Just sent out by DDOT: "Today the District Department of Transportation (DDOT) announced the start of land acquisition and preliminary design work for the South Capitol Street Project, which includes replacement of the current Frederick Douglass Memorial Bridge. [...] While the Record of Decision (ROD) is still pending, the Federal Highway Administration signed the project's Final Environmental Impact Statement (FEIS) following the requisite 30-day public comment period that ended in May."
I'm posting quickly, so I shall now crib unabashedly from my post on the Final EIS, from back in April:
If you are interested in this subject, there is more verbiage and documentation accompanying the plans than you could ever dream of. (Traffic studies! Environmental consequences! Technical reports!) And I've written a lot about the process, which began more than a decade ago with other studies before the EIS got underway. And I'm sure there will be posts on other blogs delving more specifically into portions of the plans. But, since most people probably want to know "what does this mean for me?", you can see this graphic (from the 224-MB chapter 2 of the FEIS) giving a quick overview of what changes are planned along South Capitol Street if the final EIS is signed off on (and, more importantly, if funding is secured). The short version, for the west side of the Anacostia:
* Add "pedestrian amenities" and enhance the streetcape along South Capitol north of I and along New Jersey Avenue SE north of the freeway.
* Replace the existing ramp to the freeway from South Capitol and I with an at-grade intersection. (This would be a left turn onto a ramp to the freeway from under the freeway, near the current Nats HH economy parking lot.)
* Bring New Jersey Avenue SE back to a 160-foot full right-of-way, and add streetscape enhancements.
* "Reconstruct South Capitol Street as an urban boulevard." This means bringing M Street up to an "at-grade" intersection (no more tunnel), and would include new signalized at-grade intersections to allow traffic to cross South Capitol on K and L streets. (M Street would also get reconstructed between the Halfs [SE and SW].) The section of South Capitol north of M would have the same streetscape that the south portion received during its 2007/08 makeover, with wide sidewalks and a tree-lined median.
* Build a traffic oval at South Capitol, Potomac, Q, as the gateway to a new arched bascule-design Douglass Bridge that would have wide "multi-use trails" (i.e., sidewalks!) in both directions. The existing bridge would be demolished, after the new bridge is built somewhat downriver of the current location.
The Executive Summary (220 MB PDF) gives a good overview of the FEIS and preferred alternative (as it should!), but I also suggest wandering through the Chapter 2: Alternatives section, especially if you came to the neighborhood or JDLand after 2008 and didn't get to follow along during the EIS process, or if you're interested in the additional plans for east of the river, which I'm going to leave to others to discuss. My previous posts on all of this may be of interest as well. If you're wanting to see some of the earlier studies referenced in the FEIS, there are links to them at the top of my South Capitol Street project page.
How much would this all cost? The preferred alternative is priced in this final EIS at $806 million in FY 2014 dollars. (New bridges are expensive, you know.) Note that nothing in today's statement from DDOT says anything about funding, or a construction timeline.
You can also check my South Capitol Street and South Capitol Street Bridge page for all the info about the plans, along with my scores of posts over the past few years.
Comments (6)
   
 
 More About South Capitol St.

JDLand.com Home

Comments

Alan says: (9/29/11 9:35 AM)
Hey JD, what does 'Bring New Jersey Avenue SE back to a 160-foot full right-of-way,' mean?


JD says: (9/29/11 9:53 AM)
If you look on the graphic: link Basically it means widening New Jersey south of the freeway to K (where they can). There's that little service road on the east side that would go away. If you read deeper into the FEIS, it's about adding bike lanes and streetscape improvements (wider sidewalks) on New Jersey than more cars.


JD says: (9/29/11 10:54 AM)
And, since someone asked me privately, I'll also point out that the $806 million price tag is for the entire project. The new bridge itself is priced at $357 million, not all that different from the cost of the new 11th Street Bridges.


Alan says: (9/29/11 1:25 PM)
Thanks!


F says: (10/1/11 2:17 PM)
Considering the work on New Jersey Ave, the construction by W.C. Smith on the Trash Transfer site and the CSX railway project...are the horse stables still going to stay there. There must be some Cruelty to Animals ordinance thats being violated.


AVC says: (10/5/11 2:22 PM)
The woman who runs the horse carriage company and owns the horses has been given an eviction notice from the city as they own the property she has been leasing. Not sure where she will be able to go.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

Gamble Rogers on Peet's Grand Opening: Should’ve made this point clear: CSX was only responsible for the portion of the...
Gamble Rogers on Peet's Grand Opening: JD: yes, CSX agreed to build the bike path — after sustained community input — f...
JD on Peet's Grand Opening: Yes, @202, one of those would be a good idea. I should know the answer to thi...
202_cyclist on Peet's Grand Opening: Speaking of CSX, it looks like they made a mess this morning and spilled some su...
JD on Peet's Grand Opening: From the tunnel folks: "Work continues to progress on street restoration and la...
NavyYardGuy on Peet's Grand Opening: Ahhhh yes! "NO Foods" aka TSTSNBN
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 08/16/18
800 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/15/18
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18

Recent Issued Building Permits Archive  
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.