Since January, 2003
            
 (a random before-and-after moment)
May 20, 2006
March 29, 2015
South Capitol at O, Looking East-Southeast (see more)

Though I'm about to disappear down the college football rabbit hole for the the rest of the day, I couldn't resist getting a few quick photos of the new framing that's going up on the last block of Capitol Quarter's first phase, on the northwest corner of Fourth and I.
I also wandered over to First Street to get "final" photos of Velocity building now that the building has opened, including a shot of the sign now up at Justin's Cafe (not that you can really see the sign, thanks to poor sun positioning. Might have to sneak back over there early in the morning).
Here's the complete batch of before-and-after photos for the shots I posted today.
And now, time to go bite my orange-and-blue nails for a few hours.
Comments (7)
   
 
 More About Capper

JDLand.com Home

Comments

DC603 says: (11/28/09 7:00 PM)
I just found this blog today, and I'm glad I did. I live in the Axiom complex, and am excited for the neighborhood to start developing a bit more. Where is this new Justin's cafe?


JD says: (11/28/09 10:03 PM)
Welcome! Justin's is going to be in the ground floor of the Velocity Condos building, on First between K and L (two blocks south of your building). The menu will feature "fresh salads, sandwiches and wood oven baked pizzas," and there will be a full bar. I doubt it will open before New Year's.


JoeinDC says: (11/30/09 11:11 AM)
OMG, JD!!! Wood fired pizzas??? I am in so much trouble. The sad part is that with Results Gym only two blocks from my soon to be completed Cap. Quater townhouse, I will make all kinds of excuses to skip the gym and head to Justin's for pizza. I suppose if I jog to Justin's then that counts as exercise, right?

Welcome to the hood DC603. Mark my word... you will become obsessed with this blog. JD has worked this sucker out. It is so great that she has spent a bizzillion hours over the last number of years chronicling every conceivable development of our fair neighborhood. The importance of her work is invaluable as a historic time capsule of the near southeast's redevelopment into the gem neighborhood of the city.



B in DC says: (11/30/09 11:51 AM)
Metrocentric has posted renderings of what 225 Virginia will look like. They say that it will be the same design as was planned when the building was to be used for the MPD.

link


JD says: (11/30/09 11:56 AM)
I haven't been able to confirm yet that the drawings they're showing (which they didn't first seem to notice were from 2007, until a commenter pointed it out) are indeed the ones that the city will be moving forward on, since it's possible that a building that won't now be housing a department obsessed with security might get some tweaks to the design.


Edna Wellthorpe says: (12/1/09 10:55 AM)
Can you believe that the sign for "Justin's Cafe" is missing the apostrophe? Ha ha ha ha ha!!! I hate our illiterate society.


G St says: (12/1/09 11:44 AM)
Pizza Pizza

Maybe Hizz-honor, Mayor 4 Life (USS) Marion Barry can throw out the first pizza? (As this is near his old stomping grounds)

Like the full bar concept - stopped by Mariott once after Red Sox game w/Nats and Red Sox nation was happily buying suds there and supporting the old JD neighborhood.

Would imagine quite a few folks might wander over to this place after... NATS WIN! NATS WIN!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  
Get JDLand Updates In Your Inbox!

JD on Wednesday Tidbits: @MJM, I did think you of as soon as I saw the news. I also thought of the Mar...
MJM on Wednesday Tidbits: Shocked that "Mother Hen Sitting on Her Eggs Akridge" is finally selli...
JD on Wednesday Tidbits: Here's another tidbit (added to the post): Akridge is selling the former Market ...
JD on Wednesday Tidbits: Okay, so you should now be able to include one jpg or gif or png with a comment,...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/24/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/16
800 899 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/16/16
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/16
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/11/16
1200 B/O I ST SE   ROBBERY  05/08/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/08/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/16
1220 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/05/16
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
300 K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/02/16
UNIT B/O I ST SE   ROBBERY  04/29/16
1100 B/O 5TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/27/16
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/25/16

