Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
October 1, 2005
March 9, 2014
9th at Virginia, Looking North-Northeast (see more)

Here's a news item that people have been waiting on for a good long while--the official Canal Park groundbreaking ceremony has been scheduled for Monday, August 30 Tuesday, August 31, at 10:45 am, with the mayor expected to be in attendance. Construction on the three-block publicly funded park is expected to take 12 to 14 months, so look for it to be finished in probably late 2011--just in time to get a lot of use out of the ice skating rink.
[Here's a slightly edited version of a description I wrote a few months ago] For those who haven't been following along, Canal Park will stretch from I to M streets SE along the two parts of Second Street--some people may know this location as the open field across from Subway and Five Guys, about three blocks northeast of Nationals Park. The southern block, across from the US Department of Transportation headquarters, will have a large plaza, a "significant water feature" that will transform into an ice skating rink in winter, and a large two-level pavilion that will be home to a cafe and observation area. The middle block has a rain garden, a children's play area, a small performance stage, and an open lawn. The northern block, the "most pastoral of the three," will have a large open lawn, and the slight grade of the block as it slopes upward toward I Street has allowed the designers to envision this as an informal amphitheater, for events like summer movie nights and whatnot. There is also a "linear rain garden" that runs along the eastern edge of the park's three blocks. (Note that K and L streets will still be open to traffic, though there will be well-marked crosswalks.)
If you want to know more, visit the park's official web site. Or my page, if you want to see lots of photos of schoolbuses from the old days. And this report from the National Capital Planning Commission goes deep into the design, if you want to know *still* more. And you can read all my old Canal Park blog posts, back to the beginning, to relive the long road to this groundbreaking.
This groundbreaking will be just a week before the opening of the neighborhood's other new signature open space, the Yards Park, just a few blocks to the south, along the Anacostia River.
UPDATED: The groundbreaking has shifted by one day, to Tuesday, August 31.
Comments (0)
 
 More About Canal Park
 All posts: Canal Park

JDLand.com Home

Comments

R says: (8/23/10 3:02 PM)
Is it me or does there seem to be a lot more projects gaining new life again? This is positive news for SE DC! Wonderful.


JD says: (8/23/10 3:09 PM)
It does seem that way, though I'd caution that the all of the projects with "life" right now--Capitol Quarter Phase II, Yards Park, Foundry Lofts, and Canal Park--each are either completely or partially funded with public $$$.

When a development gets started that has no public funds attached to it, that will be a bit more telling as to the state of the commercial real estate market (and the banking industry).


F says: (8/23/10 4:17 PM)
Lets not forget 1015 Half St. Yes, it was partially finished before it was taken over after bankruptcy, but I believe its 100% privately funded.

I think we need to get some JDLand bloggers to write to Panera, Clydes, Mortons, Barnes & Noble, Whole Foods, Legal Seafood, Tasca, etc and let them know that we're waiting for them to come!


JD says: (8/23/10 4:22 PM)
F, one small correction: There's only one JDLand *blogger*. The legions you are referring to are commenters. :-)



c says: (8/23/10 5:28 PM)
but you said there wasn't going to be another groundbreaking because they already did one, oh never mind

best news ever, thanks to the minions for pushing on this and to everyone at the Canal Park Development Association for setting a time line and sticking to it


JD says: (8/23/10 5:36 PM)
Curt--When did I ever say such a thing? The ceremony years ago wasn't a groundbreaking, it was the presentation of the check from the USDOT pilot fund. I've known for months there was going to be a groundbreaking at the end of the summer.

But, clearly it makes you feel better to take shots at me (since you do it in so many of your comments, no matter which username you post under), so today's missive from you is right in line with that. I'm glad your day is complete now!


AKR says: (8/23/10 5:36 PM)
Thanks again for all the detail. I'm a little disappointed that there's not more green space. It looks a least half of the land will no longer be green space - but rather a stone plaza. Is the cafe supposed to be publically run?


JD says: (8/23/10 5:39 PM)
AKR--That plaza is only on the southern block--as the park moves northward across the other two blocks, there's much more green space. The southern plaza is meant to be very "active," since it's so close to M Street and big office buildings.

I don't know any details about the cafe at this point.


MJM says: (8/23/10 6:22 PM)
Those sections are pretty big if you look at an overhead shot - I think in the end people will be surprised with the amount of green space that will be there. With that park and 5.5 acres along the river and the eventual river trail we are gonna have a lot more green space than some parts of the city. Plus I'm looking forward to the ice skating portion!


Mark says: (8/24/10 10:45 AM)
Great news! Thanks for passing it along JD.


Misplaced says: (8/24/10 3:52 PM)
Ditto on the ice skating portion MJM. I can't think of another outdoor ice skating rink (however big or small) in DC proper, can anyone else? I imagine that should garner a little bit of foot traffic during the offseason no?


