Since January, 2003
            
 (a random before-and-after moment)
March 3, 2011
September 6, 2015
7th at K, Looking South-Southeast (see more)

Because of a need to burn off some calories before digging into my "Reeseter's Bunny" (milk chocolate-coated peanut butter bunny, which the label says is four servings [ha!] at 180 calories per), I did my usual wanderings this morning to grab updated photos around, Capper, 200 I, Canal Park, and the Boilermaker Shops. Alas, I did not hide any Easter eggs in any of these shots, nor did I find any.
The framing and Tyvek-ing is underway on 3rd Street south of L, in the shadow of the 300 M Street office building, as Capitol Quarter continues its march toward completion. I also took a lot of photos of other CQ Phase II blocks, so spend some time in the Capitol Quarter Phase 2 Expanded Photo Archive (and scroll down a bit) to hop through the many (many!) before-and-afters.
Then there's the Boilermaker Shops at the Yards, where some work was being done even on Easter Sunday. The walling off the interior space for the different tenants has begun, with the studs visible--and some drywall has even gone in on the mezzanine level, as seen at right, in a view from 4th Street, through what will be the Bluejacket space.
The work is on-going at Canal Park, but continues to not be terribly exciting from a photographic standpoint, unless you're wowed by images of new curbs. But the Canal Park Expanded Photo Archive can take you for a walk around the park's perimeter to see the current views, if you don't see it every day. (I also like my barbed wire shot [above right], the result of desperation after being without photos from the east side of 2nd and L for a very long time now. But, no, I didn't jump the fence.)
I also enjoyed being watched very closely by a USDOT security guard with a clipboard as I took photos of the park's progress from the south side of M Street. "What are you taking photos of?" she finally asked, trying to sound stern. "Stuff," I replied, as I smiled and kept walking.
There's also updated shots from 225 Virginia/200 I (seen at right), with the landscaping now starting to go in.
If you want to see today's entire batch (213 of 'em), here they are, remembering to click the fun little Click to see all available photos of this location. icon if you want to see the entire range of photos for a certain location. If you want even more new-ish pictures, here's photos I took around 1st and Half Streets on Tuesday, to get the Fairgrounds exterior into the official archive.
Now I need to go find that peanut butter bunny. I think I earned it.
Comments (7)
   
 
 More Recent News

JDLand.com Home

Comments

Kelsey25252 says: (4/10/12 9:47 AM)
Any pictures of the demolitions on Virginia Ave by NCC? Better hurry, there's not much left!


JD says: (4/10/12 9:49 AM)
I haven't been able to get over there, but a reader did send this tweet yesterday of the garage's demise: link



JD says: (4/10/12 10:16 AM)
[And, by the way.... I don't quite feel like mentioning this in an actual blog post yet, but I do feel like people should know that I've been battling some health issues for a few months now, and I'll probably continue to be less than 100% for a few months more. (I will be going under the knife in later May, if all goes according to plan.) So, if I seem like I'm blowing off some things, I'm really not--I have good days and bad days, and also just have to kind of pick my spots, especially when there's also my "real" job and the rest of my life to deal with, too. For instance, I was able to go out and get these photos on Sunday, but I had to give up and head home before I got all the ones I wanted--then I had to write the blog post a few hours later from the sofa, after a nap. :) So, bear with me for a little while longer. Thanks....]


Maelstrom says: (4/10/12 2:41 PM)
Get well soon, JD. I don't think anyone else could put all this information on the transformation of the neighborhood as well as you. You're irreplaceable.


JD says: (4/10/12 6:29 PM)
Thanks, M!


MJM says: (4/11/12 2:59 PM)
Yeah, best wishes for a speedy recovery


IMGoph says: (4/22/12 9:48 AM)
I'm glad you just said "stuff" to the guard, though a "none of your business, I'm on public property" would have been really baller. :)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  
Get JDLand Updates In Your Inbox!

conngs0 on Whaley's Announces May: Sounds like a good spot. Any early reviews?
Westnorth on Whaley's Announces May: @JES: Talked with a server today, and it'll be just inland of the bridge's easte...
JD on Training Ship Freedom: (I keep meaning to add the option to include one image with comments, but haven'...
Ampersand on Training Ship Freedom: I can't figure out how to put a picture in this comment, but I saw the Freedom S...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/16
800 899 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/16/16
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/16
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/11/16
1200 B/O I ST SE   ROBBERY  05/08/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/08/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/16
1220 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/05/16
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
300 K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/02/16
UNIT B/O I ST SE   ROBBERY  04/29/16
1100 B/O 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/27/16
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/25/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 04/24/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/16

