Since January, 2003
            
 (a random before-and-after moment)
August 18, 2007
June 20, 2016
Cushing at N, Looking North-Northeast (see more)

The Capitol Riverfront BID just wrapped up its 2010 Annual Meeting, which certainly seemed to be the largest of them so far. The big part of the meeting is the unveiling of the Annual Report, chock full of statistics and photos. I'm not going to summarize it, mainly because I've been writing all year about most of the news and data contained in it, and also because if you're truly interested in the neighborhood you should read it yourself. :-)
There were two items in Michael Stevens' remarks that I thought were of note, though:
* Apparently an agreement has been worked out with DC Water (aka WASA) that will allow the "connection" between Diamond Teague Park (across from Nationals Park) and the Yards Park to be built, starting this spring. In the past, a floating bridge has been discussed as how this connection would be completed, but have asked the BID for more info and will post when I know more.
* In discussing the many parks of the neighborhood, Michael Stevens said that they are "hoping" that Canal Park will be completed in 2011--though, as he said that, the slide being displayed showed 2012 as the expected completion date. Given that the park is supposed to take 12-14 months to build, it would seem to be unlikely that the entire park would be ready before the end of next year, though perhaps some portions of it might be able to be open sooner.
UPDATE: Here's the slides used by Michael Stevens during his remarks; the information on the connection between Teague and the Yards is on pages 22-24, with a rendering showing a walkway out over the water, looking exactly like an extension of the boardwalk at the Yards. The proposed project is listed as "a partnership among Forest City Washington, DC Water and the Office of the Deputy Mayor for Planning and Economic Development." And, on slide 27, Canal Park is listed with a delivery date of 2012.
(PS: I also enjoyed seeing one of my Yards Park photos on the second of the slides shown by DC Water's George Hawkins; maybe next time they'll ask me if they can use it!)
Comments (13)
   
 
 More About Capitol Riverfront BID

JDLand.com Home

Comments

Bruce says: (12/14/10 2:38 PM)
it was a nice event (Although I dont seem to see much work being done on Canal Park) Am I missing something or are the workers invisible?


Andy says: (12/14/10 4:24 PM)
Hi, JD, I saw 'Freeway Underpasses' mentioned in the slides. Did they say anything specific about the underpass on New Jersey? Thank you.


JD says: (12/14/10 4:27 PM)
@Andy: nothing specific, other than wanting to continue to work on beautifying them and improving the connections between neighborhoods. I assume this has something to do with the money they were applying for to spiffy up the NJ Avenue underpass, but I haven't heard anything more.


BillP says: (12/15/10 9:20 AM)
the connector between the yards and diamond teague parks is great news!

the lack of activity on canal park is worrisome. i'm still worried that a new administration could yank the funding on a project that isn't theirs and that hasn't been started yet. i don't recall all the funding details but i believe dc was cutting a big check for part of it.

congrats to the BID for putting on a great event!

JD - it was my pleasure to meet you yesterday!


Jessica says: (12/15/10 9:26 AM)
There was a booth at the last 8th St festival that showed the murals that they are planning to do. I can't find the actual drawings online, but here's a starting point:

link


MJM says: (12/15/10 10:01 AM)
The mural at 8th St is different than the sea of blue waves and lights planned for the NJ Ave underpass...they had handouts at one of the ANC meeting but can't find them on-line but it was canxed due to BID budget


C says: (12/17/10 11:47 AM)
slide presentation is nice however the stereotypical asian man with camera on slide 23 and the man showing a little too much PDA on slide 24 are interesting choices

for those panting over the start of the park, I know it's tough to wait for the area to appreciate to justify your living in an overpriced box, but give it time


JD says: (12/17/10 11:55 AM)
"Those panting over the start of the park." Hmmmm. Perhaps I should tally up which reader has posted the most comments on Canal Park over the years. I can't imagine who that reader would end up being.



MJM says: (12/17/10 2:43 PM)
You noticed that too with the camera - thought that was pretty funny


John says: (12/18/10 10:33 AM)
Anyone know if/when the boardwalk/trail along the Navy Yard will be open to general public users? That would be an easy way to connect the open space near the river.


