This morning Mayor Fenty held a press conference at Nationals Park with various city officials to highlight tomorrow's Anacostia Waterfront Information Fair, and also talk up the recent progress and near-term next steps for the more than $8 billion worth of economic development, transportation, and infrastructure projects in the pipeline along the Anacostia River (not only in Near Southeast, but from the Southwest Waterfront all the way up past RFK).
Having sworn off taking any more photos of The Mayor at the Microphone (unless he shows up in a Hawaiian shirt and swimtrunks or something), I decided to record the 20-minute event instead, so that the five or six of you interested in hearing the remarks can do so. (It's a 2.6-mb MP3 file; the first few seconds are rough, but then it settles in.)
If you listen, you'll hear how the mayor managed to cajole the notoriously camera-shy Stan Kasten into saying a few words about what's happening along the river and in the neighborhood from the point of view of the area's largest tenant. Deputy Mayor Neil Albert, DDOT Director Frank Seales, Office of Planning head Harriet Tregoning, and the director of the city's Office of the Environment George Hawkins spoke as well. There was some discussion throughout (and especially at the end) about how the slowing economy might be impacting both the city's plans and developers' projects, but the mayor remains optimistic.
The press release from the mayor's office sums up the main points of today's event, but here's the Near Southeast-specific highlights from both the remarks and some other chatter of the day. First up, news of the three big parks:
The city "will break ground at Diamond Teague Park by the end of 2008." (And the guide for tomorrow's fair says that the park will be completed in spring 2009, which is the same date we've been hearing for a while.) The mayor also touted the operating agreement with Forest City Washington to build and maintain the $42 million, 5-acre Park at the Yards (but you knew about this already), as well as the the agreement with the Canal Park Development Corp. to build the $13.1 million, three-block-long park. (No mention of school buses.)
Then there's the bridges: Reconstruction of the 11th Street Bridges is scheduled to begin in mid-2009. (The shortlist of firms vying for the design-build contract was announced a few weeks ago.) Whether we actually see heavy equipment moving in mid-2009, or whether this just marks the first part of the design-build project is not quite clear. I was also told that the contract to demolish the flyover ramps to and from RFK could be completed soon, and that demolition would happen not long after the contract is signed.
Plus, the final Environmental Impact Statement for South Capitol Street and the Douglass Bridge is expected in spring 2009; that's when we'll hear which of the four bridge designs has been chosen.
As for the river itself, the city has started real-time water quality monitoring, updated automatically online 24 hours a day. There's also now the Anacostia 2032 Plan "to make the Anacostia River boatable, swimmable, and fishable in 25 years." And a Green Summer Jobs Corps was created earlier this year to "engage youth in the cleaning and greening of District neighborhoods and parks and to introduce them to green-collar job opportunities."
Finally, a planning process is underway to revamp Boathouse Row, the stretch of boat clubs along the Anacostia between 11th Street and Pennsylvania Avenue. (I took a bunch of photos near the boathouses a few months back, and have been lazy about ever getting them posted, though you can see a few boathouse-free shots of the environs here and here.)
There's more about projects elsewhere along the Anacostia, but other bloggers get to cover those. Will update this post if there's any media coverage from today's event, and will have a fresh post on Saturday after the fair. I imagine I'll Twitter a bit from those festivities (like I did from today's); remember that if you aren't a Twitter-er, you can read my tweets on the JDLand homepage--check 'em out frequently, because I do sometimes post news there first, before I write full blog entries.
SATURDAY FAIR UPDATE: They're now going to be providing free shuttle bus service from the New Jersey & M Metro entrance to/from the ballpark, from 12:30 pm to 5:15 pm. (After they heard somewhere that the Half and M subway entrance is going to be closed on Saturday.)
Comments (0)
 
 More About Nationals Park

JDLand.com Home

Comments

Jay says: (11/14/08 3:14 PM)
I know some people aren't big fans of Nationals Park, but there it is, playing host today and tomorrow and other events. Without it being there, not sure these type announcements would mean as much. I mean, if it wasn't there, where would they have held today's event with the same amount of cachet?

