Page Through from Before to After
A report this morning from GlobeSt.com says that PM Hospitality Strategies is close to a deal to manage a hotel located in what they describe as "in Capitol Hill, specifically the Navy Yard" (eww). "Principal Joseph Bojanowski tells GlobeSt.com that the developer is currently wrapping up development financing and will ink a deal on the project shortly. 'The land was purchased last month and the hotel is expected to roughly deliver in mid-2015,' he says."  The article doesn't give any additional details on where the hotel might actually be, and the story's RSS summary describes it as "a 165-key hotel in Capitol Hill," but given that the story's headline is actually "PM Hospitality Eyes Navy Yard Hotel," and assuming that the project won't actually be *in* the Washington Navy Yard, signs point to this being the L-shaped hotel planned for the corner of 1st and N SE on land formerly owned by the Welch family. Those plans for a 13-story 167-room hotel were okayed by the Zoning Commission in December, and in mid-March a $5.44 million sale was recorded of the Welch lots to Capital Riverfront Hotel LLC. (The rendering at right is from the zoning filings.) At the zoning hearing, representatives of the developer said that it was expected that construction would take about 16 months, which would point to a start date sometime in early 2014 to then deliver in mid-2015 as the article says. The 1st and N hotel will have no on-site parking, and no ground-floor retail space. ( UPDATE: Per commissioner David Garber in the comments, there will be no "traditionally leased" retail space, but there will be a retail space operated by the hotel facing N Street, which is shown in the final zoning drawings as a restaurant or bar.). It wraps around Grosvenor's planned two-story retail building, and would be nestled between the residential buildings also planned by Grosvenor and Monument. My previous post on this hotel project has additional details. PM Hospitality Strategies is an affiliated company of the Buccini/Pollin Group, which is the developer listed on this project's zoning documents. BPG owns properties throughout the mid-Atlantic, including the Madison Hotel. Not known at this point is the brand this hotel will operate under, though of course I hope they call it the L Hotel. ( UPDATE: Or not, given how now we're all mistakenly referencing it being on L Street.)
JDLand.com Home
David Garber says: (4/3/13 9:45 AM)
Although this project doesn't have any "traditionally leased" retail space -- we did negotiate that the ground floor meeting room facing L Street be changed to a retail space operated by the hotel, with a separate entrance and sidewalk seating on L Street. It will likely be a restaurant, cafe, or bar.
JES says: (4/3/13 9:48 AM)
@David, you mean facing N? The L hotel on N street... not gonna be confusing at all ;)
JD says: (4/3/13 9:59 AM)
The power of suggestion! Thanks for the clarification, David--I didn't catch that in the zoning filings.
vahoya says: (4/3/13 11:02 AM)
Navy Yard is about 1 billion times better than all other options out there (Capitol Riverfront, Near Southeast, blah blah blah)as a name for our neighborhood..
I don't get the resistence, JD. It's the most defining identifier for the area with the most history. Seriously.
JD says: (4/3/13 11:09 AM)
My problem with it in this case is completely specific to the wording: "specifically the Navy Yard." No, it's not in *the* Navy Yard. Period. End of sentence.
vahoya says: (4/3/13 12:44 PM)
Oh come on!! You can be in Dupont Circle without being IN Dupont Circle... Same difference.
JD says: (4/3/13 12:52 PM)
Does the actual Dupont Circle have thousands of employees, numerous buildings, and its own retail outlets? Is it completely out of the realm of possibility that a hotel that might be for naval employees or contractors could be built within the walls of the Navy Yard? (compared to being built within the actual Dupont Circle)
And so the city's oldest operating installation just becomes an afterthought when people say "Navy Yard"?
Say "AT Navy Yard". Say "in the Navy Yard District."
I know it's a lost cause, but is it so hard to be a bit precise? If something isn't in THE Navy Yard, don't say it's in THE Navy Yard.
As I've said before -- try going to the Navy Yard Bank of America, or the Navy Yard Dunkin Donuts, and tell them you live in the Navy Yard, and see how far that goes.
Packinblackandred says: (4/3/13 1:19 PM)
@JD I've always wanted to get kicked out of somewhere!
Packinblackandred says: (4/3/13 1:21 PM)
In all seriousness, it is mildly annoying. You have to go out of your way to add "the" to Navy Yard! Be lazy, omit articles!
