Since January, 2003
            
 Sliding from Before to After

Two bills of Near Southeast interest passed their first readings at today's city council meeting, on the consent agenda, no less. (Consent agenda = no discussion or bickering! Yay!) First was Bill 17-0448, which authorizes the closing of the public alley on Square 696 (bounded by Half, First, I, and K), and which had been interesting mainly for the affordable housing trust fund contribution discrepancy that came up during the bill's hearing a few weeks ago, when the developers noted that they expected their contribution to be in the neighborhood of $900,000 and the Office of Planning determined the required sum be closer to $8 million. Apparently the final bill calls for a $1.1 million contribution, which council chairman Vincent Gray said is the largest trust fund contribution ever as the result of an alley closing. The developers also have agreed to create a 20-foot-wide pedestrian right-of-way through the middle of the block to allow for easy access from I Street to the planned public plaza on K Street, though apparently DDOT requested that this right-of-way be upgradable for "motorized access" in the future if necessary. This alley closing will allow DRI Development to move forward with their plans for 800,000 square feet of office space in three buildings with 37,000 square feet of ground-floor retail. There've been noises that the first construction on the site could begin in the summer of 2008, but nothing official has been announced. (The last tenants on the block, in the cab garage at First and K, are expected to move out in February when their lease expires.)
Also passed today was Bill 17-0292, the Capper PILOT funding bill that I just wrote about in detail a couple days ago. This authorizes a bond issuance of up to $55 million that will yield close to $37 million to pay for infrastructure improvements at Capper/Carrollsburg. The bonds will then be repaid by landowners making payments in lieu of property taxes. I should mention that these PILOT funds won't only be repaid by residents of Capitol Quarter--there are two planned office developments totaling 750,000 square feet that are within the Capper PILOT area (600 M Street at the old Capper Seniors site and 250 M Street) that will generate PILOT payments.
Each bill will come before the council again in January for their final votes.
Comments (0)
   
 
 More About Capper

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Condos Confirmed: IMPORTANT ANNOUNCEMENT: Folks— if you have a dog, remember to clean up after it...
JD on Condos Confirmed: For about five minutes, yes.
Section314 on Condos Confirmed: Wasn't 1250 Half Street to be known as the Joule at one time?
RDC on Condos Confirmed: Got it, thanks JD
CJBabyDaddy on Condos Confirmed: @RMP: The Twelve12 at 1212 4th Street just tapped me on the shoulder and said, “...
JD on Condos Confirmed: They didn't sell them, at least not outright. Greystar Management is taking over...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/15/19
200 B/O WATER ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/14/19
UNIT B/O K ST SE   THEFT
Theft First Degree (theft From Building)
 01/12/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/11/19
1000 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 01/06/19
1300 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/04/19
900 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
200 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/29/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/28/18
700 B/O L ST SE   BURGLARY
Burglary Two
 12/28/18
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/26/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/18
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/25/18
300 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/24/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/23/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/22/18
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/20/18

Recent Issued Building Permits Archive  
926 4TH ST SE   
01/16/19 
null / NA NA NA
EHOP19950290 / HOME OCCUPATION
1346 4TH ST SE   
01/11/19 
ALAN OWINGS / SEV HENRY
AH1900404 / CONSTRUCTION
After Hours Work on Saturday (1 / 12 / 2019) and Sunday (1 / 13 / 2019) for the Following Operations Saturday, 1 / 12 / 2019 ---Interior Operations after 7PM Sunday, 1 / 13 / 2019 ---Interior Operations: 7AM-7PM ---Exterior Operations: 7AM-7PM ---Sitework Operations: 7AM-7PM
900 5TH ST SE   
01/02/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MATT HUPPMAN
D1900229 / CONSTRUCTION
the Berg Corporation has a project located at 900 5th Street SE that has suffered a major fire and is considered an emergency job. Twenty percent of original structure was immediately demolished following the fire for safety reasons. The Berg Corporation is now pursuing a demolition permit to remove the balance of the stick built portion of the structure. The following improvements are to ...
1000 5TH ST SE 1ST FL   
01/09/19 
UNITED STATES OF AMERICA / WALTER T JONES
E1903161 / SUPPLEMENTAL
1000 5TH ST SE   
12/27/18 
UNITED STATES OF AMERICA / TANYA HILL
B1902924 / CONSTRUCTION
DGS RENOVATION OF EXISTING WARMING KITCHEN AND FITNESS ROOM OF APPROXIMATELY 900 SF TO BECOME RESIDENTIAL GRADE DEMONSTRATION KITCHEN. RENOVATION OF EXISTING APPROXIMATELY 300 SF OPEN LOUNGE AND SOME DEMOLITION OF INTERIOR PARTITIONS, NEW FINISHES AND MEP. This permit dose not include the Child devolepment center, There work in this area.
   
01/02/19 
UNITED STATES OF AMERICA / null
P1902543 / SUPPLEMENTAL
   
01/11/19 
UNITED STATES OF AMERICA / KASMIN HOLT
AH1900407 / CONSTRUCTION
Work under permit E1903161 on starting at 7pm - 7am.
1005 5TH ST SE   
01/04/19 
ALEXANDRA H HARRIS / HOLLIE MASON
F1800763 / CONSTRUCTION
Requesting permit to add an ornamental black iron fence with gate, not to exceed three feet, enclosing / surrounding front yard area. Installation of the fence may require concrete footings. The fence will be the same as others in the neighborhood and one of the approved transparent designs approved by the HOA; "hairpin" front section and "picket" return sections with ball finials on posts. Sol...
150 I ST SE   
12/24/18 
MILLSTONE CORPORATION / CHRISTINE LONG
B1903052 / CONSTRUCTION
To temp attached material hoist to side of building
328 I ST SE   
01/11/19 
BRIAN HUSEMAN / MELVIN CRENSHAW
B1904212 / CONSTRUCTION
Remove and replace kitchen on 2nd floor and update electrical. Remove and replace bathroom on 3rd floor and update electrical. Total SQFT 248
401 L ST SE   
01/15/19 
MICHAEL R BRICKMAN / SHELBY FIGAROORE
P1902908 / SUPPLEMENTAL
250 M ST SE   
01/07/19 
SQUARE 769 LLC / BRIAN STROTT
SH1900002 / CONSTRUCTION
Support of excavation system for a nine story 188,000 GSF office building with three levels below grade located at 250 M St. SE.
   
01/08/19 
SQUARE 769 LLC / ROBERT HART
AH1900389 / CONSTRUCTION
After hours work permit for installation of DDOT approved TCP jersey barriers.
1200 NEW JERSEY AVE SE 20590   
01/03/19 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1900891 / CONSTRUCTION
INTERIOR RENOVATION TO 7TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND NEW STRUCTURAL HANGING PARTITION. 7581 SQUARE FEET. US DOT **LEVEL 2 ALTERATION
71 POTOMAC AVE SE   
01/08/19 
RIVERFRONT HOLDINGS II, LLC / MITCH A. PERMUY
E1902865 / SUPPLEMENTAL
   
01/10/19 
FORIDA ROCK PROPERTIES INC / DANIEL M. NARH
P1902751 / SUPPLEMENTAL
227 TINGEY ST SE   
12/26/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900354 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of dismantling the tower crane on private property. Work to take place Friday 1 / 18 – 7pm-10pm, Saturday 1 / 19 – 7pm-10pm, and Sunday 1 / 20 – 10am-7pm.
355 WATER ST SE   
12/24/18 
UNITED STATES OF AMERICA / KAYLIE ROLIN
TN1900028 / CONSTRUCTION
(1) 30 x 70 ft tent (1) 7k watt gas generator
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.