Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
September 16, 2007
April 3, 2012
Half at M, Looking Southwest (see more)

The 11th Street Bridges folks were nice enough to pass along a more recent drawing (March 2012, Concept Only! Not for Construction!) that shows the 11th Street Bridges' project Phase 2 plans.
They were also nice enough to pass along a very large version of this more recent drawing, enabling me to post a very large image in on the new ramps and lanes along and over 11th Street on the west side of the Anacostia River, and how the new Southeast Boulevard with a new signalized intersection at 11th Street will be built along what used to be the eastern end of the Southeast Freeway. It also shows the extension of 12th Street north of M to the new boulevard, along with all of the turn lanes and other movements. (All of this assuming the designs don't change.)
It's also handy if you haven't committed all the Phase 1 ramps and flyovers and lanes and paths to memory--they are shown in yellow and orange, while the Phase 2 plans are in blue and pink, and decommissioned roads and ramps are in a subtle x'ed-out motif. So, for the heck of it, here's a not-quite-so-enlarged image showing the entire project, on both sides of the river. Also, if you missed it, my photo gallery of the project's current state, from earlier this month.
(I should note that this map doesn't include how upcoming changes to Barney Circle might look, because that's still under deliberation.)
Comments (3)
 
 More About 11th Street Bridges

JDLand.com Home

Comments

straightoutof03 says: (9/28/12 9:20 AM)
JD - Do you know when there are going to be public opportunities for comment on the plans for Barney Circle? I know the EA starts this fall but not sure about how long those typically take for a project like this.


JD says: (9/28/12 9:25 AM)
I haven't heard anything about the process or the timeline beyond that "EA this fall" that's on the AWI web site. Hopefully some info will be coming soon....


Gamble Rogers says: (9/28/12 2:49 PM)
Thanks for uploading the huge image, JD! You rock as always.

As residents living alongside Virginia Avenue park, this project will bring long-term benefits from the new 11th Street SE Freeway entrance, reductions in road noise by knocking down the old outbound flyover, and the easy access to the new I-295 northbound ramp.

It also brings the short-term benefit of running off the heroin addicts who shoot up in the park. Heroin and backhoes don't mix!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
conngs0 on A Week of: For what it's worth, DCity Smokehouse is the best bbq I've had in the city. I...
conngs0 on A Week of: I don't think it's reasonable to expect something the caliber of a place like 12...
202_cyclist on A Week of: King Ribs was absolutely the best barbecue in the area but, unfortunately, it wa...
JD on A Week of: "Late November" now the latest on 100 Montaditos. (Forgot to include them in my ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT /  10/12/14
200 B/O I ST SE   THEFT /  10/08/14
70 B/O I ST SE   THEFT F/AUTO /  10/08/14
800 B/O L ST SE   BURGLARY /  10/07/14
9TH ST SE AND POTOMAC AVE SE   THEFT F/AUTO /  10/03/14
100 B/O K ST SE   THEFT F/AUTO /  10/03/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1019 4TH ST SE   
10/14/14 
JOHN SHORT
F1500026 / CONSTRUCTION
WE WILL INSTALL AN ORNAMENTAL IRON FENCE IN THE FRONT YARD WITH A GATE. THE FENCE IS 3 FEET HIGH AND THE FENCE WILL BE BLACK IRON. FENCE IS ENTIRELY ON PUBLIC SPACE.
1212 4TH ST SE   
10/16/14 
FC 1212 LLC / PAUL R. JABLONSKI
E1500411 / SUPPLEMENTAL
   
10/16/14 
FC 1212 LLC / ARK SIGN SERVICES INC.; NONE
SG1500034 / CONSTRUCTION
INSTALL ONE WALL MOUNTED ILLUMINATED SIGN.
41 L ST SE   
10/24/14 
BILL CUMMINGS POC FOR WMATA MRP REALTY/CAS RIEGLER / EOIN DURCAN POC FOR SCHNABEL ENGINEERING
SB1400457 / CONSTRUCTION
TEMPORARY GEOTECHNICAL SOIL BORINGS NUMBER OF BORINGS: 3 DEPTH OF BORINGS: 60 FT DRILLING METHOD: 3.25 INCH HOLLOW STEM AUGER HOLE DIAMETER: 5 INCHES WELL ABANDONMENT PROCEDURE: TREMIE GROUTING WITH BENTONITE GROUT
20 M ST SE   
10/17/14 
SOUTHEAST REALTY LLC / DAMON ELLIS; .
SG1400457 / CONSTRUCTION
INSTALLATION OF NEW NON ELECTRIC SIGN 10FT L 1FT 8IN H 3IN W
100 M ST SE   
10/15/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
   
10/17/14 
WASHINGTON D.C. / GARY MCVEY; WASHINGTON D.C.; GARY MCVEY
E50257566 / SUPPLEMENTAL
901 M ST SE   
10/16/14 
CARLTON RAY
AH1500035 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
10/14/14 
COMCAST CABLE / MICHAEL SONESEN
AH1500018 / CONSTRUCTION
PLACING INNERDUCT IN EXISTING VERIZON MANHOLES. OCTOBER 9 2014 ? NOVEMBER 9. 2014. 7PM ? 2AM WEEKNIGHTS ? SATURDAYS
   
10/16/14 
CARLTON RAY
AH1500034 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1000 NEW JERSEY AVE SE   
10/14/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1500331 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/16/14 
GALLERY CAPITOL RIVERFRONT / THOMAS P MCGUIRE
E1500402 / SUPPLEMENTAL
300 TINGEY ST SE   
10/15/14 
FC BOILERMAKER LLC / BIRKHEAD ELECTRIC INC.; ERIN ANCHOR SIGN INC
SG1500023 / CONSTRUCTION
2-COMMERCIAL SIGN INSTALLATION
301 WATER ST SE   
10/23/14 
FOREST CITY
B1408021 / CONSTRUCTION
REVISION TO B1305741 EXTERIOR SEATING LOAD FROM 188 TO 345 EXTERIOR SEATING CONSIDER AS SUMMER GARDEN ON PRIVATE PROPERTY PER GSA / DC GOV EASMENT.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
N ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
0025 POTOMAC AV   08/08/14
$ 78,486,500
RIVERFRONT HOLDINGS I LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.