Since January, 2003

October 29, 2005

May 1, 2010
5th at K, Looking North (see more)

ANC 6B commissioner Norm Metzger reports today on a meeting held earlier this week with the Marines on their plans for a new barracks to replace the aging "Building 20" on the southeast corner of Eighth and I. According to his notes (and in line with previous scuttlebutt), the Marines listed three locations as passing the stringent security requirements for a new barracks: Square 882 (former site of the old Capper Seniors building that's slated to have mixed-income apartments within the next few years plus eventually a 600,000-sq-ft office building); the northeast corner of the Navy Yard, where a Marine facility is already located; and the block at 10th and G, SE, that currently houses Tyler Elementary School and its baseball field.
Apparently the community group "fairly vigorously set out 'issues' for two the sites," repeating the status of 882 as I've heard it, which is that the Housing Authority's plans and financing moves for the housing portion of the block are well underway --but who knows how much pull the guys with guns might actually have {ahem}. Using the existing Marine site on the northeast corner of the Navy Yard could be problematic, especially given the Navy Yard's announced need to expand its workforce. And there would be a "firestorm" from the community if the Marines tried to take over the Tyler site.
So the group meeting with the Marines suggested two other possible sites, both in Near SE: the open field on the south side of Virginia Avenue west of Seventh street at the Marine Annex built in 2004, and the site of the closed-down Exxon at 11th and M.
The Marines are having a series of community workshops about their plans for new space, and workshop #2 is being held next week, on Tuesday, March 23 from 6 to 8 pm at Van Ness Elementary (1150 5th St., SE) and then repeated the next morning from 8:30 to 10:30 am at Eastern Market's North Hall. The agendas for the meetings are now available, and they include a section about the possible sites before the meetings move to "focused breakout sessions" to talk about those sites and any other possibilities. The project web site also has documents from the first workshop, including a revised Vision, Goals, and Objectives statement that was updated after input from the workshop's participants.
Comments (0)
More posts: Barracks, meetings, Navy Yard
 

See All Current News Items

Comments

G St says: (3/19/10 3:15 PM)
Ooo-rah!

DG-rad says: (3/19/10 4:09 PM)
Exxon site! the closer to my hood the better.

Mark says: (3/19/10 4:31 PM)
Block 882 - DCHA needs to get out of the way and support the USMC!!

Michael says: (3/20/10 11:49 AM)
Given the modern fortress-like quality of all government installations, and especially security and military sites, I'm not looking forward to any expansion in the neighborhood. Anywhere. It will be an inhospitable, impermeable barrier.

Caeli says: (3/21/10 11:56 PM)
If you think a new barracks is a way to revitalize a neighborhood in transition, you are fooling yourself!
This lot should be used as it was intended to, for the Capper redevelopment! The entire Near Southeast area is being redeveloped and no disrespect but more barracks that house young Marines is not the best idea for this neighborhood. Finally, block 882 should absolutely not be used to "support" the USMC.

BBC says: (3/22/10 5:05 PM)
I fully support the marines in my neighborhood. I frankly don't see how the USMC will revitalize a neighborhood any less than the Capper redevelopment. I hope they bring everything on their wish list and more! Believe me, there is plenty of schenanigans here near the Van Ness Elementary school. Although the marines are not here to clean up our mess, I firmly believe that just there presence here will do a lot for us. Plus, marines do us all a great service. It is because of the fine men and women such as them that we go to bed at night without keeping one eye open. I would be (and am) proud to call them my neighbors!!!

MJM says: (3/22/10 6:44 PM)
You know an apartment complex if zoned for mixed use (commercial/residential) can support small businesses such as retail (shopping, eating establishments, bars, etc). Will it be that zoned that way - I haven't seen a new building in this city w/o commercial space on the first floor?

Tell me the last time you saw a military barrack with stores part of the barrack complex and open to the general public. Let me know when someone can answer that - I'll buy you beer for a year (Exchanges don't count).

Military brings in people who spend money at places and on put down roots - not in barracks but in living space such as apartments and condos. Residential/commercial space brings in people who can start businesses (those areas zoned for that - e.g. Justin's) and can spend money at those new businesses.

BTW, the Marines aren't police - think there is a law from them getting involved in shenanigans?!?

If the barracks are built, don't complain when there are no places to shop or eat near you because of the barracks.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2014!

