Since January, 2003
            
 (a random before-and-after moment)
January 8, 2012
April 17, 2016
Half at Potomac, Looking Southeast (see more)

For those who haven't wandered by Fourth and L recently to check out what's happening at Capitol Quarter, I can report that new slabs have been poured, and vertical construction should get underway (again) next week. (If you haven't been following along, this is a second start for these townhouses, after the initial construction in August showed foundation problems and resulted in the demolition of the first units that were underway.)
Comments (5)
   
 
 More About Capper
 All posts: Capper, Capitol Quarter

JDLand.com Home

Comments

NatsFan says: (12/5/08 10:12 AM)
Have the slabs been poured for the entire row?


JD says: (12/5/08 3:17 PM)
I haven't actually seen the work with my own eyes yet, so I don't know for sure.


bruce says: (12/5/08 5:21 PM)
Ill be over there next week for a meeting.
Ill check it out.


JD says: (12/5/08 5:55 PM)
I'll be taking pictures this weekend.


CJ says: (12/7/08 7:07 PM)
foundations now are 13 feet under instead of 7. Soil had fill instead of virgin soil above 7 feet - hence the new depth.
they are pouring foundations in block 2 now.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News

JD on Plans Afoot to: West of the car wash is owned by CSX. Let's go to the map again--the red is CSX,... [image]
202_cyclist on Due South Working: Okay, let's see how this works. I created a Yahoo group for the Navy Yard/Capit...
E. Masquinongy on Plans Afoot to: What is the lot directly west of the car wash? It has been vacant since the begi...
jdc on Due South Working: Is JDland a refuge for former Michigan folks?
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/30/16
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/16
1000 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/29/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/26/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/24/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/16
800 899 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/16/16
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/15/16
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/16
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/11/16
1200 B/O I ST SE   ROBBERY  05/08/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/08/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/16
1220 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/05/16
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
300 K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/04/16
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/02/16

Recent Issued Building Permits Archive  
1233 1ST ST SE   
05/23/16 
null / KONE INC
EN1602096 / SHOP DRAWING
Type of Elevator : Two (2) Electrical / steel / center / passenger / 16 floors
   
05/23/16 
null / KONE INC
EN1602097 / SHOP DRAWING
Type of Elevator : One (1) Electrical / steel / center / passenger / 16 floors (elevator #2)
   
05/23/16 
null / KONE INC
EN1602098 / SHOP DRAWING
Type of Elevator : One (1) Electrical / steel / center / passenger / 16 floors (elevator #3)
   
05/24/16 
BALLPARK HOTEL LLC / RICHARD V CAREY
P1606451 / SUPPLEMENTAL
1277 1ST ST SE   
05/23/16 
PEPCO PEPCO
AH1600711 / CONSTRUCTION
CABLE SPLICING & MISC EQUIPMENT - MH ACCESS PEPCO BOND #017026121
1108 2ND ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600233 / CONSTRUCTION
Three borings will be completed utilizing a geoprobe direct push drill rig using a duel tube sampling device. the borings will create a 2.25 inch anulus. The geoprobe will advance all 3 borings to a depth of 30 feet below ground surface or until refusal or dense clay is encountered. following completion of the soil borings holes will be tremme grouted from the bottom to the top using a mixture of ...
1331 2ND ST SE   
05/16/16 
DC WATER / DC WATER; CORMAN CONSTRUCTION
AH1600698 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 & B1605659 DC Water, Corman Construction 202-863-0052
1005 3RD PL SE   
05/12/16 
PETER D TRIFU / JOSE M. MORALES
P1606192 / SUPPLEMENTAL
1000 5TH ST SE   
05/25/16 
KIM MITCHELL, CDKM CONSULTING, LLC / OMAR BIAGAS; KIM MITCHELL, CDKM CONSULTING, LLC; JOHN BIAGAS
E94700028 / SUPPLEMENTAL
This supplemental permit was issued online. Use the Online Permit View application on DCRA Intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following URL into an internet browser. https: / / ospi.dcra.dc.gov / ospi / PrintPermit.aspx?param = zI8IgGJEIleDWgjMbZfwro4FBxVFy8Px
1220 12TH ST SE 200   
05/11/16 
WASHINGTON GAS LIGHT CO / RALPH THREATT
E1606272 / SUPPLEMENTAL
1220 12TH ST SE   
05/11/16 
CORPORATE OFFICE PROPERTIES TRUST / KELLY WALSH; CORPORATE OFFICE PROPERTIES TRUST; THOMAS DVORAK
E74440979 / SUPPLEMENTAL
This supplemental permit was issued online. Use the Online Permit View application on DCRA Intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following URL into an internet browser. https: / / ospi.dcra.dc.gov / ospi / PrintPermit.aspx?param = zI8IgGJEIldFWRC67V1mkMF%2fVBuW5xWq
70 I ST SE 832   
05/17/16 
null / NA NA NA
EHOP1690678 / HOME OCCUPATION
10 I ST SE   
05/19/16 
TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB / TIMOTHY TEMPLE- CAPITAL HILL RACQUET CLUB; ECS MID-ATLANTIC LLC
SB1600232 / CONSTRUCTION
Five borings will be completed utilizing a geoprobe direct push drill rig using a duel tube sampling device. the borings will create a 2.25 inch anulus. The geoprobe will advance all 5 borings to a depth of 30 feet below ground surface or until refusal or dense clay is encountered. following completion of the soil borings holes will be tremme grouted from the bottom to the top using a mixture of p...
   
