Since January, 2003
            
 (a random before-and-after moment)
January 16, 2006
April 29, 2007
Half at P, Looking Northeast (see more)

The meeting probably isn't even finished yet, but if you didn't (or did) stop by the first of DDOT's public meetings on their nine-month M Street SE/SW Transportation study, you can browse the presentation slides and take the stakeholder survey, already posted on the new web site for the project.
There were a pile of high-powered bloggers and transportation geeks in attendance, so I'm sure there will no shortage of coverage of both this meeting and the entire study that I will happily link to, but there wasn't much news coming out of this first session--it was mainly to introduce the study, talk about the methodology (which you can see in the slides) and then break up into small groups to stand around maps and give feedback about what attendees see as issues that need addressing. (But first, just as at the 2010 meeting, one woman who is particularly anti-bike once again made her feelings known.)
DDOT's representatives say they will be using some 33 other studies that have been done on the area in question as part of this overall study, covering the area from 14th St. SW to 12th Street SE south of the freeway down to the waterfront(s), though that then brought a comment from the audience about when studying is going to stop and there's going to be action.
There will be two more public meetings, one in March-ish and another in June-ish, with the study expected to be completed in August-ish.
UPDATE: Here's DCist's report on the meeting. And SWill's.
Comments (2)
   
 
 More About meetings

JDLand.com Home

Comments

darren says: (1/13/12 9:00 AM)
Hello,

I am an employee at one of the large employers in the neighborhood, though my comments are solely my own, and have been commuting in/out of here for nearly four years. I attended last night's meeting, and was struck by the degree to which bicyclists and area residents should be natural allies in this study. (judging solely from last night, we currently aren't, but here's why we should be).

As one of the many additional people streaming into and out of this neighborhood every day, the last thing I want to do is add an additional tailpipe to your air, an additional car in your spot, an additional horn to your ears, and an additional bumper to hit things with. But most of my coworkers are happy to do just that, and sometimes so am I. Why? Because while it may seem congested to you, it seems just fine for us.

You might have guessed, I want more and better bicycle and pedestrian facilities, I want lanes taken away on M Street and South Cap, and I want to be able to cross under the SE/SW Freeway without fear. But rather than oppose those things, I hope area residents will consider a trade-off -- make their neighborhood a utopia for bicycling and walking, and in turn, demand and hold accountable developers and employers to make sure they're doing EVERYTHING and then some to make sure the trips they generate are not adding tailpipes and horns to your streets. Take a look at what my employer is doing to reduce car trips in and out of your neighborhood, and then demand that they quadruple their efforts, because judging from your comments last night, they obviously haven't done enough.

We can help you preserve your neighborhood. You can help us prevent more tragedies on M St (such as that which killed one of my sorely-missed colleagues). Support us in providing real facilities that encourage us and our families and coworkers to walk, bike, and use transit. We'll support you in preserving your residential parking, preventing cut-through traffic, and channeling commuters to the freeways. I'll turn myself inside-out encouraging my coworkers to transport themselves to work in ways that are less impactful to the neighborhood. And none of us will simply accept that when a new employer comes to town, all of it's employees should be allowed to just hop in their cars and drive to work. Let's demand that the businesses in the area get serious about cutting the number of cars coming to their properties. How about it?


Westnorth says: (1/16/12 2:53 PM)
WashCycle's Friday blog post also noticed that the "one woman who is particularly anti-bike" is one and the same from last time. It's unfair to other stakeholders (and I noted this to DDOT staff at the meeting) to let a few people dominate the discussion, and set a negative and combative tone, with harangues and complaints (in many cases about things that don't have anything to do with the plan's scope) before the group as a whole has a chance to ask questions about the plan and simultaneously share their thoughts -- which was the point of the tables with maps in the back.

That said, I thought that DDOT's presentation was too technical and didn't do a good job of conveying the scope of the plan, how the plan differs from previous plans, or whether DDOT has done any sort of background research on the corridor. I understand that this was an initial meeting, but some very basic facts about the corridor (this many people live here, work here, these are the assets and how many people they move, how many they could move, these are some of the ways people get around) might have set the tone a bit better than a few people weeping and wailing about the Eleventh Commandment ("thou shalt have free reserved parking spaces for thy multiple automobiles directly in front of thy home").

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

bdj on ANC 6D07 Candidates: Yes!! Jimmy Johns would be great!
JD on ANC 6D07 Candidates: ABC application seems to indicate that the new liquor store at 1015 Half Street ...
CJBabyDaddy on ANC 6D07 Candidates: Last time I went to the TG on 1st Street, just north of the ballpark, I was unse...
GarfieldPark on ANC 6D07 Candidates: It wasn't that bad, although too hipster for me. I'll take a Jimmy John's...you'...
bdj on ANC 6D07 Candidates: I've always thought that Taylor Gourmet was a poor restaurant. Food wasn't great...
JD on ANC 6D07 Candidates: That's my assumption, too. By the time you demolish the upper floors, you don't ...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
150 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/22/18
700 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/22/18
1000 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Street / Unknown
 09/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/18
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/15/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/13/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/08/18
400 B/O M ST SE   THEFT
Shoplifting
 09/02/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/29/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/26/18

Recent Issued Building Permits Archive  
1108 3RD ST SE   
09/04/18 
JULIANA DUFFY / HERVE BILLIET
SOL1800816 / CONSTRUCTION
This is a new rooftop solar installation for 1108 3rd Street SE, Washington, DC, 20003.
   
