Since January, 2003
            
 Sliding from Before to After

Posted on Friday was the Staff Report from the Historic Preservation Review Board on the design for the proposed Bier Garden at 8th and L, SE, as the owners of the site at 720 L continue to work toward constructing a one-story building with an accompanying summer garden and roof deck. (You can look to the left, or see a slightly larger version of the design, as it was presented to ANC 6B last week; 6B voted to support the design.)
If you're not up for reading all six pages yourself, here's my Zagat-style report on the report:
It makes for good reading if you're interested in how new buildings in historic districts are evaluated; you might be surprised (I was!) that design guidelines actually "discourage the exact duplication of historic styles," opting instead to encourage applicants to consider a new building as an "enhancement" to the district "while respecting the historic context." The report discusses how the decision to go with a one-story structure could draw on "the vernacular of Washington's modest industrial buildings and alley warehouses," and in fact the report includes a photo of the Bier Garden lot in 1949, when a one-story building housing a laundry/tailor stood on the site.
The report finds that the proposed massing of the new building does reflect the character of the historic district and "references recognizable attributes" of both industrial buildings and traditional beer gardens. The report also sees the rain screen and other more contemporary design choices as reflecting the "whimsy, casualness and somewhat ad-hoc nature of many outdoor beer gardens."
However, there are concerns that there are so many finishes applied "in so many different directions" that the result is a "somewhat chaotic and unfinished appearance," and suggests selecting one or two key ideas that would allow the building "to be showcased in a less hectic manner." Other major issues cited include choices on the roof deck (and the lack of any lighting or shade up there in the current design), the proportions of the doors, and the designs of the rain screens, as well as how the building's "streetscape presence" along both 8th and L.
The report ends with a recommendation that the applicants "restudy the issues outlined [...] as they pertain to the principles of design cohesiveness, proportion and scale, and streetscape presence." It's also recommended that the board delegate final approval of the design to the board staff once the comments from staff and the board are addressed in the revisions.
The hearing begins at 10 am on Thursday, and can be watched live, or on demand starting the next day. (And this will actually be the first HPRB hearing I'll have ever watched!) You can read my previous Bier Garden posts if you're needing to get caught up.
UPDATE: And now we return back to "Beer Garden" from "Bier Garden," as Mark Brody informs me that it was a typo on the plans.
Comments (3)
   
 
 More About 8th Street

JDLand.com Home

Comments

Trulee Pist says: (2/21/11 3:24 PM)
From reading the HPRB staff report by the estimable Amanda Molson, I get the sense HPRB staff took a more professional approach to criticisms and endorsements of the concept than that taken by critics of the Beer Garden at the ANC6B hearing. I am glad ANC6B as well recommends HPRB approve this concept.

1. HPRB staff recommends approval of the site plan, endorsing as well the plan to "mush together" the two lots in question and the massing of the proposed buildings on the newly subdivided lot, and praises the developer and architect for being on the "right track" regarding the design of the rooftop deck. The JDLand/Zagat precis failed to mention those endorsements.

2. The HPRB staff likes the solid wall that screens off the rooftop deck, only they'd like to see the familiar "double cornice" projected molding that you see on the top of most CH buildings to define better where the first story ends and the roof deck wall begins. Also, HPRB staff finds the front door at the corner too big in height and width (on the contrary, misguided ANC6B critics went on and on and on about how they thought the door was "too stubby"), and would like to see a transom window over the 8th Street SE door (something the owner and architect already told ANC6B they'd be happy to add to the plans.)

3. HPRB staff would like to see more openings along the L Street SE wall, so passers-by can see that people in the ground level beer garden are drinking beer, swaying to the oompah music and generally having good, clean fun. That's a suggestion not made by ANC6B, but one I bet the developer will embrace.

4. HPRB staff would like the developer and architect to chill out with all the different materials and what HPRB felt was the excessive height over the 8th and L Street corner and at the northeast corner of the building and in the roofing over the outside staircase to the roof deck. Those are good suggestions and will require some work by the architect and developer to meet those objections. HPRB staff also objects that specific design plans for lighting and for sunscreening the roof deck should be included in the plans. I hope the architect and developer do make changes to meet those objections.

