(a random before-and-after moment)
July 14, 2005
|
July 31, 2011
|
|
|
From the Post: "More than midway through the baseball season, the Washington Nationals' owners have failed to pay $3.5 million in rent for the District's new ballpark, contending that the state-of-the-art stadium is still incomplete. Besides withholding rent, the team is demanding damages of $100,000 a day, dating from March 1. The team and the city are also at odds over the timing of sales tax payments on tickets, with the Nationals paying game-by-game and the city wanting tax revenue from pre-sold ticket packages upfront." The dispute will be going to arbitration. UPDATE: Here's some additional details from Tim Lemke's blog at the WashTimes, including how Mayor Fenty reacted in it'll-all-work-out fashion today on WTOP. Ditto from the Post's DC Wire.
JDLand.com Home
Scott G says: (7/11/08 9:37 AM)
The Lerners are diobolically cheap. If they're not careful, they will destroy all good will and drive the team into the ground...
Ray N Rockville says: (7/11/08 9:59 AM)
I wonder what the Lerners would do if you were renting a concert hall from them and averaging almost 30,000 for 50 dates and refused to pay them rent like this? When you squeeze all the blood out of a turnip, you will have a dead beet.
Dale says: (7/11/08 11:05 AM)
The fans should sue the Lerners for fielding such a lousy baseball team. Evict the Nationals and send them back to RFK and let D.C. United move into the new stadium.
Joe 1961 Varnum Street says: (7/11/08 1:01 PM)
Soccer? Ewww. I don't think the Lerners are cheap, but I think they are wrong on this one. What's not done? Team offices? That lousy eye-sore called Florida Rock? Well, the team isn't "done" either. The "plan" is in its early stages.
Michael says: (7/11/08 11:38 PM)
Lets kick the Nats out and invite a minor league team...
BBC says: (7/13/08 1:48 AM)
The dispute is quite unfortunate. However, I am not ready to say it is all the Nat's fault. The DC city council has a notorious history. When Gray tried to bully the team into hanging political (taxation without representation) posters on the ballpark, that made me cringe. I hope that this dispute is something minor setback that has been blown way out of proportion. Blowing minor negative things out of proportion is what the news media is all about.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2017 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
1st-phase 380-unit apartment building, on old McDonald's site. Construction underway early 2017.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
1000 1st St. Residential
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1300 B/O WATER ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 02/18/19
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 02/17/19
|
400 B/O 2ND ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 02/16/19
|
70 B/O I ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 02/15/19
|
500 B/O L ST SE
|
| ROBBERY
| 02/14/19
|
1400 B/O SOUTH CAPITOL ST
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 02/13/19
|
1100 B/O 2ND PLACE SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 02/13/19
|
200 B/O I ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 02/13/19
|
200 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 02/11/19
|
100 B/O L ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 02/10/19
|
500 B/O L ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 02/09/19
|
1200 B/O HALF ST SE
|
| THEFT
Theft First Degree (theft From Building)
| 02/07/19
|
300 B/O L ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 02/07/19
|
1100 B/O NEW JERSEY AVE SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 02/05/19
|
1000 B/O 8TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 02/04/19
|
1100 B/O 1ST ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 02/02/19
|
1100 B/O NEW JERSEY AVE SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 01/25/19
|
900 B/O M ST SE
|
| ROBBERY
| 01/25/19
|
100 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 01/24/19
|
1100 B/O NEW JERSEY AVE SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 01/24/19
|
|
Recent Issued Building Permits
| Archive
|
|
1331 4TH ST SE CU
|
|
01/25/19
FC 1331 LLC / BEN BEDDO
TL1900054 /
