The neighborhood appears to have (yet) another residential project likely to get underway in 2014, as the DC Housing Authority has finally gotten the financing together for the long-planned 195-unit mixed-income residential building at 7th and L SE, on the site of the old Capper Seniors building.
The building permit for the project was approved a few months ago, and with money now in place, it's expected that dirt should begin to move within a few months ("expected" as always being the key word). This building, which will face the Marine Bachelor Enlisted Quarters across L, will be all rentals, and will have 39 affordable housing units alongside the market-rate offerings.
Documents filed with the Recorder of Deeds refer to the project as "The Lofts at Capitol Quarter." The building will be run by Forest City's residential management arm, and will have a fitness room, roof decks, interior courtyards, and meeting space. It's expected to take about 20 months to complete once construction begins.
Nats fans may be a bit chagrined by this news, though, since the new building will take out a chunk of Economy Lot W, cutting the number of spaces down to 186 once the lot is reconfigured (hopefully by Opening Day).
Note that this building is only on the north side of the block, which is why Lot W isn't disappearing completely--yet. The south side is slated to someday be a sizeable office building, though no start date appears to be anywhere on the boards for that.
This will be the first mixed-income apartment building to come out of the Capper Hope VI redevelopment; the first two apartment buildings completed--Capper Seniors and 400 M--are both all affordable-housing units. Four (or maybe five) additional residential buildings, with another 900-plus mixed-income units including about 285 affordable units, are still to be built before Capper reaches full build-out of its residential component.
This project is now on the 2014 docket along with Forest City's Yards/Parcel N, WC Smith's 800 New Jersey (aka The Whole Foods Building), and Donohoe's 1111 New Jersey, if these developers can make it past my jaded skepticism about announced start dates (well earned during the Lean Years of 2008-2012) and start building.
Already under construction and expected to open in the next year or so are rental projects Twelve12, River Parc, and the Park Chelsea.
And, when the Lofts at Capitol Quarter are completed, the south side of L Street between 5th and 7th will look a little different from what was there before:
Comments (9)
   
 
 More About The Bixby

JDLand.com Home

Comments

JES says: (1/7/14 9:48 AM)
Hey, at least they're keeping this one mixed and not segregating it...


202_cyclist says: (1/7/14 11:47 AM)
This is good to see. This section can be a bit desolate when walking between Barrack's Row and the Capitol Riverfront/Navy Yard. Hopefully this will also encourage more redevelopment of lower 8th Street.


JD says: (1/7/14 11:51 AM)
Also worth remembering that the Marines wanted to take this land and to build their new barracks (across from the BEQ) and then close L Street so that there would be no public access. DCHA fought them pretty vociferously.



SWag says: (1/8/14 2:35 PM)
I don't understand that first rendering. What is that? What am I looking at? Someone help!


JD says: (1/8/14 2:38 PM)
You are looking south down 7th Street. The Marine Barracks/BEQ would be on the grassy area to your right, if they had shown it in the rendering. The office building at rear doesn't exist yet--it would front M Street, looking into the Navy Yard.

The new building will run along the south side of L Street between 5th and 7th. The people with those windows you see will be looking across L to the Barracks/BEQ.



SWag says: (1/8/14 2:59 PM)
I see. The building itself looks similar the the town homes already in the area. Doesn't look like it is going to be very tall. And thank you!


JD says: (1/8/14 3:11 PM)
Yes, and the building behind looks like the back of 300 M, so it really looks like what you'd see looking down 4th Street at L.

Originally this was going to be more townhouses, but then they opted for an apartment building. And no, not very tall. Will be interesting to see how it comes out.


ZoolanderANDtheBoYz says: (1/8/14 5:42 PM)
It looks something like this link

The rent will be probably be a lot more cheaper compared to the other high rises apartments in the neighborhood.


