On Monday night, the Zoning Commission voted 4-0-1 to approve DCHA's request for a second two-year time extension on the PUD deadlines to build the Capper Community Center on the now-empty lot on 5th Street SE between K and L. With this vote, building permits would need to be filed by July 1, 2014, with construction needing to be underway by July 1, 2015, provided another extension isn't someday requested and granted.
The extension received votes of support from both ANC 6B and ANC 6D, and a letter from a steering committee of Capper public housing residents also expressed support. Commissioner Peter May, referencing the "contentious" discussions in the past regarding this project and his own unhappiness about seeing it delayed, said it was "reassuring to know that key members of the community are supportive," otherwise he would be "similiarly unhappy." But he did vote in favor of the extension, as did Chairman Anthony Hood and commissioners Marcie Cohen and Michael Turnbull. (The commission's fifth seat is currently empty, with vice chair Konrad Schlater's recent decampment for a new job in Chicago.)
Included the paperwork provided to the Zoning Commission is a letter from DC Housing Authority executive director Adrianne Todman detailing the various high-finance moves over the past few years that have helped the overall Capper redevelopment move forward but that haven't trickled down to fund the community center. The letter says that the Housing Authority anticipates a $55 million bond issuance within the next year that will pay off the previous $29 million Bond Anticipation Notes and provide enough proceeds to continue the infrastructure work around Capper "and to construct the community center, which we estimate will cost $7.6 million." These moves require legislation, so we'll be able to cast an eye toward the DC council this fall to see if things are progressing as anticipated.
Also in that letter is this tidbit: "Lastly, DCHA is working with and soliciting a potential anchor tenant that will operate the community center and also contribute funding for the construction of the community center." Very interesting....
If you want to know still more about the history of plans for a new community center on this site (the old one was demolished in 2007), I point you to this pile of posts.
Comments (10)
   
 
 More About Capper

JDLand.com Home

Comments

MJM says: (7/12/12 12:25 PM)
More excuses but they sure can kick the can down the road


Sophia Monster says: (7/12/12 5:12 PM)
Happy to have them kick the can... just curious what type of anchor tenant is an appropriate fit for this location. A crossfit gym? A McDonalds? A dry cleaner? I can't picture it.


Carey says: (7/12/12 5:14 PM)
Could they be thinking Marines?


Eric says: (7/12/12 9:15 PM)
Why are you happy to have them kick the can? What's the significance of this place?


conngs0 says: (7/13/12 11:21 AM)
I suppose one good reason for the delay is that by allowing the neighborhood to grow up a bit more before beginning work on the Community Center, the planners will have a better idea of how to orient the building to best suit the needs of the neighborhood with less redundancy.

For instance, if a gym is constructed in the Twelve12 building, then perhaps there will be less of a need for one in the Community Center (or at least not as big of a gym). In that case, perhaps the Community Center could be equipped with a basketball court and other athletic facilities.

I'm also a little confused about what type of "anchor tenant" that would be approached to run the Community Center. Part of my confusion stems from a lack of understanding regarding the operation of community centers in general, but it doesn't seem conducive to a purely commercial enterprise.


Sophia Monster says: (7/13/12 12:47 PM)
I guess I don't think it's that bad to have the lot remain empty while appropriate plans are scoped out along the lines of conngs0's comment above. The programming of the community center will determine its space needs. I also really think it makes sense for that programming to serve what will happen at Van Ness... which as of now is a bit of a mystery.


JD says: (7/13/12 1:20 PM)
One thing to remember on the Community Center (and why for years it caused a lot of very contentious discussions) is that originally it was envisioned as a big amenity for the public housing residents, ensuring that they didn't lose access to a community center they had before Hope VI and also giving them something newer with better offerings in return for dealing with the dislocation of the closing of the Cappers.

In other words, a gym at Twelve12 is probably not going to help the public housing residents much at Capitol Quarter. There are needs designed into the CC for the subsidized members of the community that other people now moving into the neighborhood can get on their own. (Computer access, for one.) And a place for kids to hang out, instead of, as the cliche goes, "on the street."

But it's also now a very different "community" communicating its wants and desires to the Zoning Commission than during the CC's previous appearances. Might be good to make sure that the people for whom the center was originally envisioned don't lose their voice.



Sophia Monster says: (7/13/12 1:32 PM)
Interesting context, JD. And presumably some of the children "on the street" might also be Van Ness students.


Sophia Monster says: (7/13/12 1:32 PM)
(some day)


JD says: (7/17/12 10:48 PM)
Sorry for the silence all of a sudden--no big news to report (it is summer, after all), but I'm also having a bit of a post-surgery setback. Nothing serious, but have been resting instead of fulfilling my fiduciary duty here. Might be a few more days of that.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

Alex B. on Transportation Study Meeting: That rendering of Walters seems a bit misleading, as it would imply a two story ...
caphillguy on Transportation Study Meeting: For everyone's information: the intersection at Virginia Ave and 7th Street was ...
JD on Transportation Study Meeting: Some details on Walters Sports Bar, still planning on coming to the space below ...
202_cyclist on Transportation Study Meeting: Exciting news folks! It looks like there was soil testing today for the former ...
CJBabyDaddy on Transportation Study Meeting: @RMP & @jdc: Sign on the front door says: “We are waiting on some officia...
conngs0 on Transportation Study Meeting: JD, thanks for passing along the update on the Capper Seniors building. I suppo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/15/18
200 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/14/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/13/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/13/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/09/18
1100 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/08/18
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/06/18
UNIT B/O N ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/05/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/01/18
1200 B/O HALF ST SE   ROBBERY  11/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/18
700 B/O L ST SE   THEFT
Shoplifting
 11/26/18
1255 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/25/18
1200 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/23/18

