Since January, 2003
 (a random before-and-after moment)
December 3, 2011
January 31, 2015
1st at N, Looking Northeast (see more)

Today I was able to take some photos from up high at the Courtyard by Marriott--since it was a clear day, I could indeed see forever. First off, with the Capper/Carrollsburg demolition west of 5th Street now complete, I've posted before-and-after photos of the Capper footprint that illustrate the astonishing difference 10 months and six blocks' worth of demolition can make; this page also has new photos as you scroll down showing ground-level shots of the final demolished block north of K between 2nd and 3rd. Next are photos-from-above of the holes in the ground at 70/100 I and 100 M/Onyx, with comparison shots from last year (scroll down a bit from the top of the page). And, if you can bear to scroll ALL the way to the bottom, I have views of the Nats ballpark construction from this Courtyard vantage point--it's pretty much like looking into the stadium from dead center field, except four blocks away. And, at the top of the Capper Seniors page, there's a neat shot of all three Capper Seniors buildings. Alas, now I will have to return to taking boring street-level shots for a while....
 
 More About Nationals Park

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Alex B. on Capper 'Flexibility' Gets: <i>A true mixed community with people of different backgrounds, socio-econ...
tspaquin on Capper 'Flexibility' Gets: And it's not the appearance or upkeep of the building that's the greatest concer...
tspaquin on Capper 'Flexibility' Gets: @JHUGrad -- I would give it 15 to 20 years, but of course it will be too late to...
tspaquin on Capper 'Flexibility' Gets: The seniors building, in my view, does get a pass because the housing needs of s...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 02/27/15
1000 B/O 4TH ST SE   THEFT F/AUTO
 02/27/15
100 B/O CANAL ST SE   THEFT
2nd Degree
 02/24/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 02/19/15
1000 B/O 2ND ST SE   THEFT F/AUTO
 02/18/15
100 B/O K ST SE   THEFT F/AUTO
 02/06/15
UNIT B/O K ST SE   THEFT F/AUTO
 02/01/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1011 1ST ST SE   
02/12/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1265 1ST ST SE   
02/10/15 
CAPITAL RIVERFRONT HOTEL LLC / JOHN HOMICK
E1502866 / SUPPLEMENTAL
1000 5TH ST SE   
02/24/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1412422 / CONSTRUCTION
NEW BUILDING PERMIT FOR NEW COMMUNITY CENTER INCLUDING STEEL STRUCTURE BRICK AND MASONRY BACKUP
1240 12TH ST SE   
02/19/15 
WASHINGTON GAS LIGHT CO / CARLTON W ROBINSON
E1503465 / SUPPLEMENTAL
909 HALF ST SE   
02/25/15 
23 I LLC C/O RELATED COMPANIES / DAVID MILLER
SB1500157 / CONSTRUCTION
INSTALLATION AND MONITORING OF 8 INCLINOMETER MONITORING SYSTEMS. THREE INCLINOMETER CASINGS TO BE INSTALLED ALONG THE K STREET BORDER OF THE PROJECT. THREE CASINGS TO BE INSTALLED ALONG THE I STREET BORDER OF THE PROJECT. TWO CASINGS TO BE INSTALLED ALONG THE HALF STREET BORDER OF THE PROJECT.
   
02/23/15 
23 I LLC C/O RELATED COMPANIES / 23 I LLC C/O RELATED COMPANIES; ANDREW DANCE
SB1500132 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL UP TO 30 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 OD / 8 1 / 4 ID BOREHOLE TO A DEPTH OF 65 FEET. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED A 1 HP TURBINE SUBMERSIBLE PUMP. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLING TANK AND DISCHARGED TO THE LO...
1015 HALF ST SE   
02/09/15 
HALF ST SE LLC /
P1503333 / SUPPLEMENTAL
   
02/12/15 
THOMAS AN / THOMAS AN; HYH ELECTRIC CO. INC.
SG1500156 / CONSTRUCTION
INSTALL ONE SINGLE FACE BUILDING SIGN AND ONE DOUBLE FACE BLADE SIGN
   