Westnorth says: (1/10/14 4:56 PM)
Yep, since it's not a "full service luxury" building the market-rate units will probably come in at a much better price point. Plus, since it's low-rise it'll take less time to build than a high-rise would -- if it breaks ground this spring, it'll deliver about when the Toll Brothers building (already well underway) will.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News

202_cyclist on Wednesday Tidbits: As the kiddos say, does anyone have any deets about the new urban vegetable gard...
Section314 on Wednesday Tidbits: 202. You missed the B2 stealth bomber at the end. That was exciting and slight...
E. Masquinongy on Columnist Walks the: Alex B, the development of "NoMa" was the logical follow-on to the dev...

Get JDLand Updates In Your Inbox!


Latest News
  
For past mile markers in the neighborhood's evolution,
see my Near Southeast DC Timeline.

 
Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
16 B/O M ST SE   ROBBERY  09/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/19/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/18/16
1200 B/O 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  09/17/16
400 B/O M ST SE   THEFT
Shoplifting
 09/16/16
1100 B/O 5TH ST SE   THEFT
Theft First Degree (all Other Larceny)
 09/06/16
700 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/06/16
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/04/16
UNIT B/O I ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 09/04/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/28/16

Recent Issued Building Permits Archive  
1233 1ST ST SE   
09/16/16 
NA BALLPARK HOTEL LLC / NORTHEAST ELECTRIC; NA BALLPARK HOTEL LLC; HOSSEIN ECONO SIGN INC.
SG1600390 / CONSTRUCTION
To Install four signs: -3 - Channel letters on Raceways -1- Blade Sign
1331 2ND ST SE   
09/19/16 
DC WATER / DC WATER; CORMAN CONSTRUCTION
AH1601056 / CONSTRUCTION
After hour work for structure excavation and support for building permit B1311474 DC Water, Corman Construction 202-863-0052
933 5TH ST SE   
09/12/16 
null / NA NA NA
EHOP16924112 / HOME OCCUPATION
1015 HALF ST SE   
09/14/16 
HALF STREET SE LLC HALF STREET SE LLC / DARIN PASQUALLE; HALF STREET SE LLC HALF STREET SE LLC; DARIN PASQUALLE
E24765056 / SUPPLEMENTAL
   
09/21/16 
HALF STREET SE LLC / 1015 HALF SE LLC; JOHN GIUSEPPE-RAMCO
B1610675 / CONSTRUCTION
Construction of elevator lobby and common corridors on the 7th floor as shown on the electronically submitted mechanical, electrical, fire protection, and arch. dwgs. Interior work only. No structural work involved. approx. 2275 sf.
1210 HALF ST SE   
09/07/16 
HINES GLOBAL REIT 55 M STREET LLC / MATT LOSIGNOR
P1609218 / SUPPLEMENTAL
75 I ST SE   
09/07/16 
99 I ST SE LP / 99 I ST SE LP; ECS MID-ATLANTIC, LLC C/O REBECCA RUSCHMAN
SB1600354 / CONSTRUCTION
We will perform 2 soil borings and 2 CPT cone soundings on the site. The 2 soil borings and 2 CPT soundings will be extended to depths on the order of 90 ft below the existing site grades. The borings and soundings will be perfroemd within the bounds of private property and will be drilled utilizing a 3.25-inch hollow stem, continuous flight augers and generate a 6-inch annulus. After the borings...
82 I ST SE   
09/09/16 
GDVC EYE STREET LLC / MITCH A. PERMUY
E1609957 / SUPPLEMENTAL
88 K ST SE   
09/07/16 
99 I ST SE LP 99 I ST SE LP / 99 I ST SE LP 99 I ST SE LP; ECS MID-ATLANTIC, LLC C/O REBECCA RUSCHMAN
SB1600355 / CONSTRUCTION
We will perform 2 CPT cone soundings on the project site within the bounds of private space. The CPT cones will be extende to a depth of 90 feet below the existing ground surface, utilizing a 4-inch diameter cone and generate a 4-inch annulus. After the soundings are completed they will be backfilled with bentonite slurry which has a consistency of two pounds bentonite powder to one gallon water.
80 M ST SE 400   
09/15/16 
WELLS REIT II 80 M STREET LLC / null
P1609454 / SUPPLEMENTAL
50 M ST SE   
09/15/16 
KCG 50 M LLC / KCG 50 M LLC ENGLEWOOD LLC; TRACIE CLAXTON; CLAXTON
SG1600460 / CONSTRUCTION
2 Wall mounted Signs - Reversed Channel Letter 2 small wall mounted plague
80 M ST SE   
09/09/16 
WELLS REIT II 80 M STREET LLC / PHILIP G DONNELLY
E1609959 / SUPPLEMENTAL
99 M ST SE   
09/16/16 
BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVELOPMENT / BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVEL
AH1601047 / CONSTRUCTION
Place concrete mat foundation slab. Before work hours - 3AM to 7AM on 9 / 19 / 2016 and 9 / 20 / 2016, if weather or jobsite delays prevail. Permit will only be needed / used for 1 of the 2 days. (Per ANC agreement "before hours work on ONE of the following days: either September 17, 19, or 20," & "to begin no earlier than 3:00 am" )
   
