Since January, 2003

Ad by Google
 (a random before-and-after moment)
July 16, 2009
October 5, 2014
4th at Tingey, Looking North-Northeast (see more)

Tonight the Zoning Commission is having a public hearing on case 06-25, a text amendment to the Capitol Gateway Overlay that would include the west side of South Capitol Street in the CG Overlay and also establish a ZC review and approval process for new developments that abut South Capitol (as is currently the case for new projects along M Street). The Capitol Gateway Overlay spells out in extreme detail exactly what the requirements are for developments along South Capitol, M, and in the Ballpark District and over to Buzzards Point, and I suggest that anyone who is interested (or concerned) about the type of development that may be coming to Near Southeast should pour themselves 9 or 10 cups of coffee and read this document. (It's not a complete version because one doesn't currently seem to exist, I cobbled this together from various ZC documents.) The preamble is worth highlighting, to see how the city has spelled out what it envisions for the area:
The purposes of the CG Overlay District are to:
(a) Assure development of the area with a mixture of residential and commercial uses, and a suitable height, bulk and design of buildings, as generally indicated in the Comprehensive Plan and recommended by planning studies of the area;
(b) Encourage a variety of support and visitor-related uses, such as retail, service, entertainment, cultural and hotel or inn uses;
(c) Allow for continuation of existing industrial uses, which are important economic assets to the city, during the extended period projected for redevelopment;
(d) Provide for a reduced height and bulk of buildings along the Anacostia riverfront in the interest of ensuring views over and around waterfront buildings, and provide for continuous public open space along the waterfront with frequent public access points; and
(e) Require suitable ground-level retail and service uses and adequate sidewalk width along M Street, S.E., near the Navy Yard Metrorail station.
From there, you are treated to pages and pages and pages of very specific requirements set out for developers (i.e., items like "Each new building shall devote not less than thirty-five percent (35%) of the gross floor area of the ground floor to retail, service, entertainment, or arts uses ("preferred uses") [...]; provided, that the following uses shall not be permitted: automobile, laundry, drive-through accessory to any use, gasoline service stations, and office uses (other than those accessory to the administration, maintenance, or leasing of the building). Such preferred uses shall occupy 100% of the building's street frontage along M Street, except for space devoted to building entrances or required to be devoted to fire control.")
There is also a separate Southeast Federal Center Overlay, again laying out much detail about what is required and allowed for that development. There's even a great map on the last page that clearly shows the allowed uses, with the 5.4-acre waterfront park and residential-zoned areas being closest to the water (so there's no plan in place to allow office buildings right on the water or even near it; the commercial zones of the SEFC are all along First Street and M Street).
I think even just casual browsing through these documents can be a bit of an eye-opener for people (like me) who don't realize exactly how many requirements are already in place for these two areas. Of course, developers can ask for relief from certain rules (or the city council can just override the ZC altogether), but having documents such as these are a solid foundation. So it's good to know what's in them.
UPDATE: (like you're still reading) The Case 06-25 CG Overlay text amendment hearing was over last night in a flash; the record is being held open until Nov. 30, with action most likely to be taken at the ZC's Dec. 11 meeting.
Comments (0)
   
 
 More About staddis

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
conngs0 on Reports of an: Looks like the "all clear" has been given. What a relief! Glad it wa...
JD on More Zoning News: And in other news, 909 Half got its foundation permit yesterday.
JD on New Residential, Retail: No, the movie theater will be down closer to the water, east of the ballpark: ...
S.B. on New Residential, Retail: Is this where they are planning to put the movie theater? I haven't heard any n...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
500 B/O M ST SE   THEFT F/AUTO
 06/28/15
1000 B/O 1ST ST SE   THEFT
2nd Degree - Parking Lot/ Garage
 06/28/15
1100 B/O NEW JERSEY AVE SE   THEFT
 06/28/15
400 B/O M ST SE   THEFT
2nd Degree - Grocery/ Supermarket
 06/25/15
300 B/O TINGEY ST SE   THEFT
 06/24/15
900 B/O 3RD ST SE   THEFT F/AUTO
Theft From Auto 1 - / Unknown
 06/23/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree - Construction Site
 06/23/15
1100 B/O 1ST ST SE   THEFT
2nd Degree - Residence/ Home
 06/22/15
1000 B/O K ST SE   MOTOR VEHICLE THEFT
Unauthorized Use Of Vehicle
 06/22/15
1100 B/O 1ST ST SE   THEFT F/AUTO
- Parking Lot/ Garage
 06/21/15
1000 B/O 8TH ST SE   THEFT F/AUTO
 06/20/15
800 B/O L ST SE   THEFT F/AUTO
 06/20/15
   THEFT
2nd Degree
 06/19/15
54 B/O M ST SE   THEFT F/AUTO
 06/19/15
400 B/O M ST SE   ASSAULT W/DANGEROUS WEAPON
Adw -- Other Dangerous Weapon - Public Housing Project
 06/19/15
400 B/O M ST SE   THEFT
 06/14/15
K & HALF ST SE   THEFT F/AUTO
 06/11/15
1300 B/O 4TH ST SE   ASSAULT W/DANGEROUS WEAPON
 06/11/15
UNIT B/O K ST SE   THEFT F/AUTO
 06/11/15
VIRGINIA AVE & 8TH ST SE   THEFT F/AUTO
 06/10/15
8TH & L ST SE   THEFT F/AUTO
 06/10/15
500 B/O M ST SE   THEFT
 06/09/15
1100 B/O 1ST ST SE   THEFT
 06/09/15
900 B/O NEW JERSEY AVE SE   THEFT
 06/07/15
L & HALF ST SE   MOTOR VEHICLE THEFT
 06/06/15
900 B/O 5TH ST SE   THEFT F/AUTO
 06/03/15
700 B/O L ST SE   THEFT
 06/03/15
1200 B/O NEW JERSEY AVE SE   THEFT
 06/03/15

