Since January, 2003
            
 (a random before-and-after moment)
November 17, 2004
July 31, 2011
3rd at I, Looking South-Southeast (see more)

If you're wondering how come I haven't posted that much lately, it's because a few months ago I decided I was only going to post about "big news", and there's been a bit of a lull in that department. But I still do pass stuff along on Twitter, which you can see in the Twitter box here on the JDLand home page and which also mostly gets cc'ed to the JDLand Facebook page. That's where you can keep up all sorts of little things about the neighborhood that aren't really blog-post-worthy.
I think there will be some posts coming before too long--a few things seem to percolating around that may draw me out soon, plus there's that ramp from the outbound 11th Street freeway bridges to northbound DC-295 should be coming before too long (UPDATE, five hours later: yes, indeedy). There's not always a lot of news in December, anyway. And not a lot of stuff to take updated photos of right now.
Just didn't want people to think I'd completely closed up shop.
But, if there's anything that I'm being too lazy to post about that folks want to discuss, have at it in the comments. (Suggested topics for discussion: the Navy Yard keeping their portion of the RIverwalk closed because they haven't yet fixed the security issues with the turnstiles into their campus, and Xavier Cervera perhaps selling off his restaurant empire, including the not-yet-opened Park Tavern at Canal Park and Willie's Brew and 'Que at the Boilermaker Shops.)
Comments (5)
   
 
 More About JDLand stuff
 All posts: JDLand stuff

JDLand.com Home

Comments

ZoolanderANDtheBoYz says: (12/17/12 1:01 PM)
According to the Velocity management, toll brothers will start construction this spring on the north side of velocity lot. It is probably going to take them a year and half to complete. I am pretty sure it will be completed before Twelve12 and Park Chelsea.


B in DC says: (12/17/12 2:16 PM)
Zoolander, this is going to be condos, I assume? Or did you hear?

Also, DCHA will start breaking ground this March on the apartments across from the Marine Barracks on L St between 6th and 7th.


ZoolanderANDtheBoYz says: (12/17/12 2:26 PM)
Nope, I don't think so. No one is going to build 200+ condo building these days. It is just really hard to sell that size condo building (unless all of them are one bedroom and studio units). All the condos that are being built in the city are under 50 units. Right now, it is an apartment market and we probably won't see large size condo for the next several years. The Velocity condo has 200 units and they started selling three years ago and they still have between 20 to 25 unsold units left (mostly two bedrooms).


The Hoff says: (12/17/12 5:32 PM)
The sales office at Velocity spoke of that lot becoming a hotel at some point. This was 3 years ago so who know's at this point.


JD says: (12/17/12 5:44 PM)
Hoff, the remaining two lots on the Velocity block have been purchased this year by Toll Brothers, which only does residential, so the question at this point is only whether the new building will be apartments or condos. When I broke the news of the first lot being purchased link there was no information one way or the other.

And if they do start in 2013, they can finish faster than other projects because they don't have to dig the garage and substructure, which Cohen completed back when Velocity was built.

@B, the Square 882 possible start was what I was alluding to as "percolating" in my above post, but until there's an official announcement, and/or a building permit, I wouldn't write any dates on my calendar. Ditto for Toll. :)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  

202_cyclist on Columnist Walks the: Bring on the Cuba! Also, our condolences are with the family and teammates of J...
conngs0 on Columnist Walks the: I think the overall point is that there are different ways to skin a cat (Sorry,...
202_cyclist on Wednesday Tidbits: As the kiddos say, does anyone have any deets about the new urban vegetable gard...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
16 B/O M ST SE   ROBBERY  09/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/19/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/18/16
1200 B/O 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  09/17/16
400 B/O M ST SE   THEFT
Shoplifting
 09/16/16
1100 B/O 5TH ST SE   THEFT
Theft First Degree (all Other Larceny)
 09/06/16
700 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/06/16
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/04/16
UNIT B/O I ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 09/04/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/28/16

Recent Issued Building Permits Archive  
1233 1ST ST SE   
09/16/16 
NA BALLPARK HOTEL LLC / NORTHEAST ELECTRIC; NA BALLPARK HOTEL LLC; HOSSEIN ECONO SIGN INC.
SG1600390 / CONSTRUCTION
To Install four signs: -3 - Channel letters on Raceways -1- Blade Sign
1331 2ND ST SE   
09/19/16 
DC WATER / DC WATER; CORMAN CONSTRUCTION
AH1601056 / CONSTRUCTION
After hour work for structure excavation and support for building permit B1311474 DC Water, Corman Construction 202-863-0052
933 5TH ST SE   
09/12/16 
null / NA NA NA
EHOP16924112 / HOME OCCUPATION
1015 HALF ST SE   
09/14/16 
HALF STREET SE LLC HALF STREET SE LLC / DARIN PASQUALLE; HALF STREET SE LLC HALF STREET SE LLC; DARIN PASQUALLE
E24765056 / SUPPLEMENTAL
   
