At Monday's ANC 6D meeting, Bryon Johnston of the 11th Street Bridges Project gave a presentation on the rebuilding of the bridges, including an overview of the design and its main features as well as an update on the construction progress. He was nice enough to pass along the slides, which may not mean quite as much without his narration but are still helpful for people who haven't been following along through the process.
A few parts of the new design on the Near Southeast side of the project are worth (re-)pointing out, if you can make it through my torrent of descriptions:
* The "freeway" traffic and the "local" traffic will now be separated, with four lanes inbound and four lanes outbound on the freeway/upriver bridge and two lanes inbound/outbound on the "local"/downriver bridge (which Johnston was referring to as "Local 11th Street" because 11th will now feel like a street that crosses a river), as shown on slide 10.
* The local bridge will allow easier access between Near Southeast and Anacostia, for not only cars but pedestrians and bicycles, as well as streetcars when the routes are expanded. As part of this, 11th Street south of M is going to become two-way, and there will be bike lanes in both directions on 11th north of the bridge. (Slide 9)
* Another feature that appears to be coming together for pedestrians and bicyclists is creating two overlooks that jut out above the river on the south side of the local bridge--these would use two of the in-water piers from the current downriver bridge, and you can see them at left and on slide 11.
* One of the big changes for traffic flow for both Near Southeast and Capitol Hill is that there is going to be a new two-lane on-ramp to go westward on the Southeast Freeway toward Virginia at 11th Street, underneath where the current flyover ramps are. (See slide 7.) Folks who have easier access to 11th Street will no longer have to drive along Virginia Avenue and/or 3rd Street to go westbound on the freeway.
But part of this new 11th Street intersection is that traffic coming from Pennsylvania Avenue along the sunken road that currently feeds directly into the freeway will instead be brought up to street level at this new signalized 11th Street intersection and will then drive straight onto the new on-ramp. So there will be some consternation from drivers using this route. (This is also shown on slide 7.)
* To go across the river from Near Southeast on the freeway bridge, for access to DC-295 northbound and I-295 southbound, drivers will have a new ramp on the southeast corner of 11th and M (slide 4). The existing ramp at 8th and Virginia will still be available, too.
* There will still be an exit ramp from the inbound freeway bridge to I Street, just as there is now (slide 4).
* If you look at slide 4 very closely (and/or click on the bird's-eye view at right) and follow the paths off of each bridge, you can see how the freeway bridges coming across the river will have an exit for M Street similar to the current exit, but it deposits drivers at M just west of 12th instead of using 12th itself. It also no longer has the neat little N Street cut-through directly from the ramp that some Navy Yard workers cherish. To get to the Navy Yard, drivers will turn left on M, then left at 11th, and then go to whichever gate they need.
Other information in the slides includes: a graphic showing of the new ramps and accesses on the east side of the bridges at 295 and MLK (slide 12), of which the biggest addition is that you'll now be able to get to and from 295 and the bridges in all directions. There's also recent construction photos (including the first structural steel being laid on the freeway bridge), and information on stormwater management areas, and upcoming traffic impacts (slide 19).
It's expected that the freeway bridge will open about a year from now, with the new local bridge being finished in the winter of 2012/2013. (Dr. Gridlock wrote about recent milestones and upcoming work a few weeks ago.)
If you want to know more, there's my 11th Street Bridges project page, and you can also spend a couple months reading the Environmental Impact Statement to see all the studying they did of potential, um, impacts. There's also this Fact Sheet that they handed out.
Comments (5)
   
 
 More About 11th Street Bridges

JDLand.com Home

Comments

Rick says: (11/10/10 7:06 AM)
JD - link to fact sheet is broken.


JD says: (11/10/10 8:24 AM)
Thanks, fixed.


BillP says: (11/10/10 9:16 AM)
SO excited that the prior stupidity of (1) not being able to get on the SE/SW freeway from 295 South and (2) having to use Penn Ave to go from the SE/SW freeway to 295 North is being corrected.

I know JD has mentioned "odd" placement of freeway signs on 395 and the SE/SW freeway as they pertain to near SE. Has anybody heard if they are going to try to "name" or "number" the stretch of the SE/SW freeway after 395 north departs via tunnel and 295, especially now that these freeways will actually be properly connected in all directions?


