Rounding up some new and Tweeted tidbits, now that I've recovered from cranking out the State of the Hood: * (h/t "reader X") The second foreclosure sale held yesterday for the boarded-up apartment building and surrounding lots at Potomac, Ninth and L brought no bids above the $2 million starting point, so the properties will now return to the lender. An earlier auction back in October had brought a $2.461 million winning bid, but that deal fell through. The properties were originally bought by ICP Partners in 2006, along with the gray building at Eighth and Potomac, for $9 million. * Via ANC 6B03 commissioner Norm Metzger, the Marines have created a web site for their " Community Integrated Master Plan." The site describes this planning process as evaluating "community-military development partnering options" because "[t]here are unmet facility needs and security requirements at Marine Barracks Washington and a potential to meet common community and military needs through the process" and that their goal is "to use a coordinated planning process to create a win-win in meeting the development needs of the local community and Marine Corps." Now that that's cleared up, you can go to the open house they're having on Jan. 27 from 5 to 8 pm in the North Hall of Eastern Market, to "assist the planning team in identifying issues, concerns, and potential opportunities for military-community development partnering." * One of many service reductions proposed by WMATA to help close their FY2010 budget gap is to shut down one of the two entrances to the Navy Yard metro station on weekends. (They don't say which one.) The public hearing on their various proposals is Jan. 27 at 5:30 pm. UPDATE: From Michael Perkins, in the comments, it would be the west entrance, at Half and M. I wonder if this would only be when there are no stadium events? * Via the Capitol Hill Chamber of Commerce's Twitter feed, there will apparently be one more Lower 8th Street visioning session, on February 22. After this final session, the group will forward its recommendations to the Office of Planning on what sort of development should be emphasized for these blocks south of the freeway. * In Sunday's Post, Dr. Gridlock took a look at the 11th Street Bridges project, telling drivers what to expect as the construction unfolds, and that the "new bridges will forge a link between Maryland, the District and Virginia that has been missing since the original highway plan for the District was abandoned decades ago. And it will create a new link between neighborhoods on both sides of the Anacostia while relieving them of some of the commuter traffic that spills onto local streets." * As part of the start of work on the bridges, a raze permit application has been filed to demolish the old red brick buildings between the current bridges that housed the Anacostia Community Boathouse, whose operations are now moving up-river to a temporary (maybe permanent) home at the Anacostia Marina. * A little time spent trolling through public records shows that within the past month a bunch of the liens brought against Opus East when they liquidated and stopped work on 1015 Half Street have been settled. No indications from the new owner ( Douglas Wilson Companies) as to when construction might restart, despite their statements back in October that it would be happening soon.
See All Current News Items
Michael Perkins says: (1/21/10 3:55 PM)
Docket says the proposed entrance to be closed is the west one.
link
Ray-N-Rockville says: (1/21/10 11:47 PM)
Closing the west entrance on weekends is absolutely foolish if they think it will save money. So all the people entering the stadium for events are now gonna be walkng up First Street after they leave Metro to walk to the stadium? The police are gonna have a pretty good size force in use to handle the crowds crossing M Street twice. This makes no sense from a logistical stand point and is going to cost the City thousands of dollars to implement on weekends there is any event at the stadium.
ScottKC says: (1/22/10 3:50 PM)
One would hope they would make an exception for Saturday events at the stadium. Kinds like how the Navy Yard/Capitol Hill Circulator runs on game day weekends, but otherwise not.
MJM says: (1/22/10 4:24 PM)
I seriously doubt they would keep the entrance closed during games - metro doesn't make sense a lot of times but they aren't that dumb.
Michael says: (1/25/10 10:06 AM)
it's only for non-event days... same as last year
Dan says: (1/25/10 3:40 PM)
Hey JD,
The blog documenting the boathouse's move upriver has changed names to reflect a broader scope. It's now called "Along the Anacostia - East of 11th Street." link There's more detail on the change in the blog's headline post.
Thanks for the shout-out! We're excited to see some exciting development along the river between the new bridges, the Anacostia National Park renovations, and (of course) the new boathouse.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Now updated for 2013!
