peet's Grand Opening: NavyYardNittany, thanks for the update. I'm glad to see there's some evidence o...
NavyYardNittany on Peet's Grand Opening: Checked out the interior of TSTSNBN yesterday and it looks very close - decorati...
Gamble Rogers on Peet's Grand Opening: “Whole Paycheck” graffiti is the Roman catecomb graffiti of the 21st century. So...
JD on Peet's Grand Opening: South Capitol Hill! SoCHill! Exactly what Mr JDLand named the Hood! A reader ...
malatesta on Peet's Grand Opening: In other TSTSNBN news, it looks like they're starting to staff up: https://caree...
JD on Peet's Grand Opening: Looks like "Dryy," a "full service garment care" operation, is coming to the gro... [image]
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 08/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/15/18
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18

Recent Issued Building Permits Archive  
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.