Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
December 7, 2008
July 12, 2014
4th at Water St., Looking West-Southwest (see more)

The Capitol Riverfront Business Improvement District held its annual meeting and luncheon on Thursday, on the ninth floor of 55 M Street. Stan Kasten of the Nationals opened the festivities with some brief but energetic remarks about how excited the Nationals are about the neighborhood's continuing development. He was followed by Tommy Wells, who is equally enthusastic about the neighborhood as a prime example of a "liveable, walkable community," saying that people are increasingly choosing "five-minute living." But, he added that if this area ends up looking like every other neighborhood, "then we've failed."
After making presentations and awards to the BID's Clean and Safe team members, BID executive director Michael Stevens presented his State of the Capitol Riverfront report, chock full of statistics, including my perennial favorite, the number of bags of trash collected during 2009 (7,526!). The BID estimates there are now about 2,500 residents in the area, with another 500 expected to arrive in 2010. He also spent some time comparing the size and scope of the plans for "the Front" to other waterfront redevelopment projects such as Battery Park City in New York and Mission Bay in San Francisco, and of course detailing the many ways the BID works to publicize and advocate for the neighborhood.
Stevens was followed by Christopher Leinberger of the Brookings Institution, who discussed "The Structural Shift in Building." This area and DC as a whole, he said, are the model for the sort of development that cities want to emulate going forward, as he described the pendulum swing from the suburban model of the second half of the 20th century to the new "walkable urbanism," being driven mainly by the Millennial generation, empty-nested retirees, and the growth in the percentage of child-free households.
Leinberger's presentation slides are definitely worth paging through, and folks who are big fans of public transportation will especially appreciate his feeling that the slogan going forward should be "The Green Line is the New Red Line," since the biggest opportunities for development around transportation hubs exist near those stations, and that the BID should actually consider expanding its consulting and other offerings to the smaller emerging neighborhoods along the Green Line that need those types of services. (Perhaps this is what Michael Stevens was alluding to in his report, where a Green Line Research Project was mentioned. And, by the way, next year will mark the 20-year anniversary of the opening of the Navy Yard metro station.)
Finally, BID chairman Eric Siegel announced that the BID is planning an environmental summit in May 2010 (perhaps at Nationals Park), to focus on the cleanup of the Anacostia River and other environmental issues with the many public and private stakeholders along the river.
Comments (0)
 
 More About Capitol Riverfront BID

JDLand.com Home

Comments

G says: (12/18/09 4:59 PM)
appreciate this update!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Chococar on Tidbits: I see the obstructionists are still trying to block the CSX tunnel. The narrow o...
Edna on Tidbits: Well said, JD, on Jair Lynch. What a bunch of developer nonsense-talk!
JES on Tidbits: Well, last time, we made a bit of a hasty exit..... who knows how the latter rou...
JD on Tidbits: I think that's how it ended up working out last time, that despite all the sturm...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O 10TH ST SE   THEFT F/AUTO /  09/08/14
400 B/O K ST SE   THEFT F/AUTO /  09/08/14
1000 B/O 4TH ST SE   THEFT F/AUTO /  09/05/14
300 B/O M ST SE   ROBBERY /  09/03/14
900 B/O 1ST ST SE   THEFT F/AUTO /  09/03/14
1000 B/O 1ST ST SE   THEFT /  09/03/14
1200 B/O 4TH ST SE   THEFT F/AUTO /  09/02/14
200 B/O M ST SE   THEFT /  09/02/14
300 B/O M ST SE   THEFT /  09/02/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/01/14
300 B/O K ST SE   THEFT F/AUTO /  08/31/14
1100 B/O 10TH ST SE   THEFT F/AUTO /  08/31/14
300 B/O I ST SE   MOTOR VEHICLE THEFT /  08/30/14
1400 B/O 1ST ST SE   THEFT /  08/29/14
300 B/O WATER ST SE   MOTOR VEHICLE THEFT /  08/27/14
3RD ST SE AND WATER ST SE   THEFT F/AUTO /  08/26/14
100 B/O K ST SE   THEFT F/AUTO /  08/25/14
400 B/O M ST SE   MOTOR VEHICLE THEFT /  08/23/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1011 1ST ST SE   
09/03/14 
TOLL DC LP / MILLENNIUM POOL
SP1400019 / CONSTRUCTION
INSTALL STAINLESS STEEL POOL ON ROOFTOP OF THE 13-FLOOR APARTMENT BUILDING.
1200 1ST ST SE   
09/05/14 
UNITED STATES OF AMERICA / FVI2020
EX1400033 / CONSTRUCTION
EXCAVATION SITE GRADING ONLY
1020 3RD ST SE   
09/03/14 
MAYIAK LLC / SMK AND ASSOCIATES LLC
B1411577 / CONSTRUCTION
REPAIR OR REPLACE IN KIND KITCHEN CABINETS TILE ON KITCHEN FLOORS. REPLACE FLOORS THROUGHOUT REPLACE BATHROOM VANITY TOILET TUB . PAINT EXTERIOR WINDOW LEDGES AND FRONT PORCH
1212 4TH ST SE   
09/09/14 
FC 1212 LLC /
FB1400131 / SUPPLEMENTAL
   
