Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
February 10, 2007
August 29, 2015 
1st at I, Looking North-Northeast (see more)

Tonight ANC 6D gave its support in two separate votes to restaurateur Justin Ross's liquor license application for his new "Justin's Cafe" sandwich/salad/pizza place in the ground floor of the Velocity condo building at First and L streets, SE. There was little discussion, other than some concerns by commissioner Roger Moffatt about voting to support the full liquor license before the hearing is even "placarded," i.e., posted on the restaurant site, because he felt that this might prevent residents' concerns from being part of the ANC's decision (though, of course, the ABRA liquor license hearing process specifically allows for public comment). Two residents in the audience spoke strongly in favor of the proposed plans, and, in the end, the votes were 6-0-1 for a temporary "stipulated" license and 6-1 for the full license (Moffatt voting present/against on the two motions).
There's still no date set for the license hearing (Justin filed his application on Dec. 30), but he indicated that things should be moving pretty quickly in terms of getting the restaurant opened, and the stipulated license will allow him to serve alcohol until the full license is voted on.
Other Near Southeast-related tidbits:
* The Marines are going to be hosting an open house on January 27 from 5 to 8 pm at Eastern Market's north hall--they are formulating a new master plan for all of their space needs, and are looking to "partner" with residents, developments, government agencies, or any organization that can provide the space they're looking for. The open house seems to be the first step in "reaching out," though it all seemed a bit murky, and perhaps will be better explained when announcements for the open house are released. (Though "lower Eighth Street" was mentioned.)
* The commission also elected its offers for 2010, with Ron McBee being named chair. Vice chair Robert Siegel, secretary David Sobelsohn, and treasurer Jane Jorgensen retained their posts.
* This was the first time in all the ANC 6D meetings I've attended (starting in probably 2004) that I actually stayed until the very end (it lasted a mere three hours). Whether this is something to celebrate is another issue, especially on a night like this one where the heat at St. Augustine's seemed particularly, um, nonexistent. They did announce that soon the ANC and the Southwest Neighborhood Association will be moving to new digs at Waterfront (the new development about to open at the old Waterside Mall site at Fourth and M, SW). They will also have a public meeting space that presumably will have both sufficient HVAC offerings and decent acoustics, so that I will actually be able to *hear* what's going on.
Comments (3)
   
 
 More About Justin's Cafe

JDLand.com Home

Comments

Capt Hill says: (1/12/10 8:34 AM)
JD - any news (or thoughts?) on the Marine's plans for lower 8th? Personally, I would like to see them acquire more land and expand in the area.


JD says: (1/12/10 2:35 PM)
I imagine we'll find out much more at this open house at Eastern Market on the 27th; they're clearly looking for more space. As for whether the neighbors (and the neighborhood in general) want the tight security of the Barracks to be expanded into a larger perimeter, that remains to be seen.


Michael says: (1/12/10 3:27 PM)
Apparently he wasn't too concerned about resident's inputs since he didn't outreach to all 13 of us. I'm in favor of anything right now.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
JES on New Douglass Bridge: Maybe they could prioritize the circles and try to have them done(ish) before? I...
JES on New Hampton Inn: Loving the fake stock photos on the Hampton website. Seriously, who the hell smi...
JD on New Douglass Bridge: My assumption is that construction won't start until 2017, and probably take abo...
JES on New Douglass Bridge: I dunno how long it takes to build a bridge, but I'm assuming it won't be done i...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O POTOMAC AVE SE   THEFT F/AUTO
 08/17/15
500 B/O L ST SE   THEFT F/AUTO
 08/17/15
UNIT B/O K ST SE   THEFT F/AUTO
 08/16/15
500 B/O L ST SE   THEFT
 08/08/15
UNIT B/O I ST SE   BURGLARY
 08/07/15
300 B/O WATER ST SE   THEFT
 08/05/15
UNIT B/O I ST SE   THEFT
 08/04/15
50 B/O M ST SE   THEFT
 08/04/15
400 B/O M ST SE   THEFT
 08/03/15

Recent Issued Building Permits Archive  
1277 1ST ST SE   
08/11/15 
BALLPARK RESIDENTIAL LLC / RICHARD V CAREY
P1508164 / SUPPLEMENTAL
   
08/21/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / CLINT HOLMES; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E20139177 / SUPPLEMENTAL
1000 5TH ST SE   
08/18/15 
UNITED STATES OF AMERICA / JOSEPH M MAGNOLIA
P1508371 / SUPPLEMENTAL
1150 5TH ST SE   
08/11/15 
PEPCO PEPCO
AH1500668 / CONSTRUCTION
INSTALLATION OF CABLE AND METERS
1220 12TH ST SE   
08/13/15 
WASHINGTON GAS LIGHT CO / JOHN GIUSEPPE-RAMCO
B1509350 / CONSTRUCTION
RENOVATIONS TO EXISTING 3RD FLOOR OFFICE SPACE EXELIS AS SHOWN ON THE ATTACHED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. INTERIOR WORK ONLY. NO CHANGE IN US. NO STRUCT. WORK.
909 HALF ST SE   
08/13/15 
BAKER DC LLC / CHRISTINE LONG
AH1500677 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 11:00PM FRIDAY THRU 11:00PM SATURDAY
   