Recent Issued Building Permits Archive  
1011 1ST ST SE   
06/24/15 
NA NA NA
EHOP1590680 / HOME OCCUPATION
1265 1ST ST SE   
06/25/15 
HAMPTON INN / TIM MEALEY SIGNS; NONE
SG1500270 / CONSTRUCTION
INSTALL SIGN 37.3 FT X 4FT INSTALL 1'X9' SIGN ABOVE THE DOOR
1277 1ST ST SE   
06/23/15 
ANCHOR CONSTRUCTION
AH1500523 / CONSTRUCTION
EXCAVATION CATCH BASINS MANHOLE INSTALLATION SEWER MAIN LINE SEWER SERVICE LATERAL
1331 2ND ST SE   
06/29/15 
CORMAN CONSTRUCTION
AH1500543 / CONSTRUCTION
TUNNEL BORING MACHINE ? EQUIPMENT
1000 5TH ST SE   
06/17/15 
DISTRICT OF COLUMBIA /
P1506682 / SUPPLEMENTAL
909 HALF ST SE   
06/29/15 
23 I LLC C/O RELATED COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
FD1500043 / CONSTRUCTION
FOUNDATION-TO-GRADE ONLY UNDER THIS TPR / PROJECTDOX SUBMISSION.
82 I ST SE   
06/23/15 
CSX TRANSPORTATION INC / MILLER?LONG
TC1500024 / CONSTRUCTION
TOWER CRANE FOR JOBSITE USE
   
06/25/15 
CRANE SERVICE CO / CHRISTINE LONG
AH1500530 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 4:00AM THRU 9:00PM
125 L ST SE   
06/26/15 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1500526 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 4AM SATURDAY THRU 9PM SUNDAY
55 M ST SE   
06/16/15 
HINES GLOBAL REIT 55 M STREET LLC / DENNIS R. WOODE
E1506693 / SUPPLEMENTAL
   
06/17/15 
HINES GLOBAL REIT 55 M STREET LLC /
P1506705 / SUPPLEMENTAL
80 M ST SE   
06/19/15 
WELLS REIT II 80 M STREET LLC /
P1506802 / SUPPLEMENTAL
50 M ST SE   
06/19/15 
WASHINGTON DC / FRANCISCO CRANERENTAL CO.
AH1500511 / CONSTRUCTION
AFTER HOURS PERMIT TO WORK SATURDAY 5AM TO 7PM SUNDAY INCONJUNCTION WITH D-DOT PERMIT # 10194482
55 M ST SE   
06/16/15 
HINES GLOBAL REIT 55 M STREET LLC / DENNIS R. WOODE
E1506692 / SUPPLEMENTAL
   
06/17/15 
HINES GLOBAL REIT / JOHN KITTELBERGER; HINES GLOBAL REIT; JOHN KITTELBERGER
P65815829 / SUPPLEMENTAL
80 M ST SE   
06/16/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E70224790 / SUPPLEMENTAL
400 M ST SE   
06/17/15 
EDGEWOOD MANAGEMENT CORP.
B1508977 / CONSTRUCTION
FIRE DAMAGE REPAIR TO ORIGINAL CONDITION .ALL INTERIOR WORK NO STRUCTURAL DAMAGE. REMOVE AND REPLACE AS NEEDED DRYWALL DISCONNECT RECONNECT PLUMBING FIXTURES . REWIRE AS NEEDED IF NEEDED FINISHES AND PAINT.
800 NEW JERSEY AVE SE   
06/18/15 
BAKER DC / CHRISTINE LONG
AH1500510 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM7:00PM THRU 7:00AM MONDAY THRU SUNDAY
1000 NEW JERSEY AVE SE   
06/25/15 
DANIEL WHITE
PC41402425 / POST CARD
INSTALLATION OF NOT MORE THAN 10 NEW OUTLETS AND NOT MORE THAN 10 NEW LIGHTING FIXTURES FOR A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
1100 NEW JERSEY AVE SE   
06/30/15 
DC WATER
AH1500545 / CONSTRUCTION
INSTALLING AND MAINTAINING FLOW METERS AT SPECIFIC MANHOLES ON THE STREET AT 1100 BLOCK OF NEW JERSY AVE SE AND ALONG BEACH DRIVE NW STREET FROM 7PM TO 7AM MONDAY TO FRIDAY FROM 07 / 06 / 15 TO 07 / 01 / 16
1111 NEW JERSEY AVE SE   
06/15/15 
MILLER?LONG
AH1500500 / CONSTRUCTION
AFTER HOURS TO POUR CONCRETE ON JOBSITE 6 / 16 / 2015 FROM 4AM TO 9PM
   