JDLand.com's Official Unofficial Guide
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
Food Options, Now and Coming Soon
There's finally starting to be some new food options in the neighborhood. Click to see what's here, and what's coming.
What's New This Year A quick look at what's arrived or been announced since the end of the '12 baseball season.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012. Park Tavern restaurant opened April 8, 2013.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Arthur Capper/Carrollsburg Mixed-Income Redevelopment
Hope VI-funded redevelopment of old public housing complex. 1,700 rental & ownership units, including 700 public housing units.
Capper Mixed-Income Apartment Building (Square 769)
171-unit apartment building along L Street between Second and Third. No timeline.
Capper Mixed-Income Apartment Building (Squares 768/767)
Two mixed-income buildings with more than 450 units planned for the blocks between 2nd and 3rd and I and L. No timeline.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
US Department of Transportation Headquarters
11-acre site, 2 buildings, housing 7,000 Department of Transportation workers; construction begun early 2004, opened in April 2007.
Capitol Quarter
121 market-rate and 91 workforce-rate townhomes sold in phases; construction started June 2008, completed fall 2012. Project also includes 111 subsidized rental units and Section 8 ownership units.
11th Street Bridges
The three-year replacement of two new spans to replace the existing bridges across the Anacostia River began in 2009.
The Yards
44-acre mixed-use redevelopment of the old Southeast Federal Center. Expected to be completed in phases over 20 years.
The Yards
44-acre mixed-use redevelopment of the old Southeast Federal Center. Expected to be completed in phases over 20 years.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Yards Parcel N
325ish-unit residential building in planning stages on SW corner of 4th and Tingey. Could get underway in 2013.
Lumber Shed at the Yards Park
Transformation of old Lumber Shed in Yards Park into a retail space, including Osteria Morini. Expected completion fall 2013.
Foundry Lofts (The Yards)
Renovation of Historic Pattern Joiner Shop into 170 units, with ground-floor retail; rehab begun in 2008, first move-ins Nov. 2011.
Boilermaker Shops (The Yards)
Historic Boiler Maker's Shop being renovated into 46,000-sq-ft of retail space; first restaurants expected to open in early 2013.
Twelve12 (The Yards)
220ish-unit apartment building, with a ground-floor Harris Teeter and three-story Vida Fitness center/spa. Construction started Dec. 2011, to be completed early 2014.
Factory 202 (The Yards)
The old Broadside Mount Shop will be renovated as a 270-unit condo building. No current timeline.
Marine Bachelor Enlisted Quarters
Completed 2004.
600 M Street
Longtime site of Capper Seniors building until its demolition in November 2007, this site is now a temporary parking lot. Eventual plans call for a 500,000-sq-ft office project.
601 L Street
New apartment building planned for the northern portion of the old Capper Seniors lot along L Street. No timelime for the start of construction.
Maritime Plaza
Two office buildings, totaling 345,000 sq ft, completed in 2001 and 2003. Additional future plans could include 350,000 sq ft additional office space and a hotel (no timeline).
Community Center
A new building replacing the old center, with day care, a rec center, gym, computer lab, and more. Could start in 2014.
Capper Seniors #1
New 160-unit building for low-income seniors; construction begun March 2005, completed December 2006.
400 M Street
New 138-unit building with units for both low-income seniors and workforce-level earners; construction begun December 2005, opened November 2007. Wrapped around existing 410 M seniors building.
Van Ness Elementary School
DC Public School, closed in 2006, but with the possibility of reopening for the 2015 school year.
250 M Street
Proposed 190,000 sq ft office building by William C. Smith with ground-floor retail; no timeline. Part of Capper/Carrollsburg PUD.
225 Virginia/200 I
Once a printing plant for the Star and the Post, the building was rehabbed by the DC Government and Stonebridge Carras to house four DC agencies. Reopened in fall 2012.
Park Chelsea 880 New Jersey
430-unit apartment building called Park Chelsea, 1st phase of four building, 1 million-sq-ft residential project by William C. Smith. Started fall 2012, delivery expected late 2014.