David Garber says: (8/24/10 4:12 PM)
@Misplaced,

There's the ice rink at the sculpture garden on the mall, and in Pershing Park also across from the Willard on Penn Ave... but this will certainly be the most "neighborhood"-y rink in DC.


Misplaced says: (8/24/10 5:35 PM)
I don't know how I forgot about the Gallery's rink. My girlfriend and I go there often during the winter!

Either way, judging by the designs it'll be more than just an oval shape rink, which should make it plenty different from the other offerings!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
JES on Homewood Suites/50 M: The trellises are kind of boring, but they're not deal-breaker ugly. The Zoning ...
JD on Homewood Suites/50 M: Thanks--an error left over from the days when I called it the L Hotel. I thin...
Edna on Homewood Suites/50 M: You mean the Hampton Inn is at 1st and N. I have to agree with the Zoning Commi...
JD on Homewood Suites/50 M: I think you've labeled it Forest City's development before, but that's incorrect...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O L ST SE   THEFT F/AUTO /  07/30/14
L ST SE AND 2ND ST SE   THEFT F/AUTO /  07/30/14
70 B/O I ST SE   MOTOR VEHICLE THEFT /  07/29/14
70 B/O I ST SE   THEFT /  07/29/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/28/14
400 B/O K ST SE   THEFT /  07/24/14
1000 B/O 1ST ST SE   THEFT /  07/23/14
1600 B/O SOUTH CAPITOL ST   THEFT F/AUTO /  07/20/14
400 B/O M ST SE   BURGLARY /  07/20/14
70 B/O I ST SE   THEFT /  07/18/14
1300 B/O BOWYER ST SE   THEFT /  07/17/14
1500 B/O SOUTH CAPITOL ST   THEFT /  07/17/14
1100 B/O CUSHING PLACE SE   THEFT F/AUTO /  07/17/14
1400 B/O 1ST ST SE   THEFT /  07/16/14
1000 B/O 7TH ST SE   THEFT F/AUTO /  07/16/14
70 B/O I ST SE   THEFT /  07/15/14
16 B/O M ST SE   THEFT /  07/14/14
1000 B/O NEW JERSEY AVE SE   THEFT /  07/14/14
900 B/O NEW JERSEY AVE SE   THEFT F/AUTO /  07/13/14
400 B/O M ST SE   THEFT F/AUTO /  07/12/14
200 B/O VIRGINIA AVE SE   MOTOR VEHICLE THEFT /  07/10/14
900 B/O HALF ST SE   THEFT F/AUTO /  07/10/14
100 B/O M ST SE   THEFT /  07/09/14
4TH ST SE AND L ST SE   ROBBERY /  07/08/14
800 B/O POTOMAC AVE SE   THEFT /  07/07/14
300 B/O K ST SE   THEFT F/AUTO /  07/07/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/05/14
100 B/O L ST SE   THEFT F/AUTO /  07/04/14
1100 B/O 2ND PLACE SE   THEFT F/AUTO /  07/03/14
2ND PLACE SE AND I ST SE   THEFT F/AUTO /  07/02/14
70 B/O I ST SE   ROBBERY / GUN  07/02/14
200 B/O I ST SE   THEFT F/AUTO /  07/02/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
804 3RD ST SE    Maximiliano Villagra 
Issued
streetfixture; new  
 08/05/14
to
08/06/14
904 3RD ST SE    Janel Fitzhugh 
Issued
streetfixture; new  
 07/01/14
to
08/14/14
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
800 NEW JERSEY AVE SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/20/14
to
08/22/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 06/17/14
to
08/17/14
    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
1105 NEW JERSEY AVE SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/13/14
to
08/11/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1025 1ST ST SE   
07/26/14 
NA NA NA
EHOP1490737 / HOME OCCUPATION
1100 1ST ST SE   
07/15/14 
NA NA NA
EHOP1490710 / HOME OCCUPATION
1265 1ST ST SE   
07/29/14 
CAPITAL RIVERFRONT HOTEL LLC / JOHN HOMICK
E1407634 / SUPPLEMENTAL
   
07/30/14 
CAPITOL RIVERFRONT HOTEL LLC /
P1407417 / SUPPLEMENTAL
921 4TH ST SE   
07/29/14 
RICHARD AND MARGIT TRACEY / RICHARD AND MAR TRACEY
F1400538 / CONSTRUCTION
CUSTOM FABRICATED ORNAMENTAL IRON FENCE WITH GATE TO BE PAINTED BLACK INSTALLED PRIMED.
1212 4TH ST SE   
07/11/14 
FC 1212 LLC /
P1406926 / SUPPLEMENTAL
   