09/06/18 
JULIANA DUFFY / null
E1810366 / SUPPLEMENTAL
1015 4TH ST SE   
09/17/18 
GASTON CHAN / KYLE YOST
SOL1800945 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
09/19/18 
GASTON CHAN / null
E1810828 / SUPPLEMENTAL
1300 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810371 / SUPPLEMENTAL
1346 4TH ST SE   
09/07/18 
null / MITCH PERMUY 7274240492
E1810372 / SUPPLEMENTAL
1310 10TH ST SE   
09/10/18 
NAVFAC / BLAINE LINKOUS
EX1800093 / CONSTRUCTION
Federal property at the Washington Navy Yard. Project is for the installation of outside underground utilities including new potable water valves and stormdrain. All work is cut and cover utility install. Sediment controls will be provided.
2 EYE ST SE   
09/18/18 
null
M1803959 / SUPPLEMENTAL
   
09/18/18 
null
P1809280 / SUPPLEMENTAL
4 I ST SE   
08/29/18 
CRESCENT COMMUNITIES / MITCH A. PERMUY 727-210-0492
E1809865 / SUPPLEMENTAL
   
09/18/18 
JOHN MORIARTY / null
M1803958 / SUPPLEMENTAL
2 I ST SE   
08/27/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801251 / CONSTRUCTION
WR #3573836-VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM
   
08/29/18 
CRESCENT CAPITAL VIEW LLC / KIM MITCHELL
TL1800059 / CONSTRUCTION
EXPEDITION / VELOCITY PROGRAM - INTERIOR WORK ONLY FULL-SERVICE RESTAURANT WITH 78 SEATS AND 80 OCCUPANTS INDOORS. WITH BUILDOUT OF AN EXISTING COLD DARK SHELL STRUCTURE AT THE GROUND FLOOR OF THE 2 I STREET BUILDING PERMIT B1713380. THE BUILDOUT IS FOR A RETAIL KITCHEN.
   
09/11/18 
MCDONALDS CORPORATION / null
E1810511 / SUPPLEMENTAL
   
09/19/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801319 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO - WARD 6 - 20003 - PEPCO CREWS WILL BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLES - CREW WILL BE WORKING AT NIGHTS DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9PM TO 7 AM - PEPCO CREWS WILL ALSO BE WORKING WEEKENDS (SATURDAY AND SUNDAYS) FROM 6AM TIL 6PM - WORK IS ONGOING
150 I ST SE   
09/10/18 
WILLIAM CSMITH CO / GLENNWOOD ROGERS
M1803857 / SUPPLEMENTAL
418 L ST SE   
09/14/18 
null / NA NA NA
EHOP18998072 / HOME OCCUPATION
202 M ST SE   
09/05/18 
UNITED STATES OF AMERICA / DANIEL KISER; X
SG1800384 / CONSTRUCTION
Installation of 4 wall mounted signs. 2 @ 26.25 SF and 2 @ 35.5 sf
300 M ST SE   
08/27/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809629 / CONSTRUCTION
INTERIOR RENOVATION TO 3RD FLOOR OFFICE SPACE FOR NEW MEDICAL OFFICE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. LEAD WALLS FOR X-RAY ROOM. NO STRUCTURAL. 3006 SQUARE FEET. THE CENTERS FOR ADVANCED ORTHOPEDICS, LLC SUITE 325 **CHANGE IN USE, LEVEL 2 ALTERATION
   
09/05/18 
FEDERAL CENTER LP / null
P1808927 / SUPPLEMENTAL
   
09/05/18 
FEDERAL CENTER LP / null
P1808926 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE 1ST FL   
09/18/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P1809276 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 3RD FLOOR   
09/17/18 
SQUARE 742 LLC / null
P1809222 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
08/30/18 
SQUARE 742 LLC / null
E1810159 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
09/07/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ASHLEY TORRES
TL1800132 / CONSTRUCTION
Tenant Layout to 1st floor for commercial bank use. 3036SF
   
09/10/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M1803863 / SUPPLEMENTAL
   
09/12/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1810553 / SUPPLEMENTAL
125 O ST SE   
08/29/18 
DISTRICT OF COLUMBIA / DAVID T FONTANA
B1803497 / CONSTRUCTION
Revision to issued permit B1700636 for new six story DC WATER HQ office to include: Minor door, ramp and partition changes, corrections to foundation, slab and framing due to field conditions, MEP & FA coordination with other changes, minor changes to landscaping and water utility site work.
71 POTOMAC AVE SE   
08/27/18 
FORIDA ROCK PROPERTIES INC / null
AH1801250 / CONSTRUCTION
afterhours to pour concrete on jobsite from 8 / 27 / 2018 to 9 / 27 / 2018 from 9pm to 7am
   
08/31/18 
FORIDA ROCK PROPERTIES INC / MITCH PERMUY 7272100492
E1810173 / SUPPLEMENTAL
79 POTOMAC AVE SE   
09/13/18 
RIVERFRONT HOLDINGS I LLC / JOHN HOMICK 301-390-4800
E1810571 / SUPPLEMENTAL
221 TINGEY ST SE   
09/10/18 
KELLY THORNBURG / GLENNWOOD ROGERS
M1803850 / SUPPLEMENTAL
227 TINGEY ST SE   
09/07/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1801286 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for precast concrete fa├žade panel installation. Work to take place from 7pm on 9 / 24 / 2018 to 7am on 9 / 25 / 2018.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.