Trash Transfer Station (Capper)
Longtime home to trash and public works operations, this will eventually be a 400-unit mixed-income apartment building as part of the Capper/Carrollsburg redevelopment. No timeline.
Jefferson and Axiom Apts. 70/100 I Street
Two buildings totalling 700 residential units; construction begun Sept. 2006, first move-ins began summer 2008. Developed by JPI, sold in 2012.
909 New Jersey
237-unit residential tower with 6,000 sq ft retail on the site of the old Nexus Gold Club; construction underway June 2007, delivered 2009. Developed by JPI, sold in 2012.
Congressional Square Square 696
Block purchased for $69.4 million in April 2007; 825,000-sq-ft office/retail project planned in three phases. No recent announcement on start date.
909 Half Street
Planned 400-unit residential building by Ruben Cos. No timeline.
1015 Half Street
The old Nation nightclub site, now a 411,000-sq-ft office building with ground floor detail; begun January 2008 by Opus East, halted July 2009, completed by Douglas Wilson Cos. spring 2011.
Velocity Condos 1025 1st Street
200-unit condo building developed by Cohen Companies. Construction begun July 2007, delivered late 2009. Justin's Cafe in ground floor.
Toll Brothers Site
Toll Brothers purchased lot just north of Velocity in 2012 for 250-unit residential building. No timeline.
Toll Brothers Site 2
Second site purchased by Toll Brothers in 2012 for a residential building. No details, no timeline.
Courtyard by Marriott 140 L Street
200-room Courtyard by Marriott Hotel, completed in 2006.
Capitol Hill Tower 1000 New Jersey Ave.
340-unit residential coop tower, completed in 2006.
1111 New Jersey Avenue
Plans by Donohoe Companies for 200,000 sq ft office building could switch to residential. No timeline. Site footprint to include St. Matthew's Baptist Church.
Onyx on First 1100 1st Street
14-story, 260-unit apartment building by Faison/Canyon-Johnson. construction begun Sept. 2006, first move-ins started October 2009. Sold to ERP in 2012.
100 M Street
240,000-sq-ft office building, with ground-floor retail; construction begun Sept. 2006, delivery late 2008. Developed by Opus East. Retail tenants: Gordon Biersch (opened April 2013), SunTrust.
20 M Street
190,000-sq-ft office building from Lerner Enterprises, construction begun Aug. 2005, completed spring 2007. Retail tenant: Wells Fargo.
SC1100 1100 South Capitol Street
A 350,000-sq-ft office by Ruben Cos. project planned for 1100 South Capitol Street. No timeline for the start of construction.
1000 South Capitol Street
Proposed 320,000-sq-ft office building by Lerner Enterprises; no timeline. A surface parking lot was built on this site in early 2008.
Akridge Half Street
Old WMATA bus garage bought by Akridge in Aug. 2008 for $46.5 million. Plans for 700,000-sq-ft of mixed use; currently home to Fairgrounds.
Monument Half Street Residential/Hotel
The southern half of Monument's block on Half Street has long had plans for a hotel and two residential buildings. No timeline.
55 M Street
275,000-sq-ft office building on top of Navy Yard Metro west station entrance; construction begun in early 2007, completed spring 2009. Retail tenant: Bank of America.
Monument South Capitol Residential
Monument Realty may be starting to move forward on plans for a 185-unit residential building on the northeast corner of South Capitol and N, but no timeline is announced.
One M Street
328,000-sq-ft office building proposed by Monument Realty for southeast corner of South Capitol and M. No timeline.
Square 701
Planning started by Grosvenor and Skanska in 2012 for separate office/hotel/residential buildings with ground-floor retail. No timeline.
DC Water
Still a functioning water-treatment facility, and includes the historically designated Main Pumping Station building.
Diamond Teague Park and Piers
39,000-sq-ft public plaza and water taxi dock on the banks of the Anacostia, next to the old pumphouse occupied by the Earth Conservation Corps; first phase completed 2009.