06/23/15 
MILLER?LONG
TC1500021 / CONSTRUCTION
TOWER CRANE FOR JOBSITE USE
1236 SOUTH CAPITOL ST SE   
06/16/15 
1244 SOUTH CAPITOL RESIDENTIAL LLC / WILLIAM G WATT
E1506682 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE   
06/17/15 
1244 SOUTH CAPITOL RESIDENTIAL LLC C/O THE JBG COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
B1508279 / CONSTRUCTION
APPLICATION IN SUPPORT OF A TEMPORARY CERTIFICATE OF OCCUPANCY ALLOWING A POP-UP FOOD VENDOR TO SELL PREPARED FOODS INCLUDING BEER AND WINE ON A PRIVATE VACANT FORMER GAS STATION LOT ADJACENT TO THE NATIONAL'S STADIUM. CERTIFICATE WILL GAVE AN EXPIRATION DATE OF OCTOBER 5TH 2015. NO ALTERATION OR REPAIR WORK NEEDED FOR THIS USE OTHER THAN THE ERECTION OF 2 TEMPORARY 10'X10' TENTS.
   
06/19/15 
244 SOUTH CAPITOL RESIDENTIAL LLC C/O THE JBG COMPANIES / PITTINGER-DUNHA CAPITOL PERMITS
D1500624 / CONSTRUCTION
DEMOLITION OF A FREESTANDING CANOPY FROM VACANT LOT.
1500 SOUTH CAPITOL ST SE   
06/12/15 
WASHINGTON NATIONALS / KRISTINA DELGADO
B1506910 / CONSTRUCTION
INTERIOR ALTERATION TO CONVERT THREE SMALL SUITES INTO ONE LARGE SUITE
   
06/15/15 
WASHINGTON NATIONALS /
P1506602 / SUPPLEMENTAL
   
06/16/15 
NATIONALS PARK / RANDAL COX; NATIONALS PARK; RANDAL COX
E24923456 / SUPPLEMENTAL
   
06/17/15 
WASHINGTON NATIONALS / STEPHEN J. EXELBERT
P1506712 / SUPPLEMENTAL
   
06/17/15 
NATIONALS PARK / NATIONALS PARK; GEORGE DELGADO
F1500177 / CONSTRUCTION
REPLACEMENT OF 6 EXISTING FENCES AND GATES.
   
06/17/15 
NATIONALS PARK / GEORGE DELGADO
B1504325 / CONSTRUCTION
REMOVING EXISTING EXTERIOR CUSTOM ENTRY EXIT SWING GATES AND REPLACING THEM WITH PERIMETER SECURITY MAGNETOMETER IN CUSTOM ENTRY GATES SYSTEM.
   
06/19/15 
WASHINGTON NATIONALS / KRISTINA DELGADO
B1506810 / CONSTRUCTION
INSTALL A NEW PIZZA OVEN TO REPLACE EXISTING STONE COUNTER AND REFRESH ADJACENT FINISHES
   
06/23/15 
HEE YEOL HWANG
E1506849 / SUPPLEMENTAL
   
06/23/15 
WASHINGTON NATIONALS / WILLIAM P SAUREST
P1506904 / SUPPLEMENTAL
   
06/23/15 
LERNER / GEORGE DELGADO
B1509214 / CONSTRUCTION
FIRE ALARM WORK
   
06/23/15 
LERNER ENTERPRISES / NELSON TYLER SR; LERNER ENTERPRISES; NELSON TYLER
G94674970 / SUPPLEMENTAL
   
06/23/15 
LERNER ENTERPRISES / NELSON TYLER; LERNER ENTERPRISES; NELSON TYLER
P39325856 / SUPPLEMENTAL
   
06/27/15 
KRISTINA DELGADO / KRISTINA DELGADO; KRISTINA DELGADO; PHIL HAUHN
E79532492 / SUPPLEMENTAL
301 WATER ST SE   
06/18/15 
ATHUR LI / ALTAMERA GROUP / PETER NETTELBEC TEASS-WARREN ARCHITECTS
TL1500091 / CONSTRUCTION
NEW TENANT LAYOUT OF EXISTING CORE AND SHELL SPACE PERMITTED UNDER B1306803 / ZC #08-04A FOR A NEW RESTAURANT {PIZZA KIOSK} IN TENANT SPACE A WORK TO INCLUDE NEW MECHANICAL ELECTRICAL AND PLUMBING.
   
06/25/15 
FC LUMBER SHED LLC /
P1507016 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
M ST   04/10/15
$ 20,000,000
25 M STREET HOLDINGS LLC JOHN AKRIDGE COMPANIES
 


Project Directory




     © Copyright 2015 JD.