Tell readers about your
apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
DABer on Wednesday Tidbits: Its too bad DC Water won't give up the main water pump building at N Place. I think it would serve ...
MJM on Wednesday Tidbits: I face the stadium and have not heard the horn. Can def hear the crowd though. Makes me sad that I...
202_cyclist on Wednesday Tidbits: @JT: unfortunately when the Nats lose 8-0, there aren't as many horns to hear.
JD on Wednesday Tidbits: Alas, asking the hard-of-hearing chick who lives north of the freeway will probably not get a good a...
Latest News
  
For past mile markers in the neighborhood's evolution,
see my Near Southeast DC Timeline.

 
Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror
Today in (Recent) Near Southeast History

I must have been sleeping! Nothing happened on this date!


City Government Data for Near Southeast
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
100 B/O L ST SE   THEFT F/AUTO /  04/05/14
1500 B/O SOUTH CAPITOL ST   THEFT /  04/04/14
330 B/O K ST SE   THEFT /  04/04/14
16 B/O M ST SE   THEFT /  04/04/14
700 B/O L ST SE   THEFT /  04/03/14
UNIT B/O N ST SE   ROBBERY / KNIFE  03/23/14
800 B/O L ST SE   THEFT F/AUTO /  03/21/14
200 B/O I ST SE   THEFT /  03/20/14
200 B/O I ST SE   THEFT /  03/20/14
1100 B/O 11TH ST SE   THEFT F/AUTO /  03/19/14

Active Public Space Permits Archive  
1011 1ST ST SE    COLIN CLARK 
Pending
excavation; new  
 03/03/14
to
05/01/14
    COLIN CLARK 
Approved (Pending Payment)
paving; landscaping; new  
 04/23/14
to
06/27/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
100 M ST SE    WASHINGTON GAS 
Assigned
excavation  
 04/23/13
to
04/22/14
1201 M ST SE    Michael Manoski 
Pending Document
excavation  
 05/06/13
to
05/05/14
1333 M ST SE    WASHINGTON GAS 
Assigned
excavation  
 05/01/13
to
04/30/14
1111 NEW JERSEY AVE SE    NJA Associates LLC 
Assigned
paving; streetfixture; landscaping; excavation; new  
 06/03/13
to
06/02/14
301 TINGEY ST SE    Chuchart Kampirapang 
Assigned
 
 06/07/13
to
06/06/14
    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1100 1ST ST SE   
03/31/14 
ONYX ON FIRST ONYX / HAMID FAKRI
B1405403 / CONSTRUCTION
FIRE DAMAGE REPAIR TO ORIGINAL CONDITION. REMOVE AND REPLACE IN KIND AND AS NEEDED.DRYWALL INSULATION FINISHES. NO STUCTURAL DAMAGE.FLOOR AND CEILING ARE CONC.
1011 1ST ST SE   
04/09/14 
MILLER?LONG
AH1400386 / CONSTRUCTION
AFTERHOURS TO TAKE DOWN TOWER CRANE WITH 200 TON CRANE SAT ? SUN 4 / 12 / 2014 AND 4 / 13 / 2014 FROM 5AM TO 9PM
1277 1ST ST SE   
03/31/14 
GROVESNER / STEVENS
F1400231 / CONSTRUCTION
TEMPORARY PLYWOOD FENCE TO INCLOSE LOT ON PRIVATE PROPERTY
1299 1ST ST SE   
03/31/14 
GROVESNER / STEVENS
F1400232 / CONSTRUCTION
TEMPORARY PLYWOOD FENCE TO CLOSE OFF LOT
1381 1ST ST SE   
04/07/14 
DISTRICT OF COLUMBIA /
SB1400233 / CONSTRUCTION
INSTALLATION OF 3 GEO SOIL BORINGS TO A DEPTH OF 30FT 4' DIAMETER USING GEOPROBE 3 OUT OF 3 ARE TMMW
1008 3RD PL SE   
04/01/14 
NA NA NA
EHOP1490434 / HOME OCCUPATION
1212 4TH ST SE   
04/01/14 
MIKE LENARD / MIKE LENARD; FVI2020
TL1400052 / CONSTRUCTION
INTERIOR TENANT LAYOUT FOR NEW FAST CASUAL RESTAURANT OF APPROXIMATELY 1600 SQUARE FEET WITH NEW KITCHEN HOOD DINING RESTROOM AND ASSOCIATED SUPPORT.
   