Recent Issued Building Permits Archive  
1300 4TH ST SE 1ST FL   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902414 / SUPPLEMENTAL
1300 4TH ST SE   
12/11/18 
PARCEL O 1-LLC / N/A
B1900015 / CONSTRUCTION
Yards Parcel O1 - Revision to Base Building Permit B1609947 to incorporate minor design changes including converting a residential unit to a fitness center. TPR
1300 4TH ST SE B1   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902413 / SUPPLEMENTAL
1331 4TH ST SE CU   
12/10/18 
FC 1331 LLC / null
P1902045 / SUPPLEMENTAL
1300 4TH ST SE PENTHOUSE   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902412 / SUPPLEMENTAL
1300 4TH ST SE   
12/10/18 
PARCEL O-1 LLC / RICHARD V CAREY 301-424-8899
FB1900032 / SUPPLEMENTAL
(2) NEW INSTALL Gross 1,840,000 BTU / HR Natural Gas HW
1346 4TH ST SE   
12/07/18 
FC 1346 LLC / null
FB1900031 / SUPPLEMENTAL
1000 5TH ST SE   
12/11/18 
UNITED STATES OF AMERICA / null
E1902394 / SUPPLEMENTAL
   
12/11/18 
UNITED STATES OF AMERICA / BRANDON WILSON; BRANDON M WILSON
B1902777 / CONSTRUCTION
Kitchen Area: -Interior only Frame about 7lf around one column as per 2 / A030 -Add 260 SQF bulkhead as per 1 / A030 None Load bearing wall on first floor and second floor.. M,E,P, will be provided on another permit. IT Lounge -Add 194 SQF bulkhead as per 3 / A030
2 I ST SE   
12/10/18 
MCDONALDS CORPORATION / KIM MITCHELL
B1814290 / CONSTRUCTION
The submitted drawings are a revision to those approved under building permit #B1703907, and include the incorporation of a new corridor connection at the roof level between phase 1 and phase 2 buildings, and corresponding revisions. Revised Mechanical / Plumbing / Electrical drawings are included to reflect the change of Engineers of Record. Interior Design Drawings are also included. Various...
   
12/14/18 
CRESCENT CAPITAL VIEW, LLC / ERICKA CLARK
AH1900295 / CONSTRUCTION
Dismantle of tower crane. Minimal noise impact and required for reduction on impact to traffic.
250 M ST SE   
11/28/18 
SQUARE 769 LLC. / CONOR LAW
BCIV1800147 / CONSTRUCTION
New construction of erosion and sediment controls, domestic water service, fire service, sanitary sewer service, storm sewer service, curb & gutter, street trees, misc. landscaping, sidewalk, storm water management.
   
12/05/18 
null
E1902214 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 420   
11/27/18 
SQUARE 742 LLC / JAMES W LASHER
E1901850 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/18 
SQUARE 742 LLC / null
E1901715 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
P1901600 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
M1900652 / SUPPLEMENTAL
   
11/29/18 
SQUARE 742 LLC / JOE SAFFER
P1901753 / SUPPLEMENTAL
   
12/04/18 
SQUARE 742 LLC / PAUL WHITLEY
AN1900004 / CONSTRUCTION
This project consists on installing (9)proposed antennas , RRU's, and hybrid cables on an existing building, and removing (9) existing antennas, RRU's, TMA's, and hybrid cables.
   
12/05/18 
SQUARE 742 LLC / JOHN M. GIUSEPPE
B1900960 / CONSTRUCTION
renovations to 3rd floor office space SUITE 300 NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING as shown on the electronically submitted mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use. NO structural work involved. 7000 sf. **LEVEL 2 ALTERATION, DEMOLITION
125 O ST SE 2-6FL   
11/28/18 
DISTRICT OF COLUMBIA / ANDREW KLEIN 2408991526
E1901923 / SUPPLEMENTAL
125 O ST SE   
11/27/18 
DISTRICT OF COLUMBIA / MICHAEL P. LYONS
E1901853 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / WILLIAM H. JONES
E1901854 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / WESLEY R. DAVIS
E1901951 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / null
P1901748 / SUPPLEMENTAL
79 POTOMAC AVE SE   
11/27/18 
RIVERFRONT HOLDINGS LLC / null
AH1900270 / CONSTRUCTION
AFTER HOURS 7PM TO 7AM FINAL CONNECTION OF RELOCATED 8” SANITARY LINE
71 POTOMAC AVE SE   
11/26/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1804337 / CONSTRUCTION
New 264-Unit 13-Stories Apartment House
   
12/03/18 
RIVERFRONT PROPERTIES LLC / null
P1901813 / SUPPLEMENTAL
   
12/13/18 
RIVERFRONT HOLDINGS LL, LLC / PARKER HARRELL
SB1900071 / CONSTRUCTION
Abandoning 20 temporary wellpoints and 3 gravel packed wells originally installed for dewatering during construction.
79 POTOMAC AVE SE   
12/13/18 
RIVERFRONT HOLDINGS I LLC / null
E1902479 / SUPPLEMENTAL
227 TINGEY ST SE   
11/30/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900285 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 12 / 5 / 2018 to 1 / 5 / 2019.
300 TINGEY ST SE   
12/04/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1902120 / SUPPLEMENTAL
   
12/06/18 
FC BOILERMAKER LLC / GARY BRENT; N/A
SG1900027 / CONSTRUCTION
Install 1 illuminated edge-lit wall logo sign, 1 illuminated halo-lit letter sign, 1 double-sided push thru edge-lit blade sign - LULULEMON
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.