Since January, 2003
            
 Sliding from Before to After

The empty lot on the northwest corner of New Jersey and I with the address of 82 I Street is the latest entrant in the latest wave of residential news in Near Southeast, as public records show the 20,000-square-foot site has been sold for what the deed says is $12.25 million.
The Washington Business Journal reports that the lot was purchased by Greystar with plans for a 234-unit apartment building, with what they say is an October 2014 start date, though they'd better start filing building permit applications soon to meet that date.
WBJ also has a rendering of the building, designed by R2L and echoing its neighbors, the 70/100 I buildings and 909 New Jersey,
If it does start this year, it joins a number of other residential projects underway, including its neighbors-to-be across the street the Park Chelsea and 800 New Jersey, along with River Parc one block to the south, Arris at the Yards, the Lofts at CQ at 7th and L, and (presumably) 1111 New Jersey down the block (with Twelve12 now considered substantially completed, as move-ins have begun).
I do wonder if at some point we'll hear the story of the deeds exchanged between the previous site owners and CSX earlier this year for small plots of land, in what appears to be the wake of a lawsuit filed by CSX.
(And I'm irked because I had been hearing rumors of this for weeks, and had been checking public records religiously looking for confirmation. Then as soon as I leave town, boom.)
Comments (10)
   
 
 More About Development News

JDLand.com Home

Comments

JES says: (7/18/14 2:20 PM)
Any retail? Also, developers must be super bullish on our area, this seems like a LOT of product to hit all within a 2 year span.


ZoolanderANDtheBoYz says: (7/18/14 3:50 PM)
I thought street numbers increment. They don't suddenly decrement.
70 I, 100 I and 84 I. The address should have been 104 I street or something greater than 100. May be the city need to correct it.


Blue says: (7/18/14 5:08 PM)
All of these buildings look alike. BORING!


Daedam says: (7/20/14 2:32 PM)
To Zoolander's point, I've always wondered why Axiom was allowed to be 100 I, since it seems to be entirely west of 1st. Seems like it should have been 80 I or something.


JonC0226 says: (7/21/14 11:53 AM)
Wow. They are really going to over saturate the market down here. I guess that is a good thing in the near time with rental prices, but could offer some problems in the long term. We need some retail space, and I can't wait for that movie theater to be built.


conngs0 says: (7/22/14 12:40 PM)
I suppose over-saturating the market is a concern, but it seems like the extra residential space is absolutely necessary to sustain the retail that's already planned. Moreover, over-saturation of the residential market can be prevented by ensuring that the neighborhood has an even distribution of retail, residential and office space. Are we coming up short on the third component there?

You'd think that the increase in both residential and retail, combined with the relatively easy access to the freeway and a few metro stops (and Congressional office buildings), would really cause the neighborhood to become a more attractive destination for office space.


JD says: (7/22/14 1:06 PM)
There's still plenty of office developments on the boards, and at least one planning to get underway this year or next year (99 M, southwest corner of 1st and M).

But it's not hard to find stories about the contraction in the DC office market, not to mention that few projects are built on spec anymore (though 99 M will be).

When the Post was looking for its new home, and I was crossing my fingers that they'd pick 1015 Half Street, I did hear that companies are still a bit iffy about setting up on the Green line, as opposed to Red/Orange/Blue(/Silver!).



JES says: (7/22/14 5:29 PM)
So Skanska is for sure going to build 99 M on spec? Wow.


JES says: (7/22/14 5:30 PM)
Oh, and anyone still scared of the green line needs to get out more. But I understand that stereotypes take a while to die. My wife works out in the suburbs a lot and many of her co-workers still consider the entirety of DC to be "dangerous," let alone "southeast DC."


JD says: (7/22/14 5:32 PM)
Not 100000000% sure on 99 M, but no announcement of any tenants, and if they are planning to start this year or early next....

(Plus I vaguely remember stories when Skanska bought the site that they had the pockets to go spec if they chose to.)


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on I'm Dreaming of: I posted the link partly because I'm a Detroiter. Folks in SE are championing De...
jdc on I'm Dreaming of: Love the grandma slices at Wise Guys. And being from MI too, I also love Buddy's...
VelocityChris on I'm Dreaming of: The description and picture of the Detroit-style pizza sounds/looks just like th...
JD on I'm Dreaming of: Longtime readers may remember the many trips with Mr JDLand to Michigan, where h...
dcgent on I'm Dreaming of: Detroit-style pizza coming to undisclosed navy yard location https://dc.eater.c...
Westnorth on I'm Dreaming of: XO sauce is fish-based, as with many Cantonese sauces: https://en.wikipedia.org/...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
   
12/06/19 
ASANA PARTNERS / S.A. COMUNALE; S.A. COMUNALE
P2001954 / SUPPLEMENTAL
1346 4TH ST SE   
12/06/19 
KAITLYNN MATTEO / W. SAKIE - BHAR; W. SAKIE - BHAR; NA
SG2000117 / CONSTRUCTION
Install one set of non illuminated sign on to existing store front building
861 NEW JERSEY AVE SE   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ā€˜Lā€™ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
71 POTOMAC AVE SE   
12/06/19 
MPR REALTY / BOB BIROONAK; BOB BIROONAK; ART DISPLAY CO
SG2000099 / CONSTRUCTION
One building name MAREN Two set of address numbers all signs are non-illuminated
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.