Froggie says: (11/11/10 8:43 PM)
Bill: officially, the SE Freeway is I-695. Whether DDOT signs it or not after project completion is anybody's guess. Given current precedent, I expect them to sign it as "TO I-295/DC 295" or "TO I-395".


JD says: (11/11/10 8:46 PM)
695 is so Baltimore. :-)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News

Chaifetz10 on Two-Year Change in: Have a random question for anyone and everyone here as 1) It's technically outsi...
JD on Signs and Wonders: {pointed silence}
202_cyclist on Signs and Wonders: Another blog has a post about the 11th Street bridge park ( ). I think this is ...
jdc on Signs and Wonders: @snakegriffin - that's fascinating. I wonder how the sound chamber created by th...

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/17/16
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/16/16
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/16
16 B/O M ST SE   ROBBERY  08/12/16
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/09/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (shoplifting)
 08/08/16
50 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/02/16
600 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/02/16
700 B/O L ST SE   ROBBERY  08/01/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/29/16
700 B/O L ST SE   ROBBERY  07/28/16

Recent Issued Building Permits Archive  
1150 5TH ST SE 20002   
08/11/16 
ALAN J PHELPS / DOUGLAS FOSTER
B1509540 / CONSTRUCTION
1. Renovation of existing first and second floor of the academic wing of the Van Ness building. 2. Square footage is approximately 26,000 SF ,For phase 1 3. Cost of construction is 11.5M 4. Scope of work details a. Convert existing space in to 6 new classroom space. These classrooms will be two PreK -3, two prek-4, and two Kindergarten classes. Also for phase 1,...
1150 5TH ST SE   
08/12/16 
DISTRICT OF COLUMBIA / JOHN HOMICK
E1609156 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / MATT LOSIGNOR
P1608656 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / ORLANDO M CATANA
E1609149 / SUPPLEMENTAL
82 I ST SE   
08/15/16 
GDCV EYE STREET LLC / GDCV EYE STREET LLC; KIM MITCHELL CDKM CONSULTING LLC
B1611941 / CONSTRUCTION
FIRST EXTENSION TO PERMIT B1507990 TO EXPIRE ON 3 / 17 / 17
   
08/15/16 
CSX TRANSPORTATION INC / BEDCO MOBILITY INC.
EN1602806 / SHOP DRAWING
Type of Elevator : One (1) vertical wheel-chair lift / steel / garage level 2 / handicap lift (13th floor)
125 L ST SE   
08/11/16 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1600945 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
80 M ST SE 1   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608566 / SUPPLEMENTAL
80 M ST SE 2   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608568 / SUPPLEMENTAL
80 M ST SE 3   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608569 / SUPPLEMENTAL
100 M ST SE PT OF 4TH   
08/11/16 
QUARE 743 INC . / QUARE 743 INC .; JOHN GIUSEPPE-RAMCO
B1611810 / CONSTRUCTION
renovation to parts of an existing 4th floor office space, tech marine business as shown on the attached mech., plumb., elect., fire protection, demolition, and arch. dwgs. interior work only. no change in use. no struct. work. 800 sf.
300 M ST SE   
08/06/16 
FGSF TEST
PC92978992 / POST CARD
Installation of 1 temporary construction trailer on private property.
   
08/06/16 
SDS SDSDS / LAVANYA SIKHINAM; SDS SDSDS; ENRIQUE LYON
E90011839 / SUPPLEMENTAL
   
08/07/16 
XVB XVBX / FSGVSF SFGS; XVB XVBX; DAVID FARMER
E77515115 / SUPPLEMENTAL
909 NEW JERSEY AVE SE 1311   
08/11/16 
null / NA NA NA
EHOP1690902 / HOME OCCUPATION
861 NEW JERSEY AVE SE   
08/09/16 
NA CSX TRANSPORTATION, INC.
AH1600944 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
08/11/16 
null / THOMAS P MCGUIRE
E1609117 / SUPPLEMENTAL
385 WATER ST SE   
08/12/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1608654 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.