RiverFront on the Anacostia (Florida Rock)
5.8-acre site, 1.1 million sq ft project, 4 buildings: 2 residential, 1 office, 1 hotel, retail. First phase could begin in 2013.
RiverFront on the Anacostia (Florida Rock)
5.8-acre site, 1.1 million sq ft project, 4 buildings: 2 residential, 1 office, 1 hotel, retail. First phase could begin in 2013.
WMATA Navy Yard Chiller Site
14,100-sq-ft lot, WMATA's development talks with Donatelli Development called off in Summer, 2010.
National Community Church Site
A series of small lots bought by the National Community Church in 2010 and 2011 with the intent of building a combination coffee-house/performance space/offices. No timeline.
New South Capitol Street Bridge
Planning is underway to replace the current Frederick Douglass Bridge. No timeline for construction.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Designs are pending to expand the 106-year-old tunnel to allow for a second track and double-height cars.
Rail and Bus Times
Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times
Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
50 M Street
130,000-sq-ft office building on the site of the old Sunoco station. In development by Monument Realty, no timeline for construction.
Blue Castle
Old trolley garage/car barn at 770 M Street, now home to charter schools. Eventually to be renovated as a retail space.
Washington Capital Area Spay and Neuter Clinic
Opened in October 2007, provides low-cost spay and neuter services to clinics and shelters around the metro area.
900 M Street
900 M Street, an old Hudson auto dealer, later a dialysis unit, renovated in 2008 for retail space. Domino's and Wagtime current occupants.
300 M Street
300,000-sq-ft office building, completed 2001. Sizzlin' Express deli on ground floor.
80 M Street
275,000-sq-ft office building on the site of the old Tracks nightclub. Completed 2001.
Federal Gateway 1100 New Jersey Avenue
297,000-sq-ft office building, completed 2004. Ground-floor retail includes Five Guys, Subway, CVS, and Capital One Bank.
50 M Street
130,000-sq-ft office building on the site of the old Sunoco station. In development by Monument Realty, no timeline for construction.
Southeast Blvd.
A 20-month project to convert the eastern part of the SE Freeway to a boulevard that intersects at-grade with 11th Street. Expected completion in 2015.
My post on the council's restoration of funds to get DC Water (somewhat) moved out and expand the Yards: link (4:23 PM 5/22) RT @CharlesAllenDC: Council budget vote restored funding for Yards/DCWater project; keeps it on schedule. It's a big project for the neighb… (3:05 PM 5/22) A little too DC: an after-work reception in the front yard 3 doors down. Full bar, name tags, jacket & ties, 20 or so people. #caphill (7:20 PM 5/21) RT @timcraigpost: Phil Mendelson plans to restore $5 million in budget for DC Water to plan its relocation from Yards Park, making way for … (4:47 PM 5/21)
|
|
Recent Registered Reader Comments:
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
|
1100 B/O HALF ST SE
|
| THEFT
/
| 05/17/13
|
M ST SE AND 11TH ST SE
|
| THEFT
/
| 05/15/13
|
300 B/O VIRGINIA AVE SE
|
| BURGLARY
/
| 05/13/13
|
L ST SE AND 5TH ST SE
|
| MOTOR VEHICLE THEFT
