Since January, 2003

Ad by Google
 (a random before-and-after moment)
April 14, 2006
April 8, 2012
3rd Place at K, Looking Southeast (see more)

I've been to a fair number of ribbon cuttings over the past decade, and I have to say that Friday's opening of Canal Park seemed to be infused with a level of excitement and joy that I don't think I've seen at any of the others.
While getting Nationals Park open in 2008 was a triumph of speed and scale, the 13-year journey of the three-block park at the heart of Near Southeast required so many hands and so much patience and resulted in a space with which the stakeholders are clearly thrilled that it shouldn't really be a surprise that on a gorgeously crisp late fall day so many attendees were walking around with what Tommy Wells described as "a huge smile on their face."
The speakers standing at a podium in the center block's small pavilion ran through the list of names and agencies that brought the park to fruition, starting with developer William C. Smith, whose CEO Chris Smith started the long drive to build the park, creating the Canal Park Development Association back in 2000. Then there was money from the federal government and the DC government, additional dollars and much support from the DC Housing Authority, work by OLIN landscape architects and STUDIOS architecture to design the park with innovative sustainable development and storm water management components (and a skating rink!). Props were given for the hiring of Housing Authority residents for 15 of the park's 25 part-time jobs.The Capitol Riverfront BID and the DC Commission on the Arts and Humanities also took bows for their parts in the park's creation (and future).
After the speeches, the festivities moved to the skating rink, where the ribbon was cut and Mayor Gray drove the Zamboni, and then the public laced up its skates and got out on the ice. And they kept skating, well into the night. (And I have no doubt there will be big crowds at the rink and park today as well.) For all the happiness seen in the park's founders about getting it finally opened, I saw equal measures of surprise and cheer that so many residents and neighborhood office workers had come to the opening, had stayed through the long speechifying, and now were skating and strolling.
I've joked that I sure have been saying the word "finally" a lot lately--the trash transfer station is finally demolished, Kruba Thai is finally open, Gordon Biersch finally admitted they're coming to 100 M, Vida Fitness is finally announced, Capitol Quarter is finally finished.... But it's the "finally" of Canal Park opening that hit me more than I expected, perhaps similarly to all those happy stakeholders.
I took a lot of photos of fenced-off schoolbuses in the early years, posted a lot of renderings (some for the park's first design that never materialized), and bugged a lot of people to find out the latest. It was, after all, one of the few projects that was already in planning when I started tracking Near Southeast in early 2003, along with the Capper redevelopment and Capitol Hill Tower.
And now the park is open (with the Park Tavern restaurant to follow "within a few weeks"), and everybody can enjoy it. Finally!
Hope you'll check out my photo galleries of the park, yesterday's ceremonies, and the park's opening night, along with my expanded gallery of before-and-afters from around the park (with some that I still need to fill in, oops). And you can also see coverage from the Post, NBC4, and WJLA. And the lineup of today's events and other details on the park's official web site. And tell us what you think of the park.
Comments (5)
 
 More Recent News
 All posts: Canal Park, Events, photos

JDLand.com Home

Comments

SBS says: (11/17/12 11:50 PM)
JD: These photos are such a wonderful landmark. Thank you for taking us all along with you on this journey. The park is gorgeous and really capture the vision of the future you feel in so many ways around DC. I may have to learn to skate!


Jaybird says: (11/18/12 8:54 AM)
JD,

Your night photo of the rink with the Capitol in the background is priceless!



Jaybird says: (11/18/12 8:58 AM)
And some remind of the Rockefeller Center.


MalS says: (11/19/12 5:13 PM)
Great work, JD - I was at the park Friday and it is a very exciting step for the area. The park is very beautiful and will only get more so as plantings mature. What a time for near Southeast! As always, thank you for the remarkable documenting that you achieve.


JeffreyGordon says: (11/19/12 11:46 PM)
JD, thanks for the update as usual! I am planning on being in town after the first of the year and really look forward to seeing all the progress since I was last there in july of 2010. I really appreciate any/all updates from you.

jg

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Westnorth on Navy Yard Circulator: People generally don't ride bus routes from one end to the other end. In the cas...
E. Masquinongy on Southeast Blvd.: All three plans show the rehabilitation of Barney Circle, reconnecting it to L S...
202_cyclist on Southeast Blvd.: I support Concepts A and B because DC desperately needs more housing. Additiona...
JD on Southeast Blvd.: I said this on Twitter a little while ago--I wouldn't be surprised if this has a...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
700 B/O L ST SE   THEFT
2nd Degree
 12/17/14
1200 B/O 1ST ST SE   THEFT
Theft F/Building
 12/08/14
1200 B/O 1ST ST SE   THEFT
 11/21/14
900 B/O 5TH ST SE   BURGLARY
 11/21/14
200 B/O I ST SE   THEFT
 11/21/14
1200 B/O NEW JERSEY AVE SE   THEFT
 11/20/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
12/03/14 
NA NA NA
EHOP1590134 / HOME OCCUPATION
   
