Since January, 2003
            
 Sliding from Before to After

When word broke a few days back that Monument Realty had lost the bidding for the WMATA Southeastern Bus Garage site at Half and M, the Post described a letter from Monument principal partner Jeffrey T. Neal to WMATA that threatened a slow-down in Monument's work on the renovation and expansion of the Navy Yard Metro station if the company was not awarded the garage site as it felt it had been promised. (It has also been reported that Monument is already seven weeks behind schedule on the project.) This station is of course the lynchpin of the city's plans to get stadium-goers to and from Nationals Park, particularly in the near-term before the parking situation is sorted out.
Now, with Monument's plans for developing the old Randall School site on I Street in Southwest about to come up before the Zoning Commission, ANC6D vice chairman Andy Litsky has written a sternly worded letter to representatives of Monument and its Randall partner the Corcoran Gallery of Art, cc'ed to Tommy Wells and WMATA board members Jim Graham and Marion Barry, that boils down to this: "[U]nless Mr. Neal and Monument Realty withdraw this threat -- in writing and in advance of our vote on Monday night -- I will oppose this PUD at the ANC and in testimony before the Zoning Commission." He goes on to say: "The time has finally come for District residents and policy makers to stand up to developers who use threats and lawsuits as leverage in one part of the city and yet expect -- and often receive -- support for their special projects, PUDs and city tax incentives in another. Enough is enough."
You can read the entire letter here (I PDF'ed the e-mail without the headers so as not to blab a bunch of e-mail addresses to the world). The ANC meets on October 15; the Zoning Commission hearing is Nov. 8.
Comments (0)
   
 
 More About staddis

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Condos Confirmed: Trapeze School news from the Jan 23 ANC meeting: Brookfield (the artist formerl...
jdc on Condos Confirmed: 202's link had an error - try this https://www.bisnow.com/washington-dc/news/mix...
202_cyclist on Condos Confirmed: It’s SWTLQTC territory but there are plans to build on the large property immedi...
JD on Condos Confirmed: Thx, jdc. It's fixed.
jdc on Condos Confirmed: JD - the link to the Avidian in the post is broken.
202_cyclist on Condos Confirmed: IMPORTANT ANNOUNCEMENT: Folks— if you have a dog, remember to clean up after it...
Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/19/19
100 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/19/19
1200 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/15/19
200 B/O WATER ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/14/19
UNIT B/O K ST SE   THEFT
Theft First Degree (theft From Building)
 01/12/19
1000 B/O 8TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/11/19
1000 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 01/06/19
1300 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/04/19
900 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/03/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/30/18
200 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/29/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/28/18
700 B/O L ST SE   BURGLARY
Burglary Two
 12/28/18
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/26/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/18
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/25/18
300 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/24/18

Recent Issued Building Permits Archive  
926 4TH ST SE   
01/16/19 
null / NA NA NA
EHOP19950290 / HOME OCCUPATION
1331 4TH ST SE CU   
01/22/19 
FC 1331 LLC / null
P1903139 / SUPPLEMENTAL
1346 4TH ST SE   
01/11/19 
ALAN OWINGS / SEV HENRY
AH1900404 / CONSTRUCTION
After Hours Work on Saturday (1 / 12 / 2019) and Sunday (1 / 13 / 2019) for the Following Operations Saturday, 1 / 12 / 2019 ---Interior Operations after 7PM Sunday, 1 / 13 / 2019 ---Interior Operations: 7AM-7PM ---Exterior Operations: 7AM-7PM ---Sitework Operations: 7AM-7PM
900 5TH ST SE   
01/02/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MATT HUPPMAN
D1900229 / CONSTRUCTION
the Berg Corporation has a project located at 900 5th Street SE that has suffered a major fire and is considered an emergency job. Twenty percent of original structure was immediately demolished following the fire for safety reasons. The Berg Corporation is now pursuing a demolition permit to remove the balance of the stick built portion of the structure. The following improvements are to ...
1000 5TH ST SE 1ST FL   
01/09/19 
UNITED STATES OF AMERICA / WALTER T JONES
E1903161 / SUPPLEMENTAL
1000 5TH ST SE   
12/27/18 
UNITED STATES OF AMERICA / TANYA HILL
B1902924 / CONSTRUCTION
DGS RENOVATION OF EXISTING WARMING KITCHEN AND FITNESS ROOM OF APPROXIMATELY 900 SF TO BECOME RESIDENTIAL GRADE DEMONSTRATION KITCHEN. RENOVATION OF EXISTING APPROXIMATELY 300 SF OPEN LOUNGE AND SOME DEMOLITION OF INTERIOR PARTITIONS, NEW FINISHES AND MEP. This permit dose not include the Child devolepment center, There work in this area.
   
01/02/19 
UNITED STATES OF AMERICA / null
P1902543 / SUPPLEMENTAL
   
01/11/19 
UNITED STATES OF AMERICA / KASMIN HOLT
AH1900407 / CONSTRUCTION
Work under permit E1903161 on starting at 7pm - 7am.
1005 5TH ST SE   
01/04/19 
ALEXANDRA H HARRIS / HOLLIE MASON
F1800763 / CONSTRUCTION
Requesting permit to add an ornamental black iron fence with gate, not to exceed three feet, enclosing / surrounding front yard area. Installation of the fence may require concrete footings. The fence will be the same as others in the neighborhood and one of the approved transparent designs approved by the HOA; "hairpin" front section and "picket" return sections with ball finials on posts. Sol...
328 I ST SE   
01/11/19 
BRIAN HUSEMAN / MELVIN CRENSHAW
B1904212 / CONSTRUCTION
Remove and replace kitchen on 2nd floor and update electrical. Remove and replace bathroom on 3rd floor and update electrical. Total SQFT 248
401 L ST SE   
01/15/19 
MICHAEL R BRICKMAN / SHELBY FIGAROORE
P1902908 / SUPPLEMENTAL
250 M ST SE   
01/07/19 
SQUARE 769 LLC / BRIAN STROTT
SH1900002 / CONSTRUCTION
Support of excavation system for a nine story 188,000 GSF office building with three levels below grade located at 250 M St. SE.
   
01/08/19 
SQUARE 769 LLC / ROBERT HART
AH1900389 / CONSTRUCTION
After hours work permit for installation of DDOT approved TCP jersey barriers.
1200 NEW JERSEY AVE SE 20590   
01/03/19 
JBG/FEDERAL CENTER LLC / SAM HOLLEN
B1900891 / CONSTRUCTION
INTERIOR RENOVATION TO 7TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP, LIFE SAFETY AND NEW STRUCTURAL HANGING PARTITION. 7581 SQUARE FEET. US DOT **LEVEL 2 ALTERATION
71 POTOMAC AVE SE   
01/08/19 
RIVERFRONT HOLDINGS II, LLC / MITCH A. PERMUY
E1902865 / SUPPLEMENTAL
   
01/10/19 
FORIDA ROCK PROPERTIES INC / DANIEL M. NARH
P1902751 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.