08/18/15 
BAKER DC
AH1500686 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM WEDNESDAY THRU 11:59PM THURSDAY. 1-49 BLOCK OF K ST SE
   
08/21/15 
BAKER DC / CHRISTINE LONG
AH1500695 / CONSTRUCTION
AN AFTER HOURS PERMIT IS FROM 12:01AM THRU 11:59PM FROM 08 / 25 / 2015 TO 08 / 29 / 2015
1015 HALF ST SE   
08/13/15 
HALF ST SE LLC / GREGORY E LIGON
E1508399 / SUPPLEMENTAL
   
08/17/15 
HALF ST SE LLC / ANTHONY G SAMBURG
E1508502 / SUPPLEMENTAL
   
08/20/15 
WSP PARSONS BRINCKERHOFF / STEVE AUD; WSP PARSONS BRINCKERHOFF; STEVE AUD
E95740122 / SUPPLEMENTAL
1220 HALF ST SE   
08/12/15 
BUFFALO WILD WINGS / NICOLE WHITE; BUFFALO WILD WINGS; GREG CONCANNON
AR49901357 / SUPPLEMENTAL
   
08/13/15 
BUFFALO WILD WINGS / BELA X-PEDITERS PLUS INC.
AH1500681 / CONSTRUCTION
WORK AFTER HOURS 7PM-7AM. 8 / 13 / 2015 TO 9 / 13 / 2015
601 L ST SE   
08/17/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KRISSY GER LISA LJ PERMIT
B1510955 / CONSTRUCTION
REVISION TO B1101058 MINOR GRADING REVISION
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502944 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) HYDRO / STEEL / CENTRALLY / PASSENGER TO PROVIDE ACCESS BETWEEN G AND G2 FLOORS AS PER PLANS.
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502945 / SHOP DRAWING
TYPE OF ELEVATOR: TWO (2) TRACTION / STEEL / CENTRALLY / PASSENGER (5TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502970 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502971 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
80 M ST SE   
08/24/15 
COLUMBIA PROPERTY TRUST / KRISTINA DELGADO
B1510944 / CONSTRUCTION
PARTIAL 4TH FLOOR RENOVATIONS INCLUDING MECHANICAL PLUMBING ELECTRICAL AS WELL AS FURNITURE INSTALLATION.
20 M ST SE   
08/19/15 
SOUTHEAST REALTY LLC / ELEANOR FARID; SOUTHEAST REALTY LLC; RODNEY CANNON
E69278004 / SUPPLEMENTAL
50 M ST SE   
08/11/15 
MILLER?LONG
TC1500036 / CONSTRUCTION
TOWER CRANE FOR JOB SITE USE
   
08/13/15 
MILLER?LONG MILLER?LONG
AH1500674 / CONSTRUCTION
AFTERHOURS TO PUT UP TOWERCRANE WITH 200 TON MOBILE CRANE SATURDAY 8 / 15 / 2015 AND 8 / 16 / 2015 FROM 5AM TO 9PM
   
08/14/15 
KCG 50 M LLC / JOSEPH E RICHARDS
E1508432 / SUPPLEMENTAL
   
08/21/15 
KCG 50 M LLC / DANIEL R. RUDE
P1508460 / SUPPLEMENTAL
55 M ST SE   
08/19/15 
DOUG OLSON / DOUG OLSON; NONE
SG1500414 / CONSTRUCTION
NEW SIGNS INSTALLATION AS PER PLANS
1500 M ST SE   
08/21/15 
WASHINGTON YACHT CLUB / ZACHARY ZILL
SB1500438 / CONSTRUCTION
SOIL BORING FOR COMPENSATION GROUTING ALONG THE ALIGNMENT OF DC WATER'S CLEAN RIVERS DIV H - ANACOSTIA RIVER TUNNEL. FORTEEN BORINGS TO MAX DEPTH OF 70 FEET BGS 2 INCH DIAMETER GROUT TUBES INSIDE 5.5 INCH DIA CASINGS. DUPLEX ROTARY DRILLING METHOD. REF. PERMIT SB1400400.
1100 NEW JERSEY AVE SE   
08/11/15 
CHRISTOPHER CONDON
PC69159304 / POST CARD
INTERIOR DEMOLITION OF NON-BEARING ELEMENTS IN A SPACE UP TO 5 000 SQUARE FEET (464.5 SQUARE METERS)
1500 SOUTH CAPITOL ST SE   
08/14/15 
P1508259 / SUPPLEMENTAL
301 WATER ST SE   
08/12/15 
LUMBER SHED LIC / ROBERT WATTS; LUMBER SHED LIC; ROBERT WATTS
E99575145 / SUPPLEMENTAL
355 WATER ST SE   
08/14/15 
TIAN LUU / TIAN LUU; TIAN LUU; JAMES BORROR
E95497821 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.