MJM says: (12/18/10 10:35 AM)
Well the sign that was put up following the groundbreaking was removed - maybe that is the first step in Gray's plan of removing any mention of Fenty from Washington DC


JD says: (12/18/10 10:36 AM)
The latest update I got was that talks are "progressing."


C says: (12/18/10 11:58 AM)
true dat

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  

JD on Temporary Closure of: Note there is now a sneak peek on the main home page for message board posts. [image]
JD on Temporary Closure of: That just means there's somewhere for everyone! Okay, the earliest-of-early v...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/29/16
700 B/O L ST SE   ROBBERY  07/28/16
1100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/16
1200 B/O HALF ST SE   BURGLARY
Burglary Two
 07/24/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/22/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 07/20/16
900 B/O 4TH ST SE   ROBBERY  07/20/16
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/19/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 07/19/16
1000 B/O NEW JERSEY AVE SE   BURGLARY
Burglary One
 07/15/16
300 B/O L ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/15/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/14/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 07/13/16
1000 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 07/12/16
1000 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/10/16
1230 SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/09/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/06/16
900 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 07/05/16
900 B/O 4TH ST SE   ROBBERY  07/04/16
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/16
1100 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/01/16

Recent Issued Building Permits Archive  
1000 1ST ST SE   
07/27/16 
BEN LAZARUS - SQUARE 740 LLC AKRIGDE / BEN LAZARUS - SQUARE 740 LLC AKRIGDE; ADAM STROHBECK - GEOTECHNICAL SOLUTIONS, INC.
SB1600324 / CONSTRUCTION
GSI plans to drill 8 soil test borings for geotechnical purposes with a hollow-stem auger equipped with a split spoon sampler for the SPT N-Value tests down to a maximum depth of 80 feet below existing grades. All borings will be drilled to the maximum depth or auger refusal whichever occurs first. The boreholes dimension will be 3.25 inches and shall be grouted upon completion. See attached work ...
1331 2ND ST SE   
07/18/16 
DC WATER
AH1600880 / CONSTRUCTION
After Hours work for structure excavation and support for B1605659 DC Water, Corman Construction 202863-0052
1220 12TH ST SE   
07/22/16 
COPT COPT / COPT COPT; STEPHEN PALMER ELE
SG1600378 / CONSTRUCTION
Install 1 Illuminated wall sign - BAE Systems
1210 HALF ST SE   
07/26/16 
HINES GLOBAL REIT 55 M STREET LLC / NA HINES GLOBAL REIT 55 M STREET LLC; STUART
SG1600386 / CONSTRUCTION
Two exterior lighted signs to be installed on front of retail space. One single faced oval 60 inches wide x 33 inches High and One Vertical 7 ft double faced lighted sign
80 M ST SE   
07/22/16 
WELLS REIT II 80 M STREET LLC / WELLS REIT II 80 M STREET LLC; JOHN GIUSEPPE-RAMCO
D1600714 / CONSTRUCTION
INTERIOR DEMOLITION TO 1ST, 2ND AND 3RD FLOOR OFFICE SPACE COLUMBIA PROPERTY TRUST AS SHOWN ON THE ELECTRONICALLY SUBMITTED ARCHITECTURAL DEMOLITION PLANS. NO STRUCTURAL WORK INVOLVED. NO CHANGE IN USE. INTERIOR WORK ONLY. 66,684SF
515 M ST SE   
07/14/16 
FOREST CITY / FOREST CITY; KILLETTE AND ASSOC
B1610381 / CONSTRUCTION
REMOVE 2 NON LOAD BEARING PARTITIONS TO CREATE OPEN SPACE AND REPLACE EXISTING DOORS WITH NEW GLASS DOORS IN KIND.
1111 NEW JERSEY AVE SE   
07/19/16 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE
E1608268 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE   
07/14/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / GLENNWOOD ROGERS
P1607382 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Community Center ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.