Recent Issued Building Permits Archive  
1233 1ST ST SE   
05/10/16 
null / KONE INC
EN1602126 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS ELEVATOR 5 & 6 CONDITION : APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600083 & MVQ1600084 SEE : B1403486 AND TL1600011
1108 2ND ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600233 / CONSTRUCTION
THREE BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE ALL 3 BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF ...
1331 2ND ST SE   
05/16/16 
DC WATER / DC WATER; CORMAN CONSTRUCTION
AH1600698 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 & B1605659 DC WATER, CORMAN CONSTRUCTION 202-863-0052
1005 3RD PL SE   
05/04/16 
PETER TRIFU / PETER TRIFU; MOHAMED ABDELMOTY
B1607724 / CONSTRUCTION
I WOULD LIKE TO INCREASE THE SIZE OF MY BATHROOM FROM 3 FEET BY 6 FEET TO 3 FEET BY 7 FEET 3 INCHES AND ADD A SHOWER. THE WEST WALL WILL BE EXTENDED 9 INCHES INTO AN EXISTIMG CLOSET AND THE EAST WALL WILL BE EXTENDED 6 INCHES INTO OPEN LIVING SPACE. THE DRAIN AND PLUMBING WILL BE MODIFIED TO ACCOMIDATE THE NEW POSITION OF THE EXISTING SINK, TOILET AND THE ADDITION OF THE SHOWER. THE DOOR WILL BE M...
   
05/12/16 
PETER D TRIFU / JOSE M. MORALES
P1606192 / SUPPLEMENTAL
1300 4TH ST SE   
05/10/16 
LOU FOREST CITY - WASHINGTON / GEORGE MORETRENCH AMERICAN CORP.
SB1600070 / CONSTRUCTION
TO DRILL AND INSTALL 18 DEEP WELLS WITH 12" DIAMETER OF BOREHOLE AND 6" WELL CASING, AND 4 OBSERVATION WELLS WITH 6" DIAMETER OF BOREHOLE AND 2" WELL CASING TO 80 FEET VIA MUD ROTARY DRILLING FOR THE TEMPORARY CONSTRUCTION DEWATERING OF THE PROPOSED BELOW GRADE CONSTRUCTION. ALL DRILL SPOILS WILL BE CONTAINED AND DISPOSED OF ACCORDING TO FEDERAL AND DISTRICT OF COLUMBIA REGULATIONS.
1220 12TH ST SE 200   
05/11/16 
WASHINGTON GAS LIGHT CO / RALPH THREATT
E1606272 / SUPPLEMENTAL
1220 12TH ST SE   
05/11/16 
CORPORATE OFFICE PROPERTIES TRUST / KELLY WALSH; CORPORATE OFFICE PROPERTIES TRUST; THOMAS DVORAK
E74440979 / SUPPLEMENTAL
909 HALF ST SE   
05/05/16 
null / MARK A DORSEY
EN1601560 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) TRACTION / STEEL / CENTRALLY / VERTICAL TRANSPOTATION (2ND FLOOR)
1210 HALF ST SE   
05/04/16 
HINES GLOBAL / CARLOS MONTES; HINES GLOBAL; CARLOS MONTES
P42209552 / SUPPLEMENTAL
   
05/04/16 
HINES GLOBAL / CARLOS MONTES; HINES GLOBAL; CARLOS MONTES
G36907854 / SUPPLEMENTAL
70 I ST SE 832   
05/17/16 
null / NA NA NA
EHOP1690678 / HOME OCCUPATION
10 I ST SE   
05/19/16 
TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB / TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB; ECS MID-ATLANTIC LLC
SB1600232 / CONSTRUCTION
FIVE BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE ALL 5 BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF P...
201 L ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600234 / CONSTRUCTION
TWO BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE BOTH BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF POW...
14 M ST SE   
05/16/16 
ANDREW ROYALS
B1608241 / CONSTRUCTION
REPAIR AND REPLACEMENT OF WINDOW AND FRAME
50 M ST SE   
05/18/16 
KCG 50 M LLC ENGLEWOOD LLC / TIEVY; KCG 50 M LLC ENGLEWOOD LLC; TRACIE CLAXTON-RAMOS
SG1600300 / CONSTRUCTION
2 SIGNS CHANNEL LETTERS ILLUMINATED 2 BLADE SIGNS ILLUMINATED
100 M ST SE   
05/04/16 
SQUARE 743 INC / MICHAEL A. BONDS
P1605993 / SUPPLEMENTAL
   