MJM says: (4/3/13 1:25 PM)
But this is gonna displace the Rockland BBQ foodtruck and picnic tables! JDLand Office Pool - when will construction start: With a late 2015 delivery, 18 months to build once the hole is dug, looking at a post baseball start later this year (Nov/Dec)?
JD says: (4/3/13 1:54 PM)
OT, but I'm not sure how much people go back and check previous comment threads (I had posted this in another one):
On the Park Tavern and Xavier Cervera in general, there's now an answer to the question that's been around for a while:
"Last night Xavier Cervera confirmed that he has closed a deal to sell all nine of his Capitol Hill area restaurants to a Boston equity firm experienced in the restaurant business and seeking to enter the Washington market. ...
"The equity group that bought out Cervera is reportedly headed by his brother and has other restaurant franchises. Xavier’s brother is currently in Washington and is actively managing the restaurant group. Part of the deal was Xavier’s continued involvement in the management as a consultant. According to regulars of some of the restaurants, the new owners have made some personnel changes involving long time employees which Xavier is not happy about. "
link
MJM says: (4/3/13 2:33 PM)
If Xavier is not happy then he should not have sold
Eric says: (4/3/13 5:18 PM)
I agree you shouldn't say "in the Navy Yard". "At Navy Yard" works just fine. I also think Capitol Riverfront BID should give up the hopeless dream and rename themselves to NYD or NYN BID (Navy Yard District/Neighborhood). link
JD says: (4/3/13 5:24 PM)
@MJM, it's quite possible he was overextended and didn't have much choice but to sell.
VelocityChris says: (4/3/13 7:40 PM)
I posted this in another thread and no more comments came after so I don't know if it was not seen or no one cared (if no one responds this time I'll let it go but i thought this was interesting). I read the historical signs at Canal Park and one said in the context of the working class houses in the mid '1800s built at the canal opening on the Anacostia: "While Washington, DC expanded and modernized, this area, known as the Navy Yard section, saw little change. Small businesses and row houses gave the look of an aging small town." Sounds to me like Navy Yard is at least one of the original names for the neighborhood. Am I reading that wrong or does anyone know a different story? If that name is the historical name does that change anyone's mind?
JD says: (4/3/13 7:47 PM)
I like "Navy Yard Section." Kind of different. All I am saying is, don't call the neighborhood just "Navy Yard." Navy Yard Section or Navy Yard District or "at Navy Yard" gets rid of the god-awful "in Navy Yard" formulation and references that this is the neighborhood around the Navy Yard. And also might help eradicate the incorrect "in the Navy Yard" references.
Eric says: (4/3/13 7:50 PM)
Well, we can all agree Capitol Riverfront BID is great, but they need a name change. It's so generic and I've lost count of how many people get "waterfront" (SW) mixed up with "capitol riverfront".
vahoya says: (4/3/13 10:38 PM)
You're standing on semantics. This neighborhood will join the countless ranks of other neighborhoods who's names are set by their most defining destination. Hell - we have one to the north. I can go to Capitol Hill without going ON to the actual Capitol Hill. In, By, Near... Use whatever preposition works for you, but if you want to tell people where you live, Saying "________ Navy Yard" is the best way to let them know... All the other names are just plain stupid. Near Southeast is vague and stuffy... And nobody likes Capitol Riverfront. The BID is awesome, but the name clearly was picked by committee in a board room. Face it JD. It's Inevitable... link
Shogungts says: (4/4/13 3:00 PM)
'Near Southeast' never made any sense to me; it reads as if the neighborhood is close to SE, not actually in it.
Westnorth says: (4/4/13 8:10 PM)
In other news, it appears that most of PM's hotels are of various Hilton flags: 9 Hilton, 4 Starwood, 2 Choice, 1 Marriott. 165 rooms is a little on the small size for a full-service hotel, 550 sq. ft. per key is too small for an all-suite brand, and Starwood's aloft is just down the street at the Wharf, so I'll place my bets on Hampton or Hilton Garden. And sure enough, the updated drawings show a "Pantry" on the ground floor, a feature in both HI and HGI. That said, I'm a little suspicious that the dining area facing N St. doesn't seem to have a kitchen attached, so it could just end up being a place for the free breakfasting to happen. Also, the corridors will wrap around the inside of the L so that any future construction on the corner won't block any room windows. That means half the rooms will face a light shaft at the interior of the block!
Westnorth says: (4/4/13 8:13 PM)
And "Near X Side" is a common usage in the midwest, where it denotes the part of the X side nearest to downtown.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|