Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
August 2003
May 26, 2013
2nd (West) at K, Looking South-Southwest (see more)

* This is about 50 feet off-topic, but Hank Stuever wrote a neat piece in today's Post Style section about the Capitol Skyline Hotel at South Capitol and I, SW, and the revitalization it's undergoing, including the creation of a series of weekend events this summer, such as Spike Mendelsohn grilling burgers poolside on Sundays. If you look at the article online and see the "This Story" box of links, there's one for "Video: Capitol Skyline Pool, 1969", which just happens to be a brief clip of my family swimming there (I'm the little fireplug just learning to swim). It's hard to see in this version, but at about the 24-second mark, when my dad is about to spring off the diving board, you can briefly see the "Esso" sign in the background that marks where the gas station just to the south of the hotel operated for so many years....
* Last week I wrote about the approval by both the NCPC and the Zoning Commission of the Capper zoning changes, and mentioned that the letter from the Marines that indicated the Corps' continued objections to the plans for apartments and an office building on the old Capper Seniors site at Seventh and M, was not included with other materials about the case. I now have the letter, which says in part:
"The Marine Corps [Anti-terrorism/Force Protection] issues are much greater in scope than those of the Navy. Because of our issues are more complex, considerable analysis and study is required to develop a solution that is acceptable, to the Marine Corps, the Developer, the Housing Authority and the District Planners. This detailed study must also be conducted in context of the larger community of stakeholders and historic integrity of the Marine Barracks as an institution. The Marine Corps has implemented a master planning effort to research and develop broad and unique solutions to these issues at hand." And: "The Marine Corps requires additional time to carry out our study and to develop acceptable solutions. Without adequate time to address these issues, including the possible need for alternatives on [the old Capper Seniors site], the Marine Barracks Mission and full function of that Institution could be jeopardized."
The Marines requested that the zoning action be tabled until adequate time was given to address their issues, but both the NCPC and the Zoning Commission gave the office and apartment plans their final approval anyway, with the record including the agreement between the developer and the Navy to address security concerns.
Comments (0)
 
 More About South Capitol St.

JDLand.com Home

Comments

Michael says: (6/15/09 4:07 PM)
This is preposterous. The Marine Corps "security" concerns are ridiculous and coming in last minute so to speak.


G St says: (6/16/09 10:06 AM)
The Marines just don't "understand" how the District of Calamity operates -- i.e., they need to start handing how bribes.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
conngs0 on Reminder: It sure would be a fantastic space for events. Hopefully the building gets clea...
202_cyclist on Reminder: I am pretty certain this was an event for US DOT. I saw a crew loading equipmen...
JD on Ho Hum, Another: Not 100000000% sure on 99 M, but no announcement of any tenants, and if they are...
JES on Ho Hum, Another: Oh, and anyone still scared of the green line needs to get out more. But I under...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O VIRGINIA AVE SE   MOTOR VEHICLE THEFT /  07/10/14
900 B/O HALF ST SE   THEFT F/AUTO /  07/10/14
100 B/O M ST SE   THEFT /  07/09/14
4TH ST SE AND L ST SE   ROBBERY /  07/08/14
800 B/O POTOMAC AVE SE   THEFT /  07/07/14
300 B/O K ST SE   THEFT F/AUTO /  07/07/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/05/14
100 B/O L ST SE   THEFT F/AUTO /  07/04/14
1100 B/O 2ND PLACE SE   THEFT F/AUTO /  07/03/14
2ND PLACE SE AND I ST SE   THEFT F/AUTO /  07/02/14
70 B/O I ST SE   ROBBERY / GUN  07/02/14
200 B/O I ST SE   THEFT F/AUTO /  07/02/14
400 B/O M ST SE   MOTOR VEHICLE THEFT /  06/30/14
UNIT B/O M ST SE   THEFT F/AUTO /  06/30/14
70 B/O I ST SE   THEFT /  06/29/14
1100 B/O 1ST ST SE   THEFT F/AUTO /  06/28/14
900 B/O 4TH ST SE   THEFT /  06/28/14
70 B/O I ST SE   THEFT /  06/26/14
1000 B/O NEW JERSEY AVE SE   THEFT F/AUTO /  06/26/14
7TH ST SE AND L ST SE   ROBBERY /  06/25/14
3RD ST SE AND K ST SE   THEFT F/AUTO /  06/24/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
804 3RD ST SE    Maximiliano Villagra 
Issued
streetfixture; new  
 08/05/14
to
08/06/14
904 3RD ST SE    Janel Fitzhugh 
Issued
streetfixture; new  
 07/01/14
to
08/14/14
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
800 NEW JERSEY AVE SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/20/14
to
08/22/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 05/27/14
to
07/27/14
    WASHINGTON GAS 
Issued
excavation; new  
 06/17/14
to
08/17/14
    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
1105 NEW JERSEY AVE SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/13/14
to
08/11/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1100 1ST ST SE   
07/15/14 
NA NA NA
EHOP1490710 / HOME OCCUPATION
1212 4TH ST SE   
07/11/14 
FC 1212 LLC /
P1406926 / SUPPLEMENTAL
   
