Since January, 2003
            
 Page Through from Before to After

I guess Whole Foods figured that waiting another month for an official announcement after yesterday's flurry of news was a little unnecessary, because this morning there is an official release--and a new rendering, with all the appropriate signage (click to embiggen). The under-construction Park Chelsea is visible to the right, so this view is of the corner of New Jersey and H.
The William C. Smith release:
"Washington, DC - Developer WC Smith has signed Whole Foods Market to anchor the retail portion of its $443 million development in the District’s Capitol Riverfront neighborhood. The 36,000 square foot store will be located on the first floor of the second of three residential buildings the company has in development on New Jersey Avenue SE, two blocks from the Navy Yard Metro station.
"'We are delighted to welcome Whole Foods to the Capitol Riverfront neighborhood,' said Chris Smith, chairman and CEO of WC Smith. 'Their dedication to healthy living and commitment to community dovetails with our mission of creating green, sustainable communities for residents of the District of Columbia.'
"The first component of the new development, a 432-unit luxury apartment building known as Park Chelsea, is currently under construction with a projected fall 2014 delivery date. Construction on the second building is scheduled to begin early in 2014, with a 2017 opening of the Whole Foods Market and delivery of 336 residential units. The residential units will offer 10 foot ceilings and a commanding view of the Capitol and the monumental skyline. Completion of the third Class A residential building will bring the unit total to over 1,100 for the development.
"All of the buildings will provide on-site parking and will be highly amenitized with club rooms, rooftop pools, and exercise facilities. Additionally, each site will offer a unique amenity space for use by residents of all three buildings. Those amenities include an indoor lap pool, an all-purpose gymnasium, a demonstration kitchen, and a 15,000 square foot courtyard. The development is within walking distance of both the Navy Yard and Capitol South Metro stations and adjacent to newly created Canal Park with water features, ice skating rink, public art, programmed activities, and Park Tavern restaurant."
UPDATE: The separate joint release with Whole Foods is a little long to cut-and-paste, but there's this quote:
"'Washingtonians asked and we listened,” said Scott Allshouse, Whole Foods Market Mid-Atlantic regional president. “People who live and work in Southeast have been requesting a Whole Foods Market for some time. We are thrilled about finding the right fit given the combination of factors that go into deciding on a new location.'"
Comments (6)
   
 
 More About Agora/Whole Foods

JDLand.com Home

Comments

JES says: (10/23/13 9:08 AM)
JD, is there a link to the WF release for those of us who'd like to read the whole thing?


JD says: (10/23/13 9:13 AM)
Sure, here it is:

link


JES says: (10/23/13 9:25 AM)
thanks!


IanK says: (10/23/13 10:26 AM)
It took me a vexingly long time to figure out the orientation of the buildings from the rendering. The highway runs the length of the left edge of the photo adjacent to the to-be-extended H Street. It totally threw me off.


JD says: (10/23/13 10:30 AM)
You are correct sir, yes!

(There probably won't really be that much green space north of H and south of the freeway. Just as there probably aren't going to be all those high-rise buildings off in the distance, unless that's Hill East. :-) )


ZoolanderANDtheBoYz says: (10/23/13 3:21 PM)
The grassy area rendered north of the upcoming Wholefood store used to be a horse stable. Is that owned by CSX?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Slider-Palooza 2019: The lobby, roof, and 4th floor meeting space are available for rental.
conngs0 on Slider-Palooza 2019: I totally agree that the first floor of the DC Water HQ looks fantastic. I hope...
conngs0 on Catching Up on: Brett M, I echo your disappointment on the structure of the new Capper Senior Ce...
CJBabyDaddy on Slider-Palooza 2019: A lovely lobby does not a public museum make. A rentable rooftop does not an ob...
JD on Slider-Palooza 2019: It is a lovely public area that requires one to be escorted by a DC Water staffe...
walt on Slider-Palooza 2019: question for an expert: DC Water has what I thought were "public areas&quo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/17/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
1037 5TH ST SE   
10/18/19 
JOHN P LANG / SOLAR SOLUTION DC LLC; SOLAR SOLUTION DC LLC
SOL1901920 / CONSTRUCTION
To install 4.29 kW size of solar panels with a system height of 1.1 feet on roof of building,
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
100 M ST SE   
10/21/19 
SQUARE 743 INC / JOHN C. BLOCK; JOHN C. BLOCK
E2000895 / SUPPLEMENTAL
   
10/21/19 
SQUARE 743 INC / null
E2000932 / SUPPLEMENTAL
300 M ST SE   
10/17/19 
FEDERAL CENTER LP / SUKWON KIM; SUKWON KIM; NA
SG1900286 / CONSTRUCTION
To install a set of illuminated LED channel letters on raceway onto wall
   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 420   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000949 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 4TH FL   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000951 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 102A   
10/17/19 
SQUARE 742 LLC / STEPHEN TAYLOR; CHRIS PADBERG
B1913851 / CONSTRUCTION
Convert 'office' tenant space to 'The UPS Store'. Interior work only. minimum work done. 990 sq ft. No plumbing. Change diffusers and ceiling tiles. Install UPS furniture and add a few outlets.
1100 NEW JERSEY AVE SE   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1915102 / CONSTRUCTION
Revision to previous permit number B1911194 Expansion of Tenant's Current suite into Adjacent Suite has already been "white boxed". Expansion space to consist only of workstation and Offices. Some Minor Demolition will occur in tenant existng suite in order to rework existing tenant entry and enlarge tenant reception. addition of storage closet will be added in place of existing corridor.
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; CHRIS CONDON
B1913780 / CONSTRUCTION
Tenant Finish Out. Existing Conditions to be Demolished and New Space Built to Landlord Standards to Include new Ceiling grid lighting and Finishes **LEVEL 2 ALTERATION
   
10/21/19 
SQUARE 742 LLC / STEPHEN TAYLOR; NA TBD
B2000682 / CONSTRUCTION
Revision to existing issued permit #B1913851: Furniture layout revision, mailboxes changed location. Electrical outlets relocated per furniture changes.
   
10/22/19 
SQUARE 742 LLC / ;
P2000628 / SUPPLEMENTAL
   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.