04/09/14 
GSA GSA / BRIAN FREW; GSA GSA; JOSEPH RICHARDS
E37554102 / SUPPLEMENTAL
1000 5TH ST SE   
04/04/14 
DC HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1404942 / CONSTRUCTION
TEMPORARY CONSTRUCTION TRAILER TEMPORARY CONSTRUCTION FENCE AROUND THE PERIMETER OF THE PROPERTY AND TWO PORTA POTTIES AND TO INCREASE TO A TOTAL OF 4 PORTA POTTIES AT THE PEAK OF CONSTRUCTION. TRAILERS WILL BE ON BLOCKED ON TEMPORARY CMU BLOCKS - POWERED FROM TEMPORARY SERVICE BY PEPCO TRAILERS WILL BE EQUIPPED WITH RESTROOM SYSTEM THAT WILL BE SERVICED - NO PLUMBING LINES AS THEY ARE SELF CONTAINED
   
04/11/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
SH1400015 / CONSTRUCTION
SHEETING ? SHORING FOR NEW COMMUNITY CENTER
1220 12TH ST SE   
04/15/14 
WASHINGTON GAS LIGHT CO / STEPHEN R. HOLMAN
P1404623 / SUPPLEMENTAL
1015 HALF ST SE   
04/09/14 
HALF ST SE LLC / SAM HOLLEN RAMCO OF DC INC.
B1405731 / CONSTRUCTION
INTERIOR RENOVATION FOR 1ST FLOOR SERVICE CORRIDOR. PARTITIONS DOORS MECHANICAL ELECTRICAL AND LIFE SAFETY.
75 I ST SE   
04/07/14 
DRI DEVELOPMENT SERVICES LLC / JOSE S ALVARADO; DRI DEVELOPMENT LLC; JOSE S ALVARADO
E16994763 / SUPPLEMENTAL
   
04/07/14 
DRI DEVELOPMENT SERVICES LLC / JOSE S ALVARADO; DRI DEVELOPMENT LLC; JOSE S ALVARADO
E10943636 / SUPPLEMENTAL
409 I ST SE   
04/07/14 
SCOTT A FAULK TRUSTEE / RALPH THREATT
E1404619 / SUPPLEMENTAL
309 K ST SE   
04/06/14 
GERRITT LANG
PC61450444 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
306 L ST SE   
04/17/14 
MICHAEL THOMPSON
B1311538 / CONSTRUCTION
1.CRAWL SPACE FOUNDATION REPAIR CRAWL SPACE UNDERPINNING AND EXCAVATION 2. ADD CONCRETE SLAB AND EGRESS WINDOW. 3. UPGRADE EXISTING ELECTRICAL PLUMBING AND MOVE MECHANICAL CLOSET
50 M ST SE   
04/17/14 
KEN FINKELSTEIN ENGLEWOOD LLC / DAVID BOOKBINDE ECS MID-ATLANTIC LLC
SB1400244 / CONSTRUCTION
A TOTAL OF 6 BORINGS WILL BE ADVANCED ACROSS THE PROPERTY WITH A GEOPROBE DRILL RIG TO A DEPTH OF 25 FEET BELOW SURFACE GRADE. THE DIAMETER OF THE BOREHOLE WILL BE 2.25 INCHES. SOIL WILL BE SCREENED THROUGHOUT THE DEPTH OF EACH BORING AND EACH 5-FOOT COMPOSITE SAMPLE WILL BE ANALYZED. GROUNDWATER WILL BE COLLECTED FROM TEMPORARY WELLS IN THREE BORINGS IF ENCOUNTERED. ALL BORINGS WILL BE GROUTED WITH APPROVED BENTONITE SLURRY UPON COMPLETION. SEE WORKPLAN FOR ADDITIONAL DETAILS.
901 M ST SE   
04/14/14 
CARLTON RAY / DANIEL SCHAALE
AH1400397 / CONSTRUCTION
EXCAVATION IN ROADWAY
1201 M ST SE   
04/14/14 
CARLTON RAY / DANIEL SCHAALE
AH1400396 / CONSTRUCTION
EXCAVATION IN ROADWAY
   
04/14/14 
SAMUEL PAXTON
PC81065987 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 PLUMBING FIXTURE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
86 N ST SE   
04/17/14 
BELFAST VALLEY CONTRACTORS / KIM MITCHELL CDKM CONSULTING LLC
TC1400011 / CONSTRUCTION
ERECT TEMPORARY TOWER CRANE AT 1ST AND N ST SE
1100 NEW JERSEY AVE SE   
03/31/14 
SQUARE 742 LLC / MARK A. PELUSO
E1404421 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
04/14/14 
PHILIP BROWN
PC47087282 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
1105 NEW JERSEY AVE SE   
04/01/14 
ST MATTHEWS BAPTIST CHURCH / DANIEL M. NARH
P1404388 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
04/07/14 
WASHINGTON NATIONALS STADIUM LLC / FRED GRIFFITH; WASHINGTON NATIONALS STADIUM LLC; JAY LIVESAY
E53144683 / SUPPLEMENTAL
301 TINGEY ST SE   
04/11/14 
NA NA NA
EHOP1490466 / HOME OCCUPATION
   
