Since January, 2003

Ad by Google
 (a random before-and-after moment)
May 20, 2006
December 13, 2014 
1st at M, Looking South-Southwest (see more)

UPDATE: Here are a few photos from the ceremony, along with a closer peek at the construction underway.
(Original entry) Just got back from the ceremony at Diamond Teague Park; while I'm working on the photos, here's the press release about the event, which I'll note contain the same April-for-the-piers, July-for-the-park timeline I've been mentioning (and yes, I'm being lazy and just reproducing the press release--rough morning!):
"Mayor Adrian M. Fenty on Friday joined community leaders in a groundbreaking ceremony for Diamond Teague Park, an $8 million waterfront park that will link Nationals Park to the Anacostia River.
"'Diamond Teague committed his life to restoring, protecting and preserving the Anacostia River,' Mayor Fenty said. 'This park will be a fitting tribute to his legacy and it will mark our commitment as a city to carry on his work.'
"The park is named after 19-year old Diamond Teague, a member of the Earth Conservation Corps (ECC) who was murdered in 2003. The ECC members -- many live in communities along the river's banks -- work to improve the river's health and protect the plant and animal species that call the Anacostia home.
"[...]It will connect the ballpark to a pair of public piers and a 20-mile network of waterfront trails. A 250-foot pier will be built to host commercial vessels such as water taxis and charter boats. The pier will also include slips for the ECC and the District's fire and life safety vessels.
"The park will feature a separate 200-foot environmental pier for educational groups, kayaks and canoes. The piers are expected to be complete by baseball's Opening Day, April 13, 2009.
"Construction and planting work on the upland portion of the park will be completed by July. Muralist Byron Peck and City Arts are also working to complete a memorial dedicated to Diamond Teague that will be unveiled later this summer.
"The cost of the $8 million park is being covered through dedicated revenue streams tied to a number of adjacent economic development projects that surround the park including Florida Rock's one million square foot mixed-used project directly to the West of the park and JBG's U.S. Department of Transportation headquarters building to the East."
Comments (0)
 
 More About Earth Conservation Corps

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on The Big Stick: Mr. JDLand and I did go--I had the polish sausage and he had the half smoke, and...
JES on The Big Stick: JD, I saw some menu pics on twitter. Did you go? How was it?
Westnorth on Navy Yard Circulator: People generally don't ride bus routes from one end to the other end. In the cas...
E. Masquinongy on Southeast Blvd.: All three plans show the rehabilitation of Barney Circle, reconnecting it to L S...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O I ST SE   THEFT F/AUTO
 12/18/14
700 B/O L ST SE   THEFT
2nd Degree
 12/17/14
1200 B/O 1ST ST SE   THEFT
Theft F/Building
 12/08/14
1200 B/O 1ST ST SE   THEFT
 11/21/14
900 B/O 5TH ST SE   BURGLARY
 11/21/14
200 B/O I ST SE   THEFT
 11/21/14
1200 B/O NEW JERSEY AVE SE   THEFT
 11/20/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
12/03/14 
NA NA NA
EHOP1590134 / HOME OCCUPATION
   
12/10/14 
KAREN NZAKIMUENA
PC74349112 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1016 3RD ST SE   
12/15/14 
ANAMARIA R MOTTOLA / DIXON
B1502438 / CONSTRUCTION
RENOVATIONS MINOR MEP
1212 4TH ST SE   
12/10/14 
FC 1212 LLC / SCHINDLER ELEVATOR CORP
ER1500593 / SHOP DRAWING
REPLACE MAXTON UC2A VALVE EST. COST OF WORK $ 2 2120. 00
927 5TH ST SE   
12/15/14 
AARON LORENZO
PC25919394 / POST CARD
REPLACEMENT IN KIND OF EXISTING FENCE ON PRIVATE PROPERTY. REPLACEMENT IN KIND WHEN APPLIED TO ARCHITECTURAL FEATURES MEANS REPLACEMENT WITH A FEATURE OF LIKE MATERIAL THAT REPLICATES THE EXISTING FEATURE IN PROPORTION APPEARANCE TEXTURE DESIGN DETAIL AND DIMENSIONS.
1000 5TH ST SE   
12/04/14 
UNITED STATES OF AMERICA / WALTER T JONES
E1501598 / SUPPLEMENTAL
1015 HALF ST SE   
12/10/14 
HALF STREET LLC / ART DISPLAY; BOB BIROONAK ART DISPLAY CO.
SG1400465 / CONSTRUCTION
ONE ILLUMINATED NEWS TICKER SIGN
1201 HALF ST SE   
12/10/14 
WEST HALF 1 LLC / MARK W GIBSON
E1501746 / SUPPLEMENTAL
   
