Since January, 2003
            
 Page Through from Before to After

Last night the Zoning Commission voted 5-0 to extend the allowed building height and expand the total square footage of the proposed office building at 250 M Street in what is technically a modification to the Capper/Carrollsburg second-stage PUD that this office building is part of. The building, which will be going for LEED silver certification and which will have ground-floor retail, will now be 130 feet high and have 233,405 square feet of space. The discussions at the hearing centered mainly on the penthouse structure, the "next generation" elevator technology that allows for less overhead space, and how exactly the agreement with ANC 6D should be viewed.
William C. Smith's Brad Fennell testified that the developer has agreed to additional amenities beyond those in the original PUD (which included $325,000 toward the funding of Canal Park). He described the new amenities as "recruiting construction workers from ANC 6D by purchasing quarterly ads in the Southwester, creating an overall goal of 20% first-source employment for qualified ANC 6D residents, and providing contracting and new hiring opportunitiess for local residents and subcontractors by giving tiebreaking preferences to subcontractors headquartered in ANC 6D and for qualified construction workers living in that area." On May 12 the ANC tied 3-3 on the project, but apparently some subsequent tweaking of the proffer into this final form resulted in a letter from the ANC indicating that four commissioners would support the project with these additional amenities. The Zoning Commissioners felt that, since this was not an official vote of the ANC, it couldn't be given the required "great weight," but could be looked at the same as any feedback from a neighborhood association. The fact that no ANC members appeared at the hearing to testify in opposition also was noted.
You can read the Office of Planning report for all the specifics you could ever want about the changes in the design; if you're really interested, you can also read the original second-stage PUD approval of 250 M from last July, that last night's ruling is modifying. (The original Capper PUD is worth a look as well if you aren't familiar with what's been approved for the area's redevelopment.) Also, since I haven't mentioned it lately, it should be noted that this office building is technically a joint venture between WC Smith and the DC Housing Authority, with the monies from it helping to "financially leverage" the rest of the redevelopment of the Cappers.
This was the first vote; final action on this modification will be scheduled for a month or so from now. Earlier this year a WC Smith representative had told me that construction could begin in the middle of this year, but there was no mention of start dates at the hearing.
Comments (0)
   
 
 More About M Street

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Roundup of Some: Very cool historical look at the neighborhood https://storymaps.arcgis.com/stori...
Jscott280 on Roundup of Some: Looks like the Hilton brothers are partnering with solace brewing for the retail...
JD on Roundup of Some: And these tidbits from Martin Austermuhle on Twitter: Yikes: Per data from D....
JD on Roundup of Some: This is why I remain extremely reticent to speak much of expected openings. h...
tmich93 on Roundup of Some: Just tried La Famosa yesterday and it was terrific. Their menu has terrific valu...
tmich93 on Roundup of Some: Sorry to hear that JD! Best wishes to your father during his recovery.
Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/22/20
600 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/21/20
1200 B/O VAN ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/19/20
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/16/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/20
200 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
1000 B/O 3RD PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/12/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/10/20
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/07/20
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/04/20
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/30/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/27/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 130   
09/08/20 
ASANA PARTNERS / KEE HAN KIM; W. SAKIE - BHAR; NA
SG2000328 / CONSTRUCTION
Install one set of building sign and one set of double side blade sign
1331 4TH ST SE CU   
08/28/20 
FC 1331 LLC / null
P2008455 / SUPPLEMENTAL
   
08/31/20 
FC 1331 LLC / null
E2010801 / SUPPLEMENTAL
   
09/01/20 
FC 1331 LLC / null
P2008520 / SUPPLEMENTAL
150 I ST SE   
09/10/20 
SQUARE 737 LLC / SHON THOMAS
AH2001871 / CONSTRUCTION
Placing mobile crane on 2nd Street SE for hoisting materials to 150 I Street SE and closing sidewalk for pedestrian safety
300 M ST SE   
09/11/20 
FEDERAL CENTER LP / HOSSEIN HAMED; WILLIAM G ROSENBERG; NA
SG2000379 / CONSTRUCTION
INSTALL TWO BUILDING MOUNTED LED-ILLUMINATED SIGNS W / FACE LIT CHANNEL LETTERS ON BACKER.
861 NEW JERSEY AVE SE   
09/08/20 
0861 NEW JERSEY AVE / null
M2003711 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
09/08/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2004497 / POST CARD
1013 O ST SE 20374   
09/14/20 
UNITED STATES OF AMERICA / JOHN BROWNING
SB2000494 / CONSTRUCTION
Install three temporary 1" groundwater monitoring wells down to 4' bsg in the basement of buildings 46 and 67 in the Washington Navy Yard for groundwater sampling. Wells will be removed less than 1 week following installation, and the voids will be filled with grout.
71 POTOMAC AVE SE   
09/03/20 
MRP REALTY / JUSTIN BELLOW
TL2000041 / CONSTRUCTION
1st time tenant fit out in new building
   
09/04/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BELLOW
B2007457 / CONSTRUCTION
Revision to B1804337 to revise the location of IZ units.
520 TINGEY ST SE   
08/31/20 
U. S. GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE
TN2000086 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed on Aug 4, 2020 - Jan 29, 2021 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.