07/14/14 
MIKE LENARD / BHAR; W. SAKIE BHAR
SG1400363 / CONSTRUCTION
INSTALL ONE SET OF BUILDING SIGN ON TO EXISTING BUILDING
1103 9TH ST SE   
07/25/14 
ICP PARTNERS POTOMAC 810 LLC / TALBERT DOWLING
E1407537 / SUPPLEMENTAL
1220 12TH ST SE   
07/16/14 
FAIRBANKS MORSE ENGINE / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1409041 / CONSTRUCTION
INTERIOR ALTERATION TO EXISTING 2578 SF OFFICE SPACE. AFFECTED AREA LESS THAN 1000 SF TO CREATE DEMISING WALL AND MINOR ALTERATIONS TO PARTITION PLAN IN CONFERENCE AREA. MECHANICAL AND ELECTRICAL WORK INCLUDED.
326 L ST SE   
07/17/14 
NA NA NA
EHOP1490715 / HOME OCCUPATION
55 M ST SE   
07/16/14 
HINES GLOBAL REIT 55 M STREET LLC / TYRAN D. BRANNUM
E1407255 / SUPPLEMENTAL
20 M ST SE   
07/17/14 
SOUTHEAST REALTY LLC / JOHN GIUSEPPE-RAMCO
TL1400132 / CONSTRUCTION
FIRST TIME TENANT BUILDOUT FOR FAST FOOD ESTABLISHMENT - SUBWAY SANDWICH SHOP SEATING 41 AS SHOWN ON THE ATTACHED ARCH. MECH. PLUMB. ELECT AND FIRE PROTECTION DWGS. INTERIOR WORK ONLY.
   
07/30/14 
JOHN GIUSEPPE-RAMCO / ALEXANDER KIM; JOHN GIUSEPPE-RAMCO; UWE NEUMANN
AR45710386 / SUPPLEMENTAL
55 M ST SE   
07/15/14 
HINES
B1409693 / CONSTRUCTION
INSTALL 6 AUTOMATIC DOOR OPERATORS LOCATED AT THE ELEVATOR LOBBIES BETWEEN THE 4TH-7TH FLOORS
100 M ST SE   
07/29/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
TL1400149 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 4TH FLOOR OFFICE SPACE. PARTITIONS MEP AND LIFE SAFETY. 3 283 OF OFFICE SPACE ON 4TH FLOOR ONLY. NORTHWOOD SPEC SUITE
901 M ST SE   
07/15/14 
CARLTON RAY
AH1400584 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
07/15/14 
CARLTON RAY
AH1400585 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
800 NEW JERSEY AVE SE   
07/14/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1409654 / CONSTRUCTION
REVISION TO PERMIT #SH1400039 FOR A OWNERSHIP CHANGE
   
07/28/14 
WC SMITH CO. / COLIN CLARK
FD1400040 / CONSTRUCTION
FOOTINGS AND FOUNDATIONS TO GRADE FOR A FUTURE APARTMENT BUILDING
1000 NEW JERSEY AVE SE   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1406902 / SUPPLEMENTAL
   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRANDON K VIERNES
M1402531 / SUPPLEMENTAL
   
07/22/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / DONALD R. MCGLYNN
E1407426 / SUPPLEMENTAL
   
07/29/14 
JENNIFER MAY /
B1410235 / CONSTRUCTION
REPLACE EXISTING KITCHEN CABINETS WITH NEW CABINETS. CREATE A HALF WALL ON A NON LOAD BARING WALL. NEW LIGHTING.
   
07/29/14 
KOROUSH CHARKHABI
PC79044251 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 PLUMBING FIXTURE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
25 POTOMAC AVE SE   
07/29/14 
FLORIDA ROCK PROPERTIES INC / MITCH A. PERMUY
E1407629 / SUPPLEMENTAL
1236 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400340 / CONSTRUCTION
WE PROPOSE DRILLING THREE SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLE...
1244 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400341 / CONSTRUCTION
WE PROPOSE DRILLING TWO SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLED ...
300 TINGEY ST SE   
07/23/14 
CM-YARDS LLC / DWIGHT SMITH
B1408815 / CONSTRUCTION
INSTALL OUTSIDE SEATING SUMMER GARDEN.
   
07/30/14 
FC BOILERMAKER LLC / SHELBY FIGAROORE
P1407430 / SUPPLEMENTAL
201 TINGEY ST SE   
07/11/14 
JBG COMPANIES / GEORGE DELGADO
B1409541 / CONSTRUCTION
ONE DAY SPECIAL EVENT FOR BMW SHOW--150 OCCUPANTS EXTERNAL GENERATOR RESTROOMS AND LIGHTING BAY DOORS TO REMAIN OPEN DURING FUNCTION
   
07/22/14 
JBG/SEFC 170 LLC / MICHAEL B. BELL
E1407422 / SUPPLEMENTAL
300 TINGEY ST SE   
07/30/14 
FC BOILERMAKER LLC / NABIL MUKHAR
E1407660 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.