02/10/15 
EVAN OBRIEN / JOSEPH ABRESCH; EVAN OBRIEN; ROBERT HUNSBERGER
E74054014 / SUPPLEMENTAL
   
02/18/15 
HALF ST SE LLC / STEPHEN R. HOLMAN
P1503532 / SUPPLEMENTAL
82 I ST SE   
02/09/15 
GREYSTAR RCP DEVELOPMENT / KIM MITCHELL CDKM CONSULTING LLC
SH1400084 / CONSTRUCTION
SHEETING & SHORING WORK FOR NEW 13-STORY RESIDENTIAL PROJECT AT EYE STREET AND NEW JERSEY AVE SE
50 M ST SE   
02/18/15 
ENGLEWOOD LLC / FVI2020
FD1500010 / CONSTRUCTION
FOUNDATION OF GRADE RELATED TO CONSTRUCTION OF A NEW HOTEL
55 M ST SE   
02/24/15 
HINES GLOBAL REIT 55 M STREET LLC / ANDREW P CARAYIANNIS
M1501184 / SUPPLEMENTAL
100 M ST SE   
02/11/15 
SQUARE 743 INC. / JOHN GIUSEPPE-RAMCO
TL1500062 / CONSTRUCTION
FIRST TIME TENANT TO BUILDOUT AND OCCUPY TENANT SPACE ON PART OF THE 7TH FLOOR THE TRUST FOR PUBLIC LAND AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. .PLUMB. ELECT. FIRE PROTECTION AND ARCHITECTURAL PLANS BY KTA. INTERIOR WORK ONLY. NO CHANGE IN USE. NO STRUCTURAL WORK INVOLVED.
   
02/13/15 
SQUARE 743 INC / RONNIE E WRIGHT
E1503331 / SUPPLEMENTAL
   
02/13/15 
SQUARE 743 INC / DAVID FLEMING
P1503495 / SUPPLEMENTAL
   
02/19/15 
SQUARE 743 INC / DAVID FLEMING
P1503597 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / GREGORY E LIGON
E1503498 / SUPPLEMENTAL
   
02/23/15 
SQUARE 743 INC / ANTHONY G SAMBURG
E1503518 / SUPPLEMENTAL
901 M ST SE   
02/19/15 
US GOVERNMENT NAVY PWC / SUMMIT CONSTRUCTION AND ES
B1504570 / CONSTRUCTION
REQUEST AND E&S PERMIT FOR WORK ON FEDERAL INSTALLATION. INSTALLING FOOTINGS AND SLAB WITH PORTCH SUPPORTS. MINOR GRADING AND SEEDING. BUILDING FOOTPRINT IS UNDER 700SF. LAND DISTURBANCE INCLUDING GRADING AND SEEDING IS UNDER 2 500SF.
100 M ST SE   
02/19/15 
SQUARE 743 INC / JOHN H THOMSON
E1503464 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
300 M ST SE   
02/11/15 
FEDERAL CENTER LP / SAM HOLLEN RAMCO OF DC INC.
B1504255 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR CONFERENCE ROOM. PARTITIONS FINISHES MECHANICAL ELECTRICAL AND LIFE SAFETY. ICI SERVICES
1201 M ST SE   
02/11/15 
CSC / DAMON ELLIS
B1503731 / CONSTRUCTION
SCOPE OF WORK AREA IS 800SQFT TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND FIRE. NO CHANGE OF USE OR STRUCTURAL WORK BEING DONE
800 NEW JERSEY AVE SE   
02/24/15 
NEW JERSEY AT H LLC / JOHN H THOMSON
E1503556 / SUPPLEMENTAL
   
02/13/15 
BAKER DC / CHRISTINE LONG
AH1500246 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM
1000 NEW JERSEY AVE SE   
02/23/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / SHAWN ALEX HELLER
HO1500118 / HOME OCCUPATION
HOME OFFICE (LAW OFFICE).
300 TINGEY ST SE   
02/13/15 
RICHARD CERVERA / NATHANIEL GILL
B1504014 / CONSTRUCTION
NEW SUMMER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.