Since January, 2003
            
 Sliding from Before to After

Last week DDOT announced the four teams that have been chosen to advance to the next round and battle it out for the grand prize of being able to design and build the new Douglass Bridge and its approaches as well as reconstruct the Suitland Parkway/I-295 interchange, a prize package worth at least $608 million.
These four teams will now have the opportunity to respond to DDOT's Request for Proposals on the project, which should be released at some point in the not-too-distant future.
The two reconstruction projects are officially known as Segments 1 and 2 in the two-phase/five-part South Capitol Street Corridor Project, which will also eventually extend the "grand boulevard" feel from a reconfigured M Street intersection north to the Southeast Freeway, build a new on-ramp there, and throw in some streetscape enhancements along New Jersey Avenue as well.
I missed out on a fair amount of discussion of this project last year, including the mayor "announcing the new design" of the bridge that was only marginally different than the design that's been on the boards for a number of years (though the announcement did include a cool video). The announcement was followed by some controversy over the size and necessity of the traffic ovals and even the bridge design itself. (But some cyclists seem okay with it.)
I also didn't get the chance to note that the position of the bridge has undergone some alteration, in that the new bridge's footprint is now designed to run completely parallel to the current bridge, instead of a more diagonal alignment from the original EIS, which you can see compared on pages 11 and 12 of this October 2013 project update.
In the fall, both the National Capital Planning Commission and the Commission of Fine Arts looked at the project, with the latter pooh-poohing the "uninspired" bridge design and calling for a the design-build process to come up with a "more innovative proposal" instead of the Memorial Bridge-like arched bascule design that DDOT has chosen. Both commissions are generally supportive of the two ovals, though NCPC's comments after a November review of the project notes that more discussions of the western oval (just southwest of Nationals Park) "will need to occur to help further the ideas of creating a vibrant destination."
While waiting for the RFP to be released and for the designs of the bridge and the ovals to be "refined" for NCPC/CFA approval, you can check out my Douglass Bridge project page, my South Capitol Street page, and the reams of words I've written about both over the years.
Comments (2)
   
 
 More About Douglass Bridge

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (2/2/14 11:56 AM)
What's going to happen to the cement factory on Potomac avenue (east of the Oval)?


monkeyrotica says: (2/3/14 11:59 AM)
What's an "inspired" bridge design? Ziplines and a rock climbing wall?
MAYBE NOT!

link

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RMP on Signage, and Not-Yet-Signage: Not sure if this signage is being saved for a future post, but I know it's one t... [image]
JES on Retail News: FYI, we had Morini over to Velocity yesterday for an event and they confirmed th...
JD on Retail News: If you want to help support Van Ness Elementary via their silent auction, up for...
202_cyclist on Retail News: RMP-- not to quibble but I assume Winter 2019 is Dec. 2019. There is still suff...
RMP on Retail News: @202_cyclist by my count they've only got a week left if they're going to do &qu...
202_cyclist on Retail News: @RMP— I give up. What is the mistake on the ad?
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 03/18/19
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/19
1300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/17/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
02/22/19 
FC 1331 LLC / null
P1904018 / SUPPLEMENTAL
   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
   
03/18/19 
FC 1331 LLC / BEN BEDDO
TL1900017 / CONSTRUCTION
REVISION to existing permit TL1700205 submitted to reduce scope of work to the permitted set to reduce costs.
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
2 I ST SE   
02/22/19 
MCDONALDS CORPORATION / null
P1904020 / SUPPLEMENTAL
150 I ST SE   
02/21/19 
WILLIAM C SMITH CO / null
E1904635 / SUPPLEMENTAL
   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
328 I ST SE   
02/22/19 
BRIAN HUSEMAN / MATTHEW MALASKA
P1904003 / SUPPLEMENTAL
   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
250 M ST SE   
02/21/19 
SQUARE 769 LLC / BRIAN C STROTT
B1813732 / CONSTRUCTION
9 story office building with 3 levels below grade. 188,000 gross sqft
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
880 NEW JERSEY AVE SE   
02/21/19 
880 NEW JERSEY AVENUE LLC / CLYDE HURST; CHRISTOPHER P COWIE
B1901729 / CONSTRUCTION
alterations to an existing 688 SF vacant space to add mechanical, plumbing and electrical fixtures to accommodate a future tenant. Future tenant fit out will be provided under a separate permit. This permit is for the landlord work only. The existing space is recently constructed building shell that has not been occupied by a previous tenant.
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.