12/12/14 
JASON YORK
TN1500036 / CONSTRUCTION
INSTALLING SMALL TENT ON DEC 29 2014 FOR THE BRIDGESTONE WINTER CLASSIC ON 1-1-15 WITH GENERATOR TENTS REMOVED ON 1-2-15
808 L ST SE   
12/10/14 
NAVY YARD ASSOCIATES LLC / KE-MAURELLE PREDDIE
B1412006 / CONSTRUCTION
NEW OFFICE USE FOR 1254 SQ. FT. EXISTING TWO STORIES PLUS BASEMENT STRUCTURE ON SE / C-3-A ZONING DISTRICT. MECHANICAL ELECTRICAL AND PLUMBING REMAIN AS IS.
80 M ST SE   
12/10/14 
WELLS REIT II 80 M STREET LLC / ANTHONY G SAMBURG
E1501724 / SUPPLEMENTAL
14 M ST SE   
12/16/14 
ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON / PHILLIP B. MOBLEY
FB1500047 / SUPPLEMENTAL
20 M ST SE   
12/04/14 
TRANSWESTERN JEFFREY GROSS / OLLIE READ; TRANSWESTERN JEFFREY GROSS; CHRISTOPHER SCHULZE
AR66514546 / SUPPLEMENTAL
   
12/04/14 
TRANSWESTERN JEFFERY W GROSS / ANDREW ARNTSON; TRANSWESTERN JEFFERY W GROSS; ANDREW ARNTSON
P96600069 / SUPPLEMENTAL
80 M ST SE   
12/03/14 
MARY JACKSON
PC44081129 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
12/05/14 
WELLS REIT II 80 M STREET LLC /
P1501746 / SUPPLEMENTAL
100 M ST SE   
12/03/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1502037 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. SUBDIVIDE TENANT SPACE AND ADD PANTRY. PARTITIONS MEP AND LIFE SAFETY. NORTHWOOD INVESTORS LLC
202 M ST SE   
12/10/14 
DISTRICT OF COLUMBIA / WOODY WICKLIFFE
TN1500035 / CONSTRUCTION
INSTALL 50FT X 100FT TENT NO GENERATORS NO COOKING NO SMOKING NO STAGES 10FT X 70FT TENT INSTALLED DEC 11-15 2014 EVENTS DEC 12-14 2014 12:01PM - 9:00 PM
1201 M ST SE   
12/11/14 
CARLTON RAY
AH1500149 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
75 N ST SE   
12/11/14 
CRANE SERVICE CO / CHRISTINE LONG
AH1500150 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 2:00AM THRU 11:00PM
800 NEW JERSEY AVE SE   
12/08/14 
SQUARE 737 LLC / GLENNWOOD ROGERS
P1501673 / SUPPLEMENTAL
25 POTOMAC AVE SE   
12/02/14 
RIVERFRONT HOLDINGS I LLC C/O ECC INC. / ECC INC.
UT1500007 / CONSTRUCTION
REMOVAL OF ONE 100-GALLON UNDERGROUND STORAGE TANK DURING MASS EXCAVATION ACTIVITIES FOR SITE REDEVELOPMENT.
   
12/03/14 
RIVERFRONT HOLDINGS I LLC / WOODY WICKLIFFE
TN1500032 / CONSTRUCTION
INSTALL 40FT X 80FT TENT NO COOKING NO SMOKING NO PROPANE NO LIGHTING 40FT X 40FT TENT 2 GENERATORS 25KW EACH 20FT X 20FT TENT 8FT X 20FT PLATFORM 40FT X 40FT PLATFORM 20FT X 20FT PLATFORM INSTALLED DEC 8 -9 2014 EVENT DEC 9 2014 9AM - 4PM
   
12/05/14 
FLORIDA ROCK PROPERTIES INC / ROBERT S. WATTS
E1501658 / SUPPLEMENTAL
   
12/05/14 
RIVERFRONT INVESTMENT PARTNERS / JASON BENTLEY
B1408697 / CONSTRUCTION
CONSTRUCTION OF NEW 9 STORY BUILDING. THIRD PARTY REVIEW
1500 SOUTH CAPITOL ST SE   
12/18/14 
NATIONALS PARK / MARK W GIBSON
E1501975 / SUPPLEMENTAL
300 TINGEY ST SE   
12/15/14 
FC BOILERMAKER LLC / GREGORY BIRCKHEAD; FC BOILERMAKER LLC; MICHAEL BELL
E55526822 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.