/
| 05/08/13
|
900 B/O 5TH ST SE
|
| MOTOR VEHICLE THEFT
/
| 05/03/13
|
1000 B/O 3RD PLACE SE
|
| MOTOR VEHICLE THEFT
/
| 05/01/13
|
1500 B/O SOUTH CAPITOL ST
|
| MOTOR VEHICLE THEFT
/
| 05/01/13
|
1000 B/O 5TH ST SE
|
| THEFT
/
| 05/01/13
|
1500 B/O SOUTH CAPITOL ST
|
| MOTOR VEHICLE THEFT
/
| 05/01/13
|
900 B/O 4TH ST SE
|
| MOTOR VEHICLE THEFT
/
| 04/29/13
|
UNIT B/O M ST SE
|
| THEFT
/
| 04/27/13
|
700 B/O L ST SE
|
| THEFT
/
| 04/26/13
|
250 B/O I ST SE
|
| THEFT
/
| 04/22/13
|
1000 B/O 7TH ST SE
|
| MOTOR VEHICLE THEFT
/
| 04/22/13
|
|
|
Active Public Space Permits
| Archive
|
|
|
1011 1ST ST SE
|
|
COLIN CLARK Pending
excavation; new
| 03/03/14 to 05/01/14
|
|
815 4TH ST SE
|
|
Comcast Cable Assigned
excavation
| 05/06/13 to 07/05/13
|
|
1101 4TH ST SE
|
|
Comcast Cable Assigned
excavation
| 05/06/13 to 07/05/13
|
|
1200 - 1299 BLOCK HALF ST SE
|
|
Washington Nationals Issued
streetfixture; new
| 08/24/12 to 08/15/13
|
|
200 - 299 BLOCK TINGEY ST SE
|
|
Northeast Remsco Construction Incorporated Pending
paving; excavation; new
| 01/01/13 to 12/31/13
|
|
200 - 299 BLOCK VIRGINIA AVE SE
|
|
Phil Sheridan Issued
excavation; new
| 05/20/13 to 07/18/13
|
|
909 HALF ST SE
|
|
Ruben Companies Ruben Companies Pending Document
excavation
| 03/01/13 to 09/01/13
|
|
23 I ST SE
|
|
23 I LLC c/o Ruben Companies Pending
paving; new
| 11/30/12 to 11/29/13
|
|
200 I ST SE
|
|
Todd Stone Pending
streetfixture; new
| 11/21/12 to 11/22/13
|
|
17 M ST SE
|
|
1015 HALF STREET SE LLC Pending
excavation; new
| 07/23/12 to 07/22/13
|
|
100 M ST SE
|
|
Gordon Biersch Restaurant And Brewery Pending
new
| 01/07/13 to 06/30/13
|
|
|
|
WASHINGTON GAS Issued
excavation; new
| 05/06/13 to 07/04/13
|
|
|
|
WASHINGTON GAS Assigned
excavation
| 04/23/13 to 04/22/14
|
|
202 M ST SE
|
|
canal park business assoc Issued
paving; new
| 04/29/13 to 05/31/13
|
|
401 M ST SE
|
|
cris FLACK Issued
excavation; new
| 04/22/13 to 06/20/13
|
|
770 M ST SE
|
|
Wash Gas & Light Co. Pending
excavation; new
| 12/10/12 to 05/31/13
|
|
900 M ST SE
|
|
Corman Construction Issued
excavation; new
| 09/11/12 to 09/10/13
|
|
922 M ST SE
|
|
Wash Gas & Light Co. Issued
excavation; new
| 04/30/13 to 06/28/13
|
|
1201 M ST SE
|
|
Michael Manoski Pending Document
excavation
| 05/06/13 to 05/05/14
|
|
1333 M ST SE
|
|
WASHINGTON GAS Assigned
excavation
| 05/01/13 to 04/30/14
|
|
1500 M ST SE
|
|
DC Water Pending
excavation; new
| 02/15/13 to 07/30/13
|
|
125 O ST SE
|
|
TRAYLOR/SLANSKA/JAY DEE JOINT VENTURE(DAMIAN RUPPERT) Issued
paving; streetfixture; new
| 12/24/12 to 12/23/13
|
|
300 TINGEY ST SE
|
|
Northeast Remsco Construction Incorporated Pending
paving; excavation; new
| 12/14/12 to 12/13/13
|
|
301 TINGEY ST SE
|
|
Potbelly Sandwich Works LLC Issued
new
| 03/21/12 to 11/27/14
|
|
401 TINGEY ST SE
|
|
Northeast Remsco Construction Incorporated Pending
new
| 02/18/13 to 08/31/13
|
|
601 VIRGINIA AVE SE
|
|
Wash Gas & Light Co. Issued
excavation; new
| 04/30/13 to 06/28/13
|
|
301 WATER ST SE
|
|
Wash Gas & Light Co. Assigned
excavation
| 04/19/13 to 11/30/13
|
|
|
Recent Issued Building Permits
| Archive
|
|
|
1263 1ST ST SE
|
|
05/10/13
CAPITAL RIVERFRONT HOTEL LLC / CAPITAL RIVERFRONT HOTEL LLC; WESTON SOLUTIONS INC.