09/16/16 
BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVELOPMENT / BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVEL
AH1601048 / CONSTRUCTION
Place concrete at 99 M Street SE for mat foundation slab. Saturday 9 / 17 / 2016 concrete placement from 3AM to 7PM. (Per ANC agreement "before hours work on ONE of the following days: either September 17, 19, or 20," & "to begin no earlier than 3:00 am" )
100 M ST SE 4   
09/09/16 
SQUARE 743 INC / null
P1609322 / SUPPLEMENTAL
100 M ST SE   
09/20/16 
QUARE 743 INC / QUARE 743 INC; QUARE 743 INC; PHILIP HAUHN
E14003252 / SUPPLEMENTAL
202 M ST SE   
09/09/16 
UNITED STATES OF AMERICA / EBONY BROWN DC HUMANITIES AND ARTS COMMISSION
TN1600199 / CONSTRUCTION
SPECIAL EVENT 202 ARTS & MUSIC FESTIVAL 1 SL 250 24 X 32 STAGE
1100 NEW JERSEY AVE SE 845   
09/21/16 
SQUARE 742 LLC SPAULDING & SLYE C/O WC SMITH / SQUARE 742 LLC SPAULDING & SLYE C/O WC SMITH; WILLIAM SNODDY
B1612012 / CONSTRUCTION
Interior Renovation on the 8th Floor on behalf of Maxim Health 5,138 sqft
1100 NEW JERSEY AVE SE   
09/14/16 
SPAULDING AND SLYE SPAULDING AND SLYE / HALEY HUGGINS; SPAULDING AND SLYE SPAULDING AND SLYE; JOHNNY RILING
E39166644 / SUPPLEMENTAL
125 O ST SE   
09/19/16 
DISTRICT OF COLUMBIA / DC WATER HQ; DAVID FONTANA MSC
EX1600110 / CONSTRUCTION
Site grading and demo per erosion control plan only for future new DC Water HQ building under seperate permit.
1244 SOUTH CAPITOL ST SE   
09/19/16 
1244 SOUTH CAPITOL RESIDENTIAL LLC / RONALD C. CAYTON
E1610018 / SUPPLEMENTAL
385 WATER ST SE   
09/15/16 
FC 385 WATER LLC / EDUARDO L. LOPEZ
E1610139 / SUPPLEMENTAL
355 WATER ST SE   
09/14/16 
OLIVIA DARROW RAGNAR EVENTS LLC
TN1600198 / CONSTRUCTION
SPECIAL EVENT RAGNAR RELMAY WASHINGTON DC 2 20 X 20 TENTS 25 10 X 10 TENTS 1 30 X 40 TENT FENCING FOR BEER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.