09/09/14 
FC 1212 LLC / WENDELL D. NIXON
M1403160 / SUPPLEMENTAL
1331 4TH ST SE   
09/09/14 
UNITED STATES OF AMERICA /
P1407907 / SUPPLEMENTAL
1103 9TH ST SE   
09/16/14 
ICP PARTNERS POTOMAC 810 LLC / FRANKLIN T GAINES
P1408621 / SUPPLEMENTAL
1220 12TH ST SE   
09/18/14 
WASHINGTON GAS LIGHT CO / GREGORY E LIGON
E1409179 / SUPPLEMENTAL
   
09/19/14 
WASHINGTON GAS LIGHT CO / JAMES C. GYURAS
E1409204 / SUPPLEMENTAL
   
09/19/14 
WASHINGTON GAS LIGHT CO / JAMES C. GYURAS
E1409203 / SUPPLEMENTAL
1200 13TH ST SE   
09/03/14 
WASHINGTON GAS LIGHT COMPANY / CHRIS WILLETT URS CORPORATION
SB1400412 / CONSTRUCTION
DCCR PROPOSES TO DRILL TWO GEOTECHNICAL BOARINGS MS-MW-02D & MS-MW-02S LOCATED AT 1200 13TH ST SE. BOTH BOARINGS WILL BE 6 INCHES IN DIAMETER 02D WILL BE 36 FEET DEEP WIOTH A 10 FOOT SCREENED INTERVAL STARTING AT 25 FEET DEEP AND 02S WILL BE 23 FEET DEEP WITH A 10 FOOT SCREENED INTERVAL STARTING AT 13 FEET DEEP. BOTH WILL BE DIRLLED WITH HOLLOW STEM AUGER. NO PERMANENT CASING WILL BE INSTALLED. SE...
   
09/03/14 
WASHINGTON GAS LIGHT COMPANY / CHRIS WILLETT URS CORPORATION
SB1400413 / CONSTRUCTION
DCCR PROPOSES TO DRILL ONE GEOTECHNICAL BORING MS-MW 01 LOCATED IN 1200 13TH ST SE. THE BORING WILL BE 6 INCHES IN DIAMETER AND 200 FEET BGS WITH A SCREENED INTERVAL FROM 135 TO 195 FEET BGS DRILLED BY MUD ROTARY. PERMANENT STELL CASING WILL INSTALLED AND BE SOCKETED 10 FEET INTO P / A AND GROUTED BEFORE DRILLING INTO THE PTX. MSDS FOR DRILLING MUD ADDITIVES ATTACHED. SEE IDW MANAGEMENT PLAN AND A...
1015 HALF ST SE   
09/04/14 
HALF ST SE LLC /
P1408319 / SUPPLEMENTAL
601 L ST SE   
09/02/14 
V ? V CONSTRUCTION / STEPHANIE DELCA TRAFFIC ENGINEERING SERVCIES LLC
TC1400023 / CONSTRUCTION
TO ERECT TOWER CRANE AS PER PLANS.
   