Just saying..




Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Gamble Rogers on The Riverfront Apartments/Florida: Your great shots of the Florida Rock project got me thinking -- Nats Park may vi...
JD on Bonchon Officially Opening: Let me know when you want to reveal what project you think this is.
202_cyclist on Bonchon Officially Opening: To follow up from this weekend, there is another construction vehicle at the 3rd...
BLT on Bonchon Officially Opening: Friendly, fast service and fantastic food tonight. Everything was spot-on! So ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
0 B/O POTOMAC AVE SE   ROBBERY
Robbery/Attempt To Commit Robbery
 03/28/15
600 B/O VIRGINIA AVE SE   ROBBERY  03/22/15
300 B/O TINGEY ST SE   THEFT
2nd Degree
 03/22/15
500 B/O L ST SE   THEFT
Theft 1st Degree
 03/21/15
50 B/O M ST SE   THEFT
2nd Degree
 03/10/15
300 B/O L ST SE   MOTOR VEHICLE THEFT
Unauthorized Use Of Vehicle
 03/08/15
700 B/O L ST SE   ROBBERY
Robbery -- Force & Violence
 03/07/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 03/02/15
70 B/O I ST SE   THEFT
2nd Degree
 03/01/15
100 B/O K ST SE   THEFT F/AUTO
 03/01/15
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1233 1ST ST SE   
03/25/15 
BALLPARK HOTEL LLC / APS INSPECTIONS
B1403486 / CONSTRUCTION
THE SCOPE OF WORK FOR THE 1233 1ST ST SE SUBMISSION IS THE CORE AND SHELL ONLY OF A NEW 12 STORY BUILDING. THE APPROXIMATELY 127 200 SF BUILDING IS INTENDED TO BE A HOTEL. THE FUTURE INTERIOR FIT-OUT WILL BE SUBMITTED SEPARATELY. THE BUILDING WILL SIT ON TOP OF GROUND FLOOR RETAIL / LOBBY LEVEL SUBMITTED AS PART OF A SEPARATE SUBMISSION FOR 1277 1ST ST SE.
1277 1ST ST SE   
03/25/15 
BALLPARK RESIDENTIAL LLC / BALL PARK SQUARE LLC
B1403488 / CONSTRUCTION
THE SCOPE OF WORK FOR THE 1277 1ST ST SE SUBMISSION INCLUDES 2 LEVELS OF BELOW GRADE PARKING TOTALING 370-380 PARKING SPACES A GROUND FLOOR RETAIL / LOBBY / LOADING LEVEL WITH APPROXIMATELY 26 500 SF OF RETAIL AND AN APPROXIMATELY 304 000 SF 13 STORY APARTMENT BUILDING CONTAINING APPROXIMATELY 326 UNITS.
1299 1ST ST SE   
03/16/15 
BALL PARK SQUARE LLC / PHYLLIS STEVENS
B1403487 / CONSTRUCTION
THE SCOPE OF WORK FOR THE 1299 1ST ST SE SUBMISSION IS THE CORE AND SHELL OF A NEW APPROXIMATELY 7 600 SF 2 STORY RETAIL BUILDING WITH A SINGLE BASEMENT LEVEL. THE BUILDING IS INTENDED TO BE A RESTAURANT. THE FUTURE INTERIOR FIT-OUT WILL BE PERMITTED SEPARATELY.
1007 8TH ST SE   
03/10/15 
CALLE OCHO LLC / RALPH THREATT
E1503913 / SUPPLEMENTAL
909 HALF ST SE   
03/26/15 
23 I LLC / WAYNE REEP; 23 I LLC; WAYNE REEP
E37408577 / SUPPLEMENTAL
1015 HALF ST SE   
03/17/15 
BON CHON / PHILIP GODAIRE; BON CHON; PHILIP GODAIRE
P42469697 / SUPPLEMENTAL
   