07/14/14 
MIKE LENARD / BHAR; W. SAKIE BHAR
SG1400363 / CONSTRUCTION
INSTALL ONE SET OF BUILDING SIGN ON TO EXISTING BUILDING
1331 4TH ST SE   
07/09/14 
UNITED STATES OF AMERICA / RONALD C. CAYTON
E1406628 / SUPPLEMENTAL
1220 12TH ST SE   
07/16/14 
FAIRBANKS MORSE ENGINE / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1409041 / CONSTRUCTION
INTERIOR ALTERATION TO EXISTING 2578 SF OFFICE SPACE. AFFECTED AREA LESS THAN 1000 SF TO CREATE DEMISING WALL AND MINOR ALTERATIONS TO PARTITION PLAN IN CONFERENCE AREA. MECHANICAL AND ELECTRICAL WORK INCLUDED.
326 L ST SE   
07/17/14 
NA NA NA
EHOP1490715 / HOME OCCUPATION
55 M ST SE   
07/16/14 
HINES GLOBAL REIT 55 M STREET LLC / TYRAN D. BRANNUM
E1407255 / SUPPLEMENTAL
20 M ST SE   
07/17/14 
SOUTHEAST REALTY LLC / JOHN GIUSEPPE-RAMCO
TL1400132 / CONSTRUCTION
FIRST TIME TENANT BUILDOUT FOR FAST FOOD ESTABLISHMENT - SUBWAY SANDWICH SHOP SEATING 41 AS SHOWN ON THE ATTACHED ARCH. MECH. PLUMB. ELECT AND FIRE PROTECTION DWGS. INTERIOR WORK ONLY.
55 M ST SE   
07/15/14 
HINES
B1409693 / CONSTRUCTION
INSTALL 6 AUTOMATIC DOOR OPERATORS LOCATED AT THE ELEVATOR LOBBIES BETWEEN THE 4TH-7TH FLOORS
901 M ST SE   
07/15/14 
CARLTON RAY
AH1400584 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
07/15/14 
CARLTON RAY
AH1400585 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
800 NEW JERSEY AVE SE   
07/14/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1409654 / CONSTRUCTION
REVISION TO PERMIT #SH1400039 FOR A OWNERSHIP CHANGE
1000 NEW JERSEY AVE SE   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1406902 / SUPPLEMENTAL
   
07/11/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRANDON K VIERNES
M1402531 / SUPPLEMENTAL
   
07/22/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / DONALD R. MCGLYNN
E1407426 / SUPPLEMENTAL
1105 NEW JERSEY AVE SE   
07/07/14 
ST MATTHEWS BAPTIST CHURCH / ST MATHEWS CURCH
R1400051 / CONSTRUCTION
TWO STORY CHURCH
1236 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400340 / CONSTRUCTION
WE PROPOSE DRILLING THREE SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLE...
1244 SOUTH CAPITOL ST SE   
07/11/14 
1244 SOUTH CAPITOL RESIDENTIAL LLC / GEOCAPITOL ENGINEERING LLC
SB1400341 / CONSTRUCTION
WE PROPOSE DRILLING TWO SIX-INCH DIAMETER GEOTECHNICAL TEST BORINGS USING THE HOLLOW STEM AUGER METHOD TO EVALUATE THE SUBSURFACE CONDITIONS. THE PROPOSED TEST BORING DEPTHS WILL BE 80 FEET BELOW THE EXISTING GROUND SURFACE. DRILLING EQUIPMENT WILL BE DECONTAMINATED BETWEEN EACH HOLE TO AVOID CROSS CONTAMINATION THROUGHOUT THE SITE. UPON COMPLETION THE GEOTECHNICAL TEST BORINGS WILL BE BACKFILLED ...
201 TINGEY ST SE   
07/11/14 
JBG COMPANIES / GEORGE DELGADO
B1409541 / CONSTRUCTION
ONE DAY SPECIAL EVENT FOR BMW SHOW--150 OCCUPANTS EXTERNAL GENERATOR RESTROOMS AND LIGHTING BAY DOORS TO REMAIN OPEN DURING FUNCTION
   
07/22/14 
JBG/SEFC 170 LLC / MICHAEL B. BELL
E1407422 / SUPPLEMENTAL
300 TINGEY ST SE   
07/08/14 
FVI 2020 / STEPHEN ADAMS; FVI 2020; STEPHEN ADAMS
E14277468 / SUPPLEMENTAL
   
07/10/14 
FORREST CITY AT THE YARDS / CRIS FLACK
TL1400123 / CONSTRUCTION
REVISION TO B1402734 FOR REVISIONS TO MECHANICAL AND ELECTRICAL SYSTEMS.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.