09/16/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / EDUARDO L. LOPEZ
E1409105 / SUPPLEMENTAL
   
09/18/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / RICHARD V CAREY
P1408678 / SUPPLEMENTAL
20 M ST SE   
09/08/14 
SOUTHEAST REALTY LLC / WESLEY R. DAVIS
E1408797 / SUPPLEMENTAL
   
09/19/14 
SOUTHEAST REALTY LLC / MATT LOSIGNOR
P1408704 / SUPPLEMENTAL
   
09/19/14 
SOUTHEAST REALTY LLC / MATT LOSIGNOR
P1408703 / SUPPLEMENTAL
55 M ST SE   
09/11/14 
HINES GLOBAL REIT 55 M STREET LLC / DANIEL O WHITE
E1408953 / SUPPLEMENTAL
100 M ST SE   
09/15/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
TL1400150 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 6TH FLOOR OFFICE SPACE. PARTITIONS FURNITURE MEP AND LIFE SAFETY. REGUS 2429
   
09/20/14 
SQUARE 743 INC SQUARE 743 INC / KATE MITCHELL; SQUARE 743 INC SQUARE 743 INC; ROBERT HUNTER
AR53284155 / SUPPLEMENTAL
901 M ST SE   
09/12/14 
CARLTON RAY
AH1400687 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
09/12/14 
CARLTON RAY
AH1400686 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
0 N ST SE   
09/10/14 
SNALLYGASTER / ERIK BERGMAN
TN1400195 / CONSTRUCTION
SPECIAL EVENT SNALLYGASTER 1 10X40 TENT 1 20X90 TENT 2 20X160 TENT 1 30X15 STAGE TENT TEMPORARY GENERATOR
   
09/10/14 
DISTRICT OF COLUMBIA / JAMES A. WILLIAMS
E1408914 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
09/17/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1408553 / CONSTRUCTION
CONSTRUCTION OF A 11 STORY 336 UNIT APARTMENT BUILDING WITH FIRST FLOOR RETAIL AND THREE BELOW GRADE LEVELS FOR PARKING GARAGE PER BZA # 18619 GRANTED ON 9 / 24 / 13 WITH CONDITION: SCREENING OF THE PARKING ADJACENT TO H ST.--- SPECIFICALLY SHEETS 6 AND 7 OF EXHIBIT 23 - PLANS TO INCLUDE MECHANICAL PLUMBING AND ELECTRICAL WORK.
25 POTOMAC AVE SE   
09/09/14 
GRIFFIN STEPHEN
PC60869040 / POST CARD
INSTALLATION OF 1 TEMPORARY CONSTRUCTION TRAILER ON PRIVATE PROPERTY.
1500 SOUTH CAPITOL ST SE   
09/09/14 
COMCAST CABLE / MICHAEL SONESEN
AH1400678 / CONSTRUCTION
PLACING INNERDUCT IN EXISITING VERIZON MANHOLES SEPTEMEBR 5TH 2014 - OCTOBER 5TH 2014 EVENINGS ? SATRUDAYS 7PM TO 2AM
300 TINGEY ST SE   
09/11/14 
FC BOILERMAKER LLC / CHRIS WING
B1407179 / CONSTRUCTION
INTERIOR ALTERATION FOR NEW UNLEASHED BY PETCO STORE.
   
09/05/14 
FC BOILERMAKER LLC
B1411671 / CONSTRUCTION
INSTALL FIRE SUPPRESSION SYSTEM TO EXHAUST HOOD.
   
09/13/14 
FC BOILERMAKER LIC FC BOILERMAKER LIC / DENNIS STUBBS; FC BOILERMAKER FC BOILERMAKER LIC; DENNIS STUBBS
P24303627 / SUPPLEMENTAL
   
09/18/14 
FC BOILERMAKER LLC /
P1408685 / SUPPLEMENTAL
   
09/18/14 
CHRIS WING / SHANDI COBB; CHRIS WING; CHARLES CLYNES
AR65033933 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.