04/11/14 
NA NA NA
EHOP1490467 / HOME OCCUPATION
301 WATER ST SE   
04/02/14 
FC LUMBER SHED LLC / FRANK V CANTWELL
E1404522 / SUPPLEMENTAL
355 WATER ST SE   
04/01/14 
MIKE BRAMSON
TN1400088 / CONSTRUCTION
40 X 60 TENT 30 X 50 TENT 30 X 80 TENT 10 X 120 TENT 10 X 10 TENT 800 SQ FT FENCING
301 WATER ST SE   
04/04/14 
FC LUMBER SHED LLC / RICHARD V CAREY
P1404549 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Projects Underway
Twelve12/Yards
Park Chelsea
Southeast Blvd.
River Parc
  
Nationals Park
Visiting Nats Park
What's New Around the 'Hood
Food Options Map
Parking/Transportation
Ballpark Construction Photos
Stadium Event Photos
In the Pipeline
Hampton Inn
1111 New Jersey
800 NJ/Whole Foods
Lofts at Capitol Quarter
Ballpark Square
New Douglass Bridge
Yards at DC Water
Virginia Ave. Tunnel
99 M St.
Monument/Half Street
Community Center
Capper Apartments
250 M Street
Florida Rock
909 Half Street
Congressional Square
1000 South Capitol
SC1100
New Marine Barracks
Factory 202/Yards
Nat'l Comm. Church
Completed
Lumber Shed ('13)
Boilermaker Shops ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts/Yards ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 NJ Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
Nationals Park ('08)
70/100 I ('08)
Seniors Bldg Dem. ('07)
400 M ('07)
SoCap Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Overviews
Capper/Carrollsburg
Ballpark District
New Jersey Ave.
M Street
South Capitol St.
WASA
The Yards
Lower 8th Street
East M Street
Boathouse Row


Links of Interest

JDLand.com Wins 2008 Knight-Batten Citizen Media Award
As part of the Knight-Batten Awards for Innovations in Journalism, JDLand was given the 2008 Citizen Media Award. Read all about it.

Capitol Riverfront Business Improvement District
Covering Near Southeast & Buzzard Point.

Studies/Initiatives/Government Documents:
11th Street Bridges EIS
South Capitol St. Bridge EIS
South Capitol Gateway Corridor/Anacostia Access Study
Anacostia Riverwalk Trail
NCPC's New Vision for South Capitol Street (2005 Update)
Anacostia Waterfront Initiative (2005)
Near Southeast Draft Urban Design Framework (2003)
Urban Land Institute South Capitol Street Corridor Report (2003)
Neighborhood Strategic Action Plan (2002)
DC Streetcars (may run down M Street SE someday)

Capitol Gateway and Southeast Federal Center Zoning Overlays
Two documents that spell out in extreme detail exactly what the requirements are for developments along South Capitol, M, in the Ballpark District, and at "The Yards". Read also my short explanatory treatise on these two overlays.

Pre-Redevelopment Media Overviews:
A Transformed Neighborhood Awaits Stadium (WP, 8/15/05)
      includes huge map of development plans
The Morphing of a Forgotten Neighborhood (WP, 9/2/2004)
      A brilliant take on the neighborhood!
Betting Big on Near Southeast (WP, 7/15/04)
Hope for the Waterfront (WBJ, 01)
Seeking a Better View On the Waterfront (WP, 3/8/98)
 

DC Government
Mayor's Office
Planning/Economic Development
   Office of Planning
DC Consumer & Regulatory Agency
DC Office of Zoning
DC Municipal Regulations | Zoning
DC Dept. of Transportation

DC City Council
Tommy Wells

ANCs: 6D | 6B
David Garber (6D07)
Kirsten Oldenburg (6B04)
Police: MPD-1D | PSA 105

Other Organizations
National Capital Planning Commission
Earth Conservation Corps
Capitol Hill Restoration Society
Barracks Row Main Street
Marines Community Integrated Master Plan
 

 

News Publications
The Hill Rag
The Southwester

Other DC Neighborhood/City Blogs
SW DC - The Little Quadrant That Could
The Hill is Home
Congress Heights on the Rise
Greater Greater Washington
WashCycle
Penn Quarter Living
Frozen Tropics
The Triangle
14th and You
The 42
Beyond DC
Richard Layman
 




Top of Page | Contact JD | Advertise on JDLand
Near Southeast RSS Feed

© Copyright 2014 JD.
All photos © Copyright JD - See information on photo uses, licensing and purchasing.