CONSTRUCTION
First Extension to TL1700205, to Expire on 06 / 28 / 2019. Original Scope: New Tenant Layout for restaurant
|
4 I ST SE
|
|
01/31/19
USGBF WATERFRONT STATION LLC / TAMIKA STATON; OTIS
EN1900813 /
SHOP DRAWING
Install 2 New Elevators - 3500LBS @ 350FPM
|
|
|
01/31/19
USGBF WATERFRONT STATION LLC / TAMIKA STATON; OTIS
EN1900814 /
SHOP DRAWING
Install 1 New Elevator - 4000LBS @ 350FPM
|
2 I ST SE
|
|
01/28/19
MCDONALDS CORPORATION / ROGER LEE MOORE
M1901295 /
SUPPLEMENTAL
|
|
|
01/30/19
MCDONALDS CORPORATION / null
E1903887 /
SUPPLEMENTAL
|
150 I ST SE
|
|
01/31/19
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900205 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
|
|
|
01/31/19
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900206 /
SHOP DRAWING
Install 2 New Elevators - 3500LBS @ 350FPM
|
|
|
01/31/19
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900207 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
|
|
|
01/31/19
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900208 /
SHOP DRAWING
Install 1 New Elevator - 4000LBS @ 350FPM
|
|
|
01/31/19
WILLIAM C SMITH CO / TAMIKA STATON; OTIS
EN1900209 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 200FPM
|
|
|
02/04/19
SQUARE 737 LLC / RUSSELL M COX
B1904148 /
CONSTRUCTION
THIS PERMIT SERVES AS A REVISION TO B1709058 FOR ELEVATOR REVIEW ONLY
|
|
|
02/19/19
SQUARE 737 LLC / DANIEL R. RUDE
P1903909 /
SUPPLEMENTAL
(4) Fire pits (1) Water Coolers
(4) Rooftop units
Sanitary piping, Storm piping
|
250 M ST SE
|
|
01/29/19
SQ 769 LLC / ILAKKIYA THAMBI
AH1900470 /
CONSTRUCTION
Requesting after hour permit to CCTV the sewers
|
|
|
02/01/19
SQ 769 LLC / ILAKKIYA THAMBI
AH1900481 /
CONSTRUCTION
After hour permit to CCTV the sewers
|
|
|
02/15/19
SQUARE 769 LLC / STEVEN CHEN
AH1900542 /
CONSTRUCTION
After Hours Permit - Drilling of Piles
|
|
|
02/15/19
SQUARE 769 LLC / JENSEN HUGHES
MVQ1900481 /
CONSTRUCTION
NFPA 20
2010 EDITION, SECTION 4.12.2.1.1 AS REFERENCED BY 2012 IBC CODE SECTION 913.1.
BUILDING PERMIT B1813732
|
861 NEW JERSEY AVE SE
|
|
02/05/19
CONSOLIDATED RAIL CORPORATION / THOMAS M. KESSLER
P1903515 /
SUPPLEMENTAL
(2) Gas generators
|
520 TINGEY ST SE
|
|
02/01/19
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN
SB1900114 /
CONSTRUCTION
Three soil borings, six-inch diameter, 25 feet deep.
|
227 TINGEY ST SE
|
|
01/31/19
FOREST CITY WASHINGTON / TAMIKA STATON; OTIS
EN1900809 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
|
|
|
01/31/19
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900802 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
|
|
|
01/31/19
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900803 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
|
|
|
01/31/19
FOREST CITY WASHINGTON / TAMIKA STATON; OTIS
EN1900807 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 350FPM
|
|
|
01/31/19
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900808 /
SHOP DRAWING
Install New Elevator - 4000LBS @ 350FPM
|
|
|
01/31/19
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900799 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 200FPM
|
|
|
01/31/19
UNITED STATES OF AMERICA / TAMIKA STATON; OTIS
EN1900800 /
SHOP DRAWING
Install 1 New Elevator - 3500LBS @ 200FPM
|
|
|
01/31/19
FOREST CITY WASHINGTON / TAMIKA STATON; OTIS
EN1900806 /
SHOP DRAWING
Install 2 New Elevators - 3500LBS @ 200FPM
|
|
|
02/08/19
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
B1901392 /
CONSTRUCTION
Yards Parcel L1 - Revision to Building Permit # B1801074 to add build-out of hotel restaurants and bars, and to incorporate changes required by DC Water. Includes 1st floor restaurant with 132 indoor seats and 48-seat Summer Garden;1st floor bar with 59 seats and 24-seat Summer Garden; Rooftop Bar with 48 indoor seats; Rooftop restaurant with 67 indoor seats and 48-seat Summer Garden. TPR
|
|
|
02/08/19
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900513 /
CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private
property. Work to take place Friday, 2 / 8 / 19 and Saturday 2 / 9 / 19 between 7pm-10pm as well as Sunday, 2 / 10 / 19 between 10am-7pm.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
1117 3RD ST SE
|
12/06/18
$ 5,000,000
SQUARE 769 LLC WILLIAM C SMITH & CO INC
|
|
|
|