05/19/16 
SQUARE 743 INC AND 100 M ST SE LLC / LHREV WASHINGTON M STREET LLC A DELAWARE LLC; KIM MITCHELL CDKM CONSULTING LLC
B1605938 / CONSTRUCTION
APPROX 7938 SF TENANT FIT OUT - CURRENTLY SHELL CONDITION - FLOORING, DOORS, AND HARDWARE, DRYWALL, CEILILNG, LIGHTS, MECHANICAL, SPRINKLER AND PLUMBING TO BE ADDED. ALL WORK TO BE DONE ON 7TH FLOOR
800 NEW JERSEY AVE SE   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602094 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600091 & MVQ160092
   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602095 / SHOP DRAWING
TYPE OF ELEVATOR : THREE (3) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS ELEVATOR : G1, G2, G3 CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600090 & MVQ160089 & MVQ1600088
   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602107 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) ELECTRICAL / STEEL / CENTER / PASSENGER / 2 FLOORS ELEVATOR : G6, CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600093
861 NEW JERSEY AVE SE   
05/18/16 
NA CSX TRANSPORTATION, INC.
AH1600719 / CONSTRUCTION
WORK IN PUBLIC ROW WITHIN THE VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT LOD FOR UTILITY, DEMOLITION, AND CONCRETE STRUCTURE CONSTRUCTION ACTIVITIES. ACTIVITIES WILL OCCUR AT THE FOLLOWING AREAS: BETWEEN 2ND STREET SE AND 3RD STREET SE ALONG VIRGINIA AVENUE SE, INTERSECTION OF 3RD STREET SE AND VIRGINIA AVENUE SE, BETWEEN 3RD STREET SE AND 4TH STREET SE ALONG VIRGINIA AVENUE SE, INTERSECTION OF...
880 NEW JERSEY AVE SE   
05/19/16 
880 NEW JERSEY AVENUE LLC / 880 NEW JERSEY AVENUE LLC; BRUCE PADDOCK SWIMMING POOL COMPANY
SP1600027 / CONSTRUCTION
1ST, 2ND 3RD, AND 4TH EXTENSION TO PERMIT SP1300053 TO EXPIRE 6 / 18 / 2016
1200 NEW JERSEY AVE SE 1ST FLR 20024   
05/06/16 
JBG/FEDERAL CENTER LLC / null
P1606040 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
05/05/16 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / . WATERFRONT CHURCH
B1607854 / CONSTRUCTION
REMODEL TWO BATHROOMS, REPLACE LIGHTING IN BATHROOM S & VESTIBULE -IN EXISTING BOXING - FITNESS CENTER UNDER CO1301802 NO CHANGE OF USE
1244 SOUTH CAPITOL ST SE   
05/05/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / CLARK CONCRETE CLARK CONCRETE
AH1600676 / CONSTRUCTION
AFTER HOURS TO LOAD AND UNLOAD TRUCKS FOR MATERIAL AND CONCRETE FROM 5 / 7 / 2016, 12 MIDNIGHT TO 5 / 9 / 2016 7AM
300 TINGEY ST SE 1ST/2ND   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606136 / SUPPLEMENTAL
300 TINGEY ST SE 202   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606138 / SUPPLEMENTAL
300 TINGEY ST SE   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602037 / SUPPLEMENTAL
   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602039 / SUPPLEMENTAL
355 WATER ST SE   
05/18/16 
PAUL GRUBER NEW BELGIUM BREWING COMPANY
TN1600129 / CONSTRUCTION
SPECIAL EVENT TOUR DE FAT 1 36X24 STAGE 5 20X20 TENTS 1 20X20 HEXAGON TENT NO GENERATORS
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.