5. No silly talk about drunks falling off the roof, or dropping their drinks off the roof, or jumping up on the counters that hold patrons' drinks set up around the inside edge of the roof deck and also falling off the roof that way, like we heard at ANC6B's hearing. Will it be raining oompah-music-and-beer fans if this get built? Not likely.

I hope HPRB approves these concept drawings with few contingencies, and the project moves forward expeditiously.


Caphilldel says: (2/25/11 9:24 AM)
I heard from a reliable source yesterday that 720 L ST was sold & the bier/beer garden is a no go- (Please) Say it isn't so!!


JD says: (2/25/11 10:17 AM)
It's possible the rumor you're hearing is in reference to the two brown "apartment" buildings just to the west of 720 L, on the other side of the driveway curb cut, which I'm hearing (but haven't confirmed) have changed hands. Guess we'll see when the video from yesterday's HPRB meeting gets posted, since I imagine if the site was sold then the application would have been withdrawn. (I kind of doubt it, but we'll see.)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
Get JDLand Updates In Your Inbox!
  

dude on 49 L Not: Best news all day.
Joni on Soft Opening Tonight/Il: Hmmmm. Unfortunately I wasn't impressed (and I'm not picky). Really hoped I coul...
JD on At Last, I: @CJ, you have my approval. I guess I'm Teddy Roosevelt. :-)
CJBabyDaddy on At Last, I: JDLandama Canal? I've been told I bear a certain likeness, so if nobody minds, ...
JHUGrad on 49 L Not: The city made a good decision. 49 L Street was not a good location for the shel...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
700 B/O L ST SE   ROBBERY
Assault W/i To Commit Robbery (aggravated Assault)
 02/07/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 02/07/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 02/06/16
UNIT B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/03/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 01/31/16
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/29/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 01/19/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 01/18/16
70 B/O I ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/11/16
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/10/16

Recent Issued Building Permits Archive  
1011 1ST ST SE   
02/06/16 
NA NA NA
EHOP1690325 / HOME OCCUPATION
1025 1ST ST SE   
01/20/16 
RUSS TYLER
PC38173572 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1277 1ST ST SE   
02/04/16 
BALLPARK RESIDENTIAL LLC / MILLER&LONG MILLER&LONG
AH1600342 / CONSTRUCTION
AFTERHOURS TO POUR AND FINISH CONCRETE FROM2 / 3 / 2016 TO 3 / 3 / 2016 FROM 5AM TO 9PM. BUILDING PERMIT B1403488
1300 4TH ST SE   
02/05/16 
FC 1346 LLC / MELISSA DIAZ DFM DEVELOPMENT
SH1500076 / CONSTRUCTION
SUPPORT OF EXCAVATION FOR DEVELOPMENT AT 1300 4TH ST SE.
1240 12TH ST SE   
01/22/16 
AECOM TECHNICAL SERVICE
B1603969 / CONSTRUCTION
EXTENSION OF EXISTING PERMIT B1503361. TO EXPIRE 6.14.16
909 HALF ST SE   
02/08/16 
23 I LLC /
P1603241 / SUPPLEMENTAL
70 I ST SE   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602797 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602798 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602799 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602802 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602803 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602804 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602805 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602806 / SUPPLEMENTAL
   
02/08/16 
70 EYE STREET ACQUISITION LLC / PAUL M. KOLB
E1602807 / SUPPLEMENTAL
82 I ST SE   
01/29/16 
JOHN MORIARTY & ASSOCIATES OF VIRGINIA / KTT PERMIT EXPE LLC
AH1600329 / CONSTRUCTION
CONTRACTOR TO PERFORM BRICK MASONRY WORK ON EXTERIOR OF BUILDING. SUNDAYS ONLY - 9AM TO 5PM - 1 / 31 / 16 2 / 7 / 16 2 / 14 / 16 AND 2 / 28 / 16.
   