Recent Issued Building Permits Archive  
1233 1ST ST SE   
05/10/16 
null / KONE INC
EN1602126 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS ELEVATOR 5 & 6 CONDITION : APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600083 & MVQ1600084 SEE : B1403486 AND TL1600011
1108 2ND ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600233 / CONSTRUCTION
THREE BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE ALL 3 BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF ...
1331 2ND ST SE   
05/16/16 
DC WATER / DC WATER; CORMAN CONSTRUCTION
AH1600698 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 & B1605659 DC WATER, CORMAN CONSTRUCTION 202-863-0052
1005 3RD PL SE   
05/12/16 
PETER D TRIFU / JOSE M. MORALES
P1606192 / SUPPLEMENTAL
1300 4TH ST SE   
05/10/16 
LOU FOREST CITY - WASHINGTON / GEORGE MORETRENCH AMERICAN CORP.
SB1600070 / CONSTRUCTION
TO DRILL AND INSTALL 18 DEEP WELLS WITH 12" DIAMETER OF BOREHOLE AND 6" WELL CASING, AND 4 OBSERVATION WELLS WITH 6" DIAMETER OF BOREHOLE AND 2" WELL CASING TO 80 FEET VIA MUD ROTARY DRILLING FOR THE TEMPORARY CONSTRUCTION DEWATERING OF THE PROPOSED BELOW GRADE CONSTRUCTION. ALL DRILL SPOILS WILL BE CONTAINED AND DISPOSED OF ACCORDING TO FEDERAL AND DISTRICT OF COLUMBIA REGULATIONS.
1220 12TH ST SE 200   
05/11/16 
WASHINGTON GAS LIGHT CO / RALPH THREATT
E1606272 / SUPPLEMENTAL
1220 12TH ST SE   
05/11/16 
CORPORATE OFFICE PROPERTIES TRUST / KELLY WALSH; CORPORATE OFFICE PROPERTIES TRUST; THOMAS DVORAK
E74440979 / SUPPLEMENTAL
909 HALF ST SE   
05/05/16 
null / MARK A DORSEY
EN1601560 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) TRACTION / STEEL / CENTRALLY / VERTICAL TRANSPOTATION (2ND FLOOR)
70 I ST SE 832   
05/17/16 
null / NA NA NA
EHOP1690678 / HOME OCCUPATION
10 I ST SE   
05/19/16 
TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB / TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB; ECS MID-ATLANTIC LLC
SB1600232 / CONSTRUCTION
FIVE BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE ALL 5 BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF P...
201 L ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600234 / CONSTRUCTION
TWO BORINGS WILL BE COMPLETED UTILIZING A GEOPROBE DIRECT PUSH DRILL RIG USING A DUEL TUBE SAMPLING DEVICE. THE BORINGS WILL CREATE A 2.25 INCH ANULUS. THE GEOPROBE WILL ADVANCE BOTH BORINGS TO A DEPTH OF 30 FEET BELOW GROUND SURFACE OR UNTIL REFUSAL OR DENSE CLAY IS ENCOUNTERED. FOLLOWING COMPLETION OF THE SOIL BORINGS HOLES WILL BE TREMME GROUTED FROM THE BOTTOM TO THE TOP USING A MIXTURE OF POW...
14 M ST SE   
05/16/16 
ANDREW ROYALS
B1608241 / CONSTRUCTION
REPAIR AND REPLACEMENT OF WINDOW AND FRAME
50 M ST SE   
05/18/16 
KCG 50 M LLC ENGLEWOOD LLC / TIEVY; KCG 50 M LLC ENGLEWOOD LLC; TRACIE CLAXTON-RAMOS
SG1600300 / CONSTRUCTION
2 SIGNS CHANNEL LETTERS ILLUMINATED 2 BLADE SIGNS ILLUMINATED
100 M ST SE   
05/19/16 
SQUARE 743 INC AND 100 M ST SE LLC / LHREV WASHINGTON M STREET LLC A DELAWARE LLC; KIM MITCHELL CDKM CONSULTING LLC
B1605938 / CONSTRUCTION
APPROX 7938 SF TENANT FIT OUT - CURRENTLY SHELL CONDITION - FLOORING, DOORS, AND HARDWARE, DRYWALL, CEILILNG, LIGHTS, MECHANICAL, SPRINKLER AND PLUMBING TO BE ADDED. ALL WORK TO BE DONE ON 7TH FLOOR
800 NEW JERSEY AVE SE   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602094 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600091 & MVQ160092
   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602095 / SHOP DRAWING
TYPE OF ELEVATOR : THREE (3) ELECTRICAL / STEEL / CENTER / PASSENGER / 3 FLOORS ELEVATOR : G1, G2, G3 CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600090 & MVQ160089 & MVQ1600088
   