09/21/16 
HALF STREET SE LLC / 1015 HALF SE LLC; JOHN GIUSEPPE-RAMCO
B1610675 / CONSTRUCTION
Construction of elevator lobby and common corridors on the 7th floor as shown on the electronically submitted mechanical, electrical, fire protection, and arch. dwgs. Interior work only. No structural work involved. approx. 2275 sf.
1210 HALF ST SE   
09/07/16 
HINES GLOBAL REIT 55 M STREET LLC / MATT LOSIGNOR
P1609218 / SUPPLEMENTAL
75 I ST SE   
09/07/16 
99 I ST SE LP / 99 I ST SE LP; ECS MID-ATLANTIC, LLC C/O REBECCA RUSCHMAN
SB1600354 / CONSTRUCTION
We will perform 2 soil borings and 2 CPT cone soundings on the site. The 2 soil borings and 2 CPT soundings will be extended to depths on the order of 90 ft below the existing site grades. The borings and soundings will be perfroemd within the bounds of private property and will be drilled utilizing a 3.25-inch hollow stem, continuous flight augers and generate a 6-inch annulus. After the borings...
82 I ST SE   
09/09/16 
GDVC EYE STREET LLC / MITCH A. PERMUY
E1609957 / SUPPLEMENTAL
88 K ST SE   
09/07/16 
99 I ST SE LP 99 I ST SE LP / 99 I ST SE LP 99 I ST SE LP; ECS MID-ATLANTIC, LLC C/O REBECCA RUSCHMAN
SB1600355 / CONSTRUCTION
We will perform 2 CPT cone soundings on the project site within the bounds of private space. The CPT cones will be extende to a depth of 90 feet below the existing ground surface, utilizing a 4-inch diameter cone and generate a 4-inch annulus. After the soundings are completed they will be backfilled with bentonite slurry which has a consistency of two pounds bentonite powder to one gallon water.
80 M ST SE 400   
09/15/16 
WELLS REIT II 80 M STREET LLC / null
P1609454 / SUPPLEMENTAL
50 M ST SE   
09/15/16 
KCG 50 M LLC / KCG 50 M LLC ENGLEWOOD LLC; TRACIE CLAXTON; CLAXTON
SG1600460 / CONSTRUCTION
2 Wall mounted Signs - Reversed Channel Letter 2 small wall mounted plague
80 M ST SE   
09/09/16 
WELLS REIT II 80 M STREET LLC / PHILIP G DONNELLY
E1609959 / SUPPLEMENTAL
99 M ST SE   
09/16/16 
BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVELOPMENT / BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVEL
AH1601047 / CONSTRUCTION
Place concrete mat foundation slab. Before work hours - 3AM to 7AM on 9 / 19 / 2016 and 9 / 20 / 2016, if weather or jobsite delays prevail. Permit will only be needed / used for 1 of the 2 days. (Per ANC agreement "before hours work on ONE of the following days: either September 17, 19, or 20," & "to begin no earlier than 3:00 am" )
   
09/16/16 
BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVELOPMENT / BALLPARK SQUARE 701, LLC SKANSKA COMMERCIAL DEVEL
AH1601048 / CONSTRUCTION
Place concrete at 99 M Street SE for mat foundation slab. Saturday 9 / 17 / 2016 concrete placement from 3AM to 7PM. (Per ANC agreement "before hours work on ONE of the following days: either September 17, 19, or 20," & "to begin no earlier than 3:00 am" )
100 M ST SE 4   
09/09/16 
SQUARE 743 INC / null
P1609322 / SUPPLEMENTAL
100 M ST SE   
09/20/16 
QUARE 743 INC / QUARE 743 INC; QUARE 743 INC; PHILIP HAUHN
E14003252 / SUPPLEMENTAL
202 M ST SE   
09/09/16 
UNITED STATES OF AMERICA / EBONY BROWN DC HUMANITIES AND ARTS COMMISSION
TN1600199 / CONSTRUCTION
SPECIAL EVENT 202 ARTS & MUSIC FESTIVAL 1 SL 250 24 X 32 STAGE
1100 NEW JERSEY AVE SE 845   
09/21/16 
SQUARE 742 LLC SPAULDING & SLYE C/O WC SMITH / SQUARE 742 LLC SPAULDING & SLYE C/O WC SMITH; WILLIAM SNODDY
B1612012 / CONSTRUCTION
Interior Renovation on the 8th Floor on behalf of Maxim Health 5,138 sqft
1100 NEW JERSEY AVE SE   
09/14/16 
SPAULDING AND SLYE SPAULDING AND SLYE / HALEY HUGGINS; SPAULDING AND SLYE SPAULDING AND SLYE; JOHNNY RILING
E39166644 / SUPPLEMENTAL
125 O ST SE   
09/19/16 
DISTRICT OF COLUMBIA / DC WATER HQ; DAVID FONTANA MSC
EX1600110 / CONSTRUCTION
Site grading and demo per erosion control plan only for future new DC Water HQ building under seperate permit.
1244 SOUTH CAPITOL ST SE   
09/19/16 
1244 SOUTH CAPITOL RESIDENTIAL LLC / RONALD C. CAYTON
E1610018 / SUPPLEMENTAL
385 WATER ST SE   
09/15/16 
FC 385 WATER LLC / EDUARDO L. LOPEZ
E1610139 / SUPPLEMENTAL
355 WATER ST SE   
09/14/16 
OLIVIA DARROW RAGNAR EVENTS LLC
TN1600198 / CONSTRUCTION
SPECIAL EVENT RAGNAR RELMAY WASHINGTON DC 2 20 X 20 TENTS 25 10 X 10 TENTS 1 30 X 40 TENT FENCING FOR BEER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.