INSTALL FIVE MONITORING WELLS ON ADJOINING PARCELS ON SQUARE 701 LOT 818 821 825 826 827 TO EVALUATE SOIL AND GROUNDWATER ENVIRONMENTAL CONDITION PRIOR TO SITE DEVELOPMENT.
SITE IS CURRENTLY VACANT AND USED FOR PARKING.
|
|
1013 4TH ST SE
|
|
05/13/13
EVA WALTER / RALPH E JACKSON
|
|
1212 4TH ST SE
|
|
05/10/13
FOREST CITY / FVI 2020
REVISION TO FOUNDATION TO GRADE REF: PERMIT FD1109003
|
|
1201 HALF ST SE
|
|
05/03/13
LIVING SOCIAL'S BEER FEST / LIVING SOCIAL'S BEER FEST; RYLAND GREENHOUSE
SPECIAL EVENT LIVING SOCIAL'S BEER FEST 60 10X10 TENTS
1 30X50 TENT
|
|
70 I ST SE
|
|
|
|
80 M ST SE
|
|
05/10/13
WELLS REIT II 80 M STREET LLC / SCOTT BROADBENT; WELLS REIT II 80 M STREET LLC; SCOTT BROADBENT
|
|
|
|
05/15/13
WELLS RELT II 80 M STREET LLC WELLS RELT II 80 M STREET LLC / ASHLEY MANGAN; WELLS RELT II 8 WELLS RELT II 80 M STREET LLC; DAVID RAINE
|
|
300 M ST SE
|
|
05/15/13
FEDERAL CENTER LP / MARK A. PELUSO
|
|
100 M ST SE
|
|
05/17/13
KEN MERZELLIO / THOMAS HUMMEL; KEN MERZELLIO; THOMAS HUMMEL
|
|
1201 M ST SE
|
|
05/08/13
CARLTON RAY / MICHAEL MANOSKI
PERFORM TEMPORARY LANE CLOSURES.
|
|
|
|
05/08/13
WASHINGTON GAS LIGHT CO. WASHINGTON GAS LIGHT CO. / THOMAS NIEMANN; WASHINGTON GAS WASHINGTON GAS LIGHT CO.; JOE ISAAC
|
|
|
|
05/15/13
WASHINGTON GAS LIGHT CO / JEFFREY KNIGHT; WASHINGTON GAS LIGHT CO; JOHN WEEKS
|
|
880 NEW JERSEY AVE SE
|
|
05/03/13
880 NEW JERSEY AVENUE LLC / JOHN H THOMSON
|
|
|
|
05/03/13
880 NEW JERSEY AVENUE LLC / JOHN H THOMSON
|
|
|
|
05/14/13
880 NEW JERSEY AVENUE LLC / LEONARD J. MCNULTY
|
|
|
|
05/14/13
880 NEW JERSEY AVENUE LLC / ALBERT J. PEARCE
|
|
1500 SOUTH CAPITOL ST SE
|
|
05/10/13
DISTRICT OF COLUMBIA / GUARDIAN FIRE PROTECTION SERVICES
INSTALL ANSUL R-102 1.5-GALLON COMMERCIAL KITCHEN HOOD FIRE SUPPRESSION SYSTEM TO PROTECT NEW SMOKER OVEN IN CLUB LEVEL KITCHEN - WASHINGTON NATIONALS STADIUM
|
|
300 TINGEY ST SE
|
|
05/16/13
FC BOILERMAKER LLC /
|
|
101 TINGEY ST SE
|
|
05/17/13
HILL COUNTRY BBQ MARKET / ALEX CRAWFORD
OUTDOOR VENUE WITH FENCE AND TENTS FOR FOOD AND BEVERAGE SALES WITH LIVE MUSIC
|
|
300 TINGEY ST SE
|
|
05/10/13
FOREST CITY WASHINGTON / JOE SPINELLI RESTAURANT CONSULTANTS
INTERIOR ALTERATION OF AN EXISTING BUILDING OF A TOTAL GFA = 2750 SQ.FT. ON 1ST FLOOR TO BE A NEW T / L 84-SEAT & 94 OCCUPANCY LOAD RESTAURANT. WORK TO INCLUDE NEW WALLS CEILINGS FLOORS AND LIGHTING. NEW HVAC HOOD SYSTEM ELECTRICAL MECHANICAL PLUMBING.