05/10/16 
SQUARE 737 LLC / KONE INC
EN1602107 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) ELECTRICAL / STEEL / CENTER / PASSENGER / 2 FLOORS ELEVATOR : G6, CONDITION: APPLICATION FOR MODIFICATION OF CONSTRUCTION CODE MVQ1600093
861 NEW JERSEY AVE SE   
05/18/16 
NA CSX TRANSPORTATION, INC.
AH1600719 / CONSTRUCTION
WORK IN PUBLIC ROW WITHIN THE VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT LOD FOR UTILITY, DEMOLITION, AND CONCRETE STRUCTURE CONSTRUCTION ACTIVITIES. ACTIVITIES WILL OCCUR AT THE FOLLOWING AREAS: BETWEEN 2ND STREET SE AND 3RD STREET SE ALONG VIRGINIA AVENUE SE, INTERSECTION OF 3RD STREET SE AND VIRGINIA AVENUE SE, BETWEEN 3RD STREET SE AND 4TH STREET SE ALONG VIRGINIA AVENUE SE, INTERSECTION OF...
880 NEW JERSEY AVE SE   
05/19/16 
880 NEW JERSEY AVENUE LLC / 880 NEW JERSEY AVENUE LLC; BRUCE PADDOCK SWIMMING POOL COMPANY
SP1600027 / CONSTRUCTION
1ST, 2ND 3RD, AND 4TH EXTENSION TO PERMIT SP1300053 TO EXPIRE 6 / 18 / 2016
1200 NEW JERSEY AVE SE 1ST FLR 20024   
05/06/16 
JBG/FEDERAL CENTER LLC / null
P1606040 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
05/05/16 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / . WATERFRONT CHURCH
B1607854 / CONSTRUCTION
REMODEL TWO BATHROOMS, REPLACE LIGHTING IN BATHROOM S & VESTIBULE -IN EXISTING BOXING - FITNESS CENTER UNDER CO1301802 NO CHANGE OF USE
1244 SOUTH CAPITOL ST SE   
05/05/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / CLARK CONCRETE CLARK CONCRETE
AH1600676 / CONSTRUCTION
AFTER HOURS TO LOAD AND UNLOAD TRUCKS FOR MATERIAL AND CONCRETE FROM 5 / 7 / 2016, 12 MIDNIGHT TO 5 / 9 / 2016 7AM
300 TINGEY ST SE 1ST/2ND   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606136 / SUPPLEMENTAL
300 TINGEY ST SE 202   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606138 / SUPPLEMENTAL
300 TINGEY ST SE   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602037 / SUPPLEMENTAL
   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602039 / SUPPLEMENTAL
355 WATER ST SE   
05/18/16 
PAUL GRUBER NEW BELGIUM BREWING COMPANY
TN1600129 / CONSTRUCTION
SPECIAL EVENT TOUR DE FAT 1 36X24 STAGE 5 20X20 TENTS 1 20X20 HEXAGON TENT NO GENERATORS
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.