01/29/16 
CSX TRANSPORTATION INC / DANIEL M. NARH
P1603168 / SUPPLEMENTAL
317 L ST SE   
01/21/16 
NA NA NA
EHOP1690275 / HOME OCCUPATION
50 M ST SE   
02/05/16 
KCG 50 M LLC / OWENS TECHNOLOGIES INC
AH1600352 / CONSTRUCTION
AFTER HOURS PERMIT TO ALLOW THE FINISHING OF NEWLY PLACED CONCRETE FROM THE END OF THE NORMAL WORK DAY UNTIL 12AM UNDER PERMIT B1501877.
55 M ST SE   
01/29/16 
HINES GLOBAL REIT 55 M STREET LLC / PEPCO PEPCO
AH1600334 / CONSTRUCTION
NIGHT WORK NECESSARY FOR CONSTRUCTION OF CONDUIT AND MANHOLES FOR SERVICE AT 1277 FIRST ST. SE TO PREVENT INTERFERENCE WITH DDOT PARKING GARAGE. PUBLIC SPACE PERMIT PA114427-R2.
   
02/03/16 
WILLIAM SNODDEY / JOSEPH SEMPER; WILLIAM SNODDEY; JOSEPH SEMPER
E22238682 / SUPPLEMENTAL
   
02/05/16 
HINES GLOBAL REIT 55 M STREET LLC /
P1603423 / SUPPLEMENTAL
80 M ST SE   
02/03/16 
REIT WELLS
PC63025208 / POST CARD
REPLACEMENT OR REPAIR OF NOT MORE THAN 10 EXISTING OUTLETS AND NOT MORE THAN 10 EXISTING LIGHTING FIXTURES FOR A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
99 M ST SE   
01/21/16 
BALLPARK SQUARE 701 LLC / JOSEPH E RICHARDS
E1603127 / SUPPLEMENTAL
   
02/03/16 
BALLPARK SQUARE 701 LLC / JOSEPH E RICHARDS
E1603392 / SUPPLEMENTAL
100 M ST SE   
01/29/16 
PARSONS COMPANY / STANLEY-CSS
B1604162 / CONSTRUCTION
INSTALL MAGNETIC LOCK W / REX SENSOR REX BUTTON AND FIRE UNLOCK RELAY INTEGRATION AS REQUIRED UNDER IBC 1008.1.9.8
   
01/21/16 
MONUMENT REALTY MONUMENT REALTY / CLINTON PARKER; MONUMENT REALTY MONUMENT REALTY; PIERRE CHOUPO
AR80952153 / SUPPLEMENTAL
   
01/28/16 
CB RICHARD ELLIS / RONALD OTT; CB RICHARD ELLIS; RONALD OTT
E45568021 / SUPPLEMENTAL
   
02/01/16 
SQUARE 743 INC / LLOYD C LONDON
E1603304 / SUPPLEMENTAL
   
02/07/16 
C. B. RICHARD ELLIS INC. / NICHOLAS DODD; C. B. RICHARD ELLIS INC.; NICHOLAS DODD
E38474788 / SUPPLEMENTAL
202 M ST SE   
01/20/16 
UNITED STATES OF AMERICA / ; NORTEAST ELECTRIC
SG1600147 / CONSTRUCTION
INSTALL 2 SIGNS ON WALL 1-4'-10" X 10"-8" 1-2'4"X6'-9"
1244 SOUTH CAPITOL ST SE   
02/03/16 
1244 S. CAPITAL RESIDENTIAL LLC / ANDREW WILLINGHAM; NA; BRIAN WERRELL
BCIV1500117 / CONSTRUCTION
SITE GRADING FOR REDEVELOPMENT OF EXISTING PARKING LOT INTO 13 STORY MIXED USE RETAIL AND RESIDENTIAL BUILDING WITH 2 LEVELS OF SUBSURFACE PARKING. PROJECT ALSO PROPOSED STREETSCAPE IMPROVEMENTS AND SITE AMENITIES
   
02/05/16 
1244 SOUTH CAPITOL RESIDENTIAL LLC C/O THE JBG COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
FD1500123 / CONSTRUCTION
FOUNDATION-TO-GRADE ONLY UNDER THIS SUBMISSION. THIRD PARTY REVIEWED
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.