|
|
|
|
05/10/13
FC BOILERMAKER LLC /
|
|
|
|
05/15/13
FC BOILERMAKER LLC / DOMINIC E TOTARO
|
|
|
|
05/15/13
FC BOILERMAKER LLC / DOMINIC E TOTARO
|
|
301 TINGEY ST SE
|
|
05/14/13
SEFC 160 LLC / JEFFREY KNIGHT; SEFC 160 LLC; JOHN WEEKS
|
|
301 WATER ST SE
|
|
05/07/13
FC LUMBER SHED LLC / DENNIS R. WOODE
|
|
|
|
05/07/13
FOREST CITY / FVI 2020
INSTILLATION OF PREFAB MECHANICAL STORAGE PLATFORM OF APPROX 622 SQ FT AREA STRUCTURE OF STEEL FRAMING WITH COMPOSITE DECK WITH TUBE STEEL COLUMNS ON FOOTINGS
|
|
|
|
05/08/13
TOUR DE FAT / PAUL GRUBER
SPECIAL EVENT TOUR DE FAT 1 36X24 STAGE
2 20X20 TENTS
3 10X10 TENTS
|
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
|
| 1263 1ST ST SE
|
03/14/13
$ 5,435,680
CAPITAL RIVERFRONT HOTEL LLC
|
|
| 0084 N ST SE
|
03/14/13
$ 5,435,680
CAPITAL RIVERFRONT HOTEL LLC
|
|
| 0086 N ST SE
|
03/14/13
$ 5,435,680
CAPITAL RIVERFRONT HOTEL LLC
|
|
| 0086 N ST SE
|
03/14/13
$ 5,435,680
CAPITAL RIVERFRONT HOTEL LLC
|
|
| 1265 1ST ST
|
03/14/13
$ 5,435,680
CAPITAL RIVERFRONT HOTEL LLC
|
|
| N ST SE
|
03/05/13
$ 7,525,000
MR BALLPARK 2 LLC LEHMAN BROS HOLDINGS INC FL 39
|
|
| N ST SE
|
03/05/13
$ 7,525,000
MR BALLPARK 2 LLC LEHMAN BROS HOLDINGS INC FL 39
|
|
| N ST SE
|
03/05/13
$ 7,525,000
MR BALLPARK 2 LLC LEHMAN BROS HOLDINGS INC FL 39
|
|
| 1244 SOUTH CAPITOL ST SE
|
03/05/13
$ 7,525,000
MR BALLPARK 2 LLC LEHMAN BROS HOLDINGS INC FL 39
|
|
| 1236 SOUTH CAPITOL ST SE
|
03/05/13
$ 7,525,000
MR BALLPARK 2 LLC LEHMAN BROS HOLDINGS INC FL 39
|
|
| N ST SE
|
03/05/13
$ 7,525,000
MR BALLPARK 2 LLC LEHMAN BROS HOLDINGS INC FL 39
|
|
| 0050 M ST
|
03/05/13
$ 5,125,000
MR BALLPARK 6 LLC LEHMAN BROTHERS HOLDINGS INC
|
|
Top of Page | Contact JD | Advertise on JDLand
Near Southeast RSS Feed
© Copyright 2013 JD.
All photos © Copyright JD - See information on photo uses, licensing and purchasing.
|
| |