03/17/15 
EVAN OBRIEN / JOSEPH ABRESCH; EVAN OBRIEN; ROBERT HUNSBERGER
E74054014 / SUPPLEMENTAL
   
03/25/15 
HALF ST SE LLC / GEORGE DELGADO
B1501688 / CONSTRUCTION
INTERIOR ALTERATION TO 3 4 5 FLOORS AND PARTIAL 6TH FLOOR. WORK TO INCLUDE ELECTRICAL MECHANICAL AND PLUMBING
   
03/25/15 
SAM HOLLEN / GARY MCVEY; SAM HOLLEN; GARY MCVEY
E58849835 / SUPPLEMENTAL
82 I ST SE   
03/17/15 
CSX TRANSPORTATION INC / MITCH A. PERMUY
E1504130 / SUPPLEMENTAL
100 I ST SE   
03/26/15 
NA NA NA
EHOP1590452 / HOME OCCUPATION
300 M ST SE   
03/13/15 
FEDERAL CENTER LP / GREGORY E LIGON
E1504060 / SUPPLEMENTAL
250 M ST SE   
03/12/15 
DAN MCCABE / MICHAEL YASEK
SB1500183 / CONSTRUCTION
FIVE 70-FOOT GEOTECHNICAL SPT SOIL BORINGS WILL BE PERFORMED WITH AN AUGER DRILLING RIG UTILIZING CONTINUOUS FLIGHT HOLLOW STEM AUGERS CREATING APPROXIMATELY 6-INCH DIAMETER BOREHOLES.
300 M ST SE   
03/10/15 
FEDERAL CENTER LP /
P1504050 / SUPPLEMENTAL
909 NEW JERSEY AVE SE   
03/16/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / DENNIS LEE WINDSOR
M1501348 / SUPPLEMENTAL
ONE UNIT IS A 10 TON UNIT AND 2 ADDITIONAL UNITS ARE 7.5TONS
   
03/17/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / DAVID L. HAHN
P1504255 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
03/14/15 
PHILIP BROWN
PC93167082 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
1111 NEW JERSEY AVE SE   
03/19/15 
NJA ASSOCIATES LLC / THOMAS P MCGUIRE
E1504215 / SUPPLEMENTAL
25 POTOMAC AVE SE   
03/18/15 
RIVERFRONT HOLDINGS I LLC / GLENNWOOD ROGERS
P1504172 / SUPPLEMENTAL
301 WATER ST SE   
03/13/15 
FOREST CITY / FVI 2020
TL1500054 / CONSTRUCTION
NEW RESTAURANT TENANT LAYOUT AT THE LUMBER SHED PARCEL FOR AN OYSTER BAR WITH 55 INTERIOR SEATS (55 AT 1ST LEVEL AND 30 AT MEZZANINE) 10 STAFF AND 38 OUTDOOR SUMMER GARDEN SEATING.
   
03/13/15 
FC LUMBER SHED LLC / FLACK
TL1500055 / CONSTRUCTION
FULL SERVICE RESTAURANT LOCATED ON THE GROUND FLOOR WITH A TOTAL NUMBER OF SEATS OF 170. INDOORS SEATING IS 86 OUTDOORS SEATING IS 84 ALL OUTDOOR SEATS ARE LOCATED ON PRIVATE PROPERTY. TOTAL OCCUPANT LOAD OF 189 WHICH INCLUDES 19 STAFF.
   
03/18/15 
FC LUMBER SHED LLC / SEAN O JOHN
P1504295 / SUPPLEMENTAL
   
03/19/15 
FC LUMBER SHED LLC / DONALD V. ELLENBERGER
M1501405 / SUPPLEMENTAL
   
03/20/15 
LUMBER SHED LIC / ROBERT WATTS; LUMBER SHED LIC; ROBERT WATTS
E99575145 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1201 HALF ST SE   02/19/15
$ 9,000,000
WEST HALF RESIDENTIAL II LLC
 
N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0038 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0036 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
R N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0030 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0032 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
1275 HALF ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
HALF ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
M ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 


Project Directory




     © Copyright 2015 JD.