Since January, 2003
            
 (a random before-and-after moment)
August 3, 2008
July 17, 2016
2nd (Mid) at I, Looking West-Southwest (see more)

Well, at least the "on-time" portion of the mantra still holds. From the Examiner: "The costs of acquiring land needed to build the Washington Nationals ballpark have exceeded original estimates by $50 million, busting the publicly financed stadium's $631 million budget with more increases yet to come, documents show. Thanks almost entirely to land acquisition, the tab for the stadium is now pegged at $674 million, an increase of $43.2 million over the original budget, according to a Jan. 16 report provided to the D.C. Council by the D.C. Sports and Entertainment Commission." Except that: "Land acquisition was not included in the stadium's $611 million price cap, meaning the sports commission can bridge the budget gap with excess revenues from the ballpark fund -- composed mainly of stadium sales taxes and a 1 percent tax on D.C. businesses. It also means that while the project is technically over budget, it has not breached the statutory cap."
Comments (3)
   
 
 More About Nationals Park
 All posts: Nationals Park

JDLand.com Home

Comments

Brewer says: (1/22/08 10:34 AM)
Ah hah! Now we know where all those Enron accountants went!


BC says: (1/22/08 5:19 PM)
Wow, those old land owners' greed really paid off. Even though they were offered soooo much more money than they paid for their properties, they screamed foul play anyway and got even more money. I wish someone would offer me millions of dollars for my little house ...except I would be greatful instead of demanding millions more.


Dick says: (1/22/08 6:34 PM)
JD: You reported this on December 9. Who needs to read the Examiner when you have JDLAND.com?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

RMP on Cosmopolitan Nail Lounge: Residence Inn has rates loaded on the Marriott website. Looks like the first dat...
snakegriffin on Eighteen Eight 'Fine: FYI, there are a couple of new (new to me, at least) renderings up here:
conngs0 on Cosmopolitan Nail Lounge: Yep, there are pluses and minuses to all big projects, and I agree with 202 that...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/13/17
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/08/17
100 B/O K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/06/17
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/02/17
700 B/O M ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/30/16
400 B/O M ST SE   THEFT
Theft First Degree (shoplifting)
 12/26/16
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/20/16
70 B/O I ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 12/19/16
500 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/18/16
1000 B/O 7TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/18/16
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/17/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/16/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 12/15/16

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/28/16 
LIDIA BARDI SQUARE 769N OWNER, LLC / LIDIA BARDI SQUARE 769N OWNER, LLC; GEORGE KING MORETRENCH AMERICAN CORPORATION
SB1700048 / CONSTRUCTION
Drill and construct three 6 inch diameter dewatering wells within 12 inch boreholes to 70 feet below existing grade via mud rotary drilling methods. Drill and construction 2 - 2 inch diameter observation wells within in 8 inch boreholes to 60 feet below existing grade via mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulations.
2 I ST SE   
12/27/16 
MCDONALDS CORPORATION / MCDONALDS CORPORATION; ECS MID-ATLANTIC LLC
SB1700081 / CONSTRUCTION
ECS proposes the installation of six soil borings to a maximum depth of 30 feet below ground surface. Each boring will be completed with a Geoprobe drill rig and grounted following installation using a DOEE approved grount mix.
28 K ST SE   
12/28/16 
23 LLC / RELATED COMPANIES; ACCUPERMIT LLC; ACCUPERMIT LLC
SG1700100 / CONSTRUCTION
Sign / mural to be on west elevation of new commercial building at 28 K Street SE. Temporary only for 12 months.
100 M ST SE   
12/28/16 
SQUARE 743 INC / null
E1702426 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20024   
12/30/16 
JBG/FEDERAL CENTER LLC / CARL E HAGER
E1702487 / SUPPLEMENTAL
   
01/04/17 
JBG/FEDERAL CENTER LLC / null
P1702555 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE   
01/05/17 
EXTREME STEEL CRANE AND RIGGING
AH1700321 / CONSTRUCTION
PLACE CRANE ON S. CAPITOL STREET TO PUT TOWER CRANE UP.
385 WATER ST SE 20003   
12/28/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1702437 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.