05/24/16 
CAPITAL HILL RACQUET CLUB C/O HUNTER DAWKINS, JOHNSON DEVELOPMEN / CAPITAL HILL RACQUET CLUB C/O HUNTER DAWKINS, JOH; ECS MID-ATLANTIC, LLC C/O REBECCA RUSCHMAN
SB1600235 / CONSTRUCTION
We will perform three borings on this property to a depth of 60 feet below the existing site grades. The borings will be drilled utilizing a 3.25-inch, hollow-stem, continuous flight auger and will generate an approximately 6 inch annulus. After geotechnical exploration is complete, the borings will be backfilled with bentonite slurry consisting of 2 lbs bentonite powder to 1 gallon of water ratio...
201 L ST SE   
05/19/16 
NA DISTRICT OF COLUMBIA HOUSING AUTHORITY / NA DISTRICT OF COLUMBIA HOUSING AUTHORITY; ECS MID-ATLANTIC LLC
SB1600234 / CONSTRUCTION
Two borings will be completed utilizing a geoprobe direct push drill rig using a duel tube sampling device. the borings will create a 2.25 inch anulus. The geoprobe will advance both borings to a depth of 30 feet below ground surface or until refusal or dense clay is encountered. following completion of the soil borings holes will be tremme grouted from the bottom to the top using a mixture of pow...
14 M ST SE   
05/16/16 
ANDREW ROYALS
B1608241 / CONSTRUCTION
repair and replacement of window and frame
50 M ST SE   
05/18/16 
KCG 50 M LLC ENGLEWOOD LLC / TIEVY; KCG 50 M LLC ENGLEWOOD LLC; TRACIE CLAXTON-RAMOS
SG1600300 / CONSTRUCTION
2 Signs Channel Letters Illuminated 2 Blade Signs illuminated
100 M ST SE FLOOR 7   
05/24/16 
SQUARE 743 INC / DAVID FLEMING
P1606462 / SUPPLEMENTAL
100 M ST SE   
05/19/16 
SQUARE 743 INC AND 100 M ST SE LLC / LHREV WASHINGTON M STREET LLC A DELAWARE LLC; KIM MITCHELL CDKM CONSULTING LLC
B1605938 / CONSTRUCTION
APPROX 7938 SF TENANT FIT OUT - CURRENTLY SHELL CONDITION - FLOORING, DOORS, AND HARDWARE, DRYWALL, CEILILNG, LIGHTS, MECHANICAL, SPRINKLER AND PLUMBING TO BE ADDED. ALL WORK TO BE DONE ON 7TH FLOOR
   
05/24/16 
RICHARD ELLIS / DAVID HUDGENS; RICHARD ELLIS; DAVID HUDGENS
P10155121 / SUPPLEMENTAL
This supplemental permit was issued online. Use the Online Permit View application on DCRA Intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following URL into an internet browser. https: / / ospi.dcra.dc.gov / ospi / PrintPermit.aspx?param = zI8IgGJEIleDWgjMbZfwrvBRHQhIHx5f
861 NEW JERSEY AVE SE   
05/18/16 
NA CSX TRANSPORTATION, INC.
AH1600719 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities. Activities will occur at the following areas: between 2nd Street SE and 3rd Street SE along Virginia Avenue SE, intersection of 3rd Street SE and Virginia Avenue SE, between 3rd Street SE and 4th Street SE along Virginia Avenue SE, intersection of...
880 NEW JERSEY AVE SE   
05/19/16 
880 NEW JERSEY AVENUE LLC / 880 NEW JERSEY AVENUE LLC; BRUCE PADDOCK SWIMMING POOL COMPANY
SP1600027 / CONSTRUCTION
1st, 2nd 3rd, and 4th extension to permit SP1300053 to expire 6 / 18 / 2016
1200 NEW JERSEY AVE SE 20024   
05/26/16 
JBG COMPANIES / JBG COMPANIES; KRISTINA DELGADO
B1605873 / CONSTRUCTION
Renovations to office space on 3rd floor. Approx. 2000SF.
300 TINGEY ST SE 1ST/2ND   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606136 / SUPPLEMENTAL
300 TINGEY ST SE 202   
05/11/16 
FC BOILERMAKER LLC / WILLIAM P SAUREST
P1606138 / SUPPLEMENTAL
300 TINGEY ST SE   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602037 / SUPPLEMENTAL
   
05/11/16 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS
M1602039 / SUPPLEMENTAL
355 WATER ST SE   
05/18/16 
PAUL GRUBER NEW BELGIUM BREWING COMPANY
TN1600129 / CONSTRUCTION
Special Event Tour de Fat 1 36x24 stage 5 20x20 tents 1 20x20 hexagon tent No generators
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.