12/10/14 
KAREN NZAKIMUENA
PC74349112 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1016 3RD ST SE   
12/15/14 
ANAMARIA R MOTTOLA / DIXON
B1502438 / CONSTRUCTION
RENOVATIONS MINOR MEP
1212 4TH ST SE   
12/10/14 
FC 1212 LLC / SCHINDLER ELEVATOR CORP
ER1500593 / SHOP DRAWING
REPLACE MAXTON UC2A VALVE EST. COST OF WORK $ 2 2120. 00
927 5TH ST SE   
12/15/14 
AARON LORENZO
PC25919394 / POST CARD
REPLACEMENT IN KIND OF EXISTING FENCE ON PRIVATE PROPERTY. REPLACEMENT IN KIND WHEN APPLIED TO ARCHITECTURAL FEATURES MEANS REPLACEMENT WITH A FEATURE OF LIKE MATERIAL THAT REPLICATES THE EXISTING FEATURE IN PROPORTION APPEARANCE TEXTURE DESIGN DETAIL AND DIMENSIONS.
1000 5TH ST SE   
12/04/14 
UNITED STATES OF AMERICA / WALTER T JONES
E1501598 / SUPPLEMENTAL
1015 HALF ST SE   
12/10/14 
HALF STREET LLC / ART DISPLAY; BOB BIROONAK ART DISPLAY CO.
SG1400465 / CONSTRUCTION
ONE ILLUMINATED NEWS TICKER SIGN
1201 HALF ST SE   
12/10/14 
WEST HALF 1 LLC / MARK W GIBSON
E1501746 / SUPPLEMENTAL
   
12/12/14 
JASON YORK
TN1500036 / CONSTRUCTION
INSTALLING SMALL TENT ON DEC 29 2014 FOR THE BRIDGESTONE WINTER CLASSIC ON 1-1-15 WITH GENERATOR TENTS REMOVED ON 1-2-15
808 L ST SE   
12/10/14 
NAVY YARD ASSOCIATES LLC / KE-MAURELLE PREDDIE
B1412006 / CONSTRUCTION
NEW OFFICE USE FOR 1254 SQ. FT. EXISTING TWO STORIES PLUS BASEMENT STRUCTURE ON SE / C-3-A ZONING DISTRICT. MECHANICAL ELECTRICAL AND PLUMBING REMAIN AS IS.
80 M ST SE   
12/10/14 
WELLS REIT II 80 M STREET LLC / ANTHONY G SAMBURG
E1501724 / SUPPLEMENTAL
14 M ST SE   
12/16/14 
ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON / PHILLIP B. MOBLEY
FB1500047 / SUPPLEMENTAL
20 M ST SE   
12/04/14 
TRANSWESTERN JEFFREY GROSS / OLLIE READ; TRANSWESTERN JEFFREY GROSS; CHRISTOPHER SCHULZE
AR66514546 / SUPPLEMENTAL
   
12/04/14 
TRANSWESTERN JEFFERY W GROSS / ANDREW ARNTSON; TRANSWESTERN JEFFERY W GROSS; ANDREW ARNTSON
P96600069 / SUPPLEMENTAL
80 M ST SE   
12/03/14 
MARY JACKSON
PC44081129 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
12/05/14 
WELLS REIT II 80 M STREET LLC /
P1501746 / SUPPLEMENTAL
100 M ST SE   
12/03/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1502037 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. SUBDIVIDE TENANT SPACE AND ADD PANTRY. PARTITIONS MEP AND LIFE SAFETY. NORTHWOOD INVESTORS LLC
202 M ST SE   
12/10/14 
DISTRICT OF COLUMBIA / WOODY WICKLIFFE
TN1500035 / CONSTRUCTION
INSTALL 50FT X 100FT TENT NO GENERATORS NO COOKING NO SMOKING NO STAGES 10FT X 70FT TENT INSTALLED DEC 11-15 2014 EVENTS DEC 12-14 2014 12:01PM - 9:00 PM
1201 M ST SE   
12/11/14 
CARLTON RAY
AH1500149 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
75 N ST SE   
12/11/14 
CRANE SERVICE CO / CHRISTINE LONG
AH1500150 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 2:00AM THRU 11:00PM
800 NEW JERSEY AVE SE   
12/08/14 
SQUARE 737 LLC / GLENNWOOD ROGERS
P1501673 / SUPPLEMENTAL
25 POTOMAC AVE SE   
12/02/14 
RIVERFRONT HOLDINGS I LLC C/O ECC INC. / ECC INC.
UT1500007 / CONSTRUCTION
REMOVAL OF ONE 100-GALLON UNDERGROUND STORAGE TANK DURING MASS EXCAVATION ACTIVITIES FOR SITE REDEVELOPMENT.
   
12/03/14 
RIVERFRONT HOLDINGS I LLC / WOODY WICKLIFFE
TN1500032 / CONSTRUCTION
INSTALL 40FT X 80FT TENT NO COOKING NO SMOKING NO PROPANE NO LIGHTING 40FT X 40FT TENT 2 GENERATORS 25KW EACH 20FT X 20FT TENT 8FT X 20FT PLATFORM 40FT X 40FT PLATFORM 20FT X 20FT PLATFORM INSTALLED DEC 8 -9 2014 EVENT DEC 9 2014 9AM - 4PM
   
12/05/14 
FLORIDA ROCK PROPERTIES INC / ROBERT S. WATTS
E1501658 / SUPPLEMENTAL
   
12/05/14 
RIVERFRONT INVESTMENT PARTNERS / JASON BENTLEY
B1408697 / CONSTRUCTION
CONSTRUCTION OF NEW 9 STORY BUILDING. THIRD PARTY REVIEW
300 TINGEY ST SE   
12/15/14 
FC BOILERMAKER LLC / GREGORY BIRCKHEAD; FC BOILERMAKER LLC; MICHAEL BELL
E55526822 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.