Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 70/100 I
See JDLand's 70/100 I Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


77 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

I don't dare tally up how many photos I've taken over the past 12 months, but suffice to say it's a lot. That didn't stop me from a quick lunchtime trek around the neighborhood to grab my final pictures of 2008, with a starkly blue sky as an end-of-year gift. Here's a boatload of before-and-afters for your perusal:
I started at Capitol Quarter, where the first three townhouses at Fourth and L are already framed, wrapped, and window'ed (I imagine the developers are trying to get those units finished as close to "on schedule" as possible). Here's the before-and-afters for the intersection's southwest corner; be advised that taking southward-facing photos in winter is no fun at all, so apologies for all glare, skipped angles, etc.

I next ventured to The Yards (USDOT security guards be damned!) for updated photos of the Foundry Lofts construction, where most of the framing of the two new top floors appears to be finished. And both Third and Tingey streets are now nicely paved and curbed, which you can see along with the Foundtry Lofts construction in these Third and Tingey photos, and also in shots from one block west, at what someday will be Second and Tingey. And, for the heck of it, here's a few new New Jersey and Tingey images. (Remember to look for the icon, as always.)
And, acting on tips from alert readers, I checked out the Third and K Market, which is now being gutted. There was no one around to answer any questions as to what is up, but seeing work getting done a few months after a For Rent sign went up (and quickly disappeared) would seem to be a good sign....?

I also went to First and M, where workers at 100 M have now given back one lane of M Street and told me that the median east of First will be rebuilt soon (as the one west of M recently was). The silver bullding against the unbelievably blue sky makes for a nice tableau in these updated photos.
There are also a few updated shots of 909 New Jersey, taken mainly from the First and I intersection, which is also notable for the nice little fence and landscaping that's now gone in across the empty lot to the east of 100 I, visible in many of these new photos.

Will that tide everyone over until the new year? I know I'm now good for a while....!
 

(It's a guarantee that as soon as I put up a "I won't be posting for a while" entry, something comes down the pike.) As part of the four-day party-packed inauguration celebration, there's going to be a Capitol Riverfront Gala, officially entitled "Sunday Night on the Hill," on January 18 at 70 I Street (the Jefferson at Capitol Yards). Food will be provided by Eighth Street's Cafe 8, and music by "international DJ TFresh." The festivities will start at 8:30 pm, in both indoor and "heated outdoor" spaces (maybe this includes the roof?). Tickets are $110 (which includes food and an open bar), with discounts available for active military members in uniform. Dress code is "creative black tie."
For more information, check the official web site, and the FAQ.
Comments (0)
More posts: 70/100 I, inauguration09, jpi
 

Piling a bunch of stuff together, again:
* Just posted on its Housing Complex blog (and in this week's print edition), the City Paper takes a look at the "Capitol Riverfront," both in the attempts to brand the neighborhood and in how empty it currently is (the subhed for the piece says "Developing a Name for the Southeast Waterfront Is Easier Than Actually Developing It" ).
UPDATE: I should also mention that Housing Complex has also posted occupancy numbers for the new buildings in Near Southeast: 70 and 100 I are 18 and 14 percent leased, Onyx is at 8 percent, Capitol Hill Tower is at 75 percent, Capitol Quarter Phase I is sold out, and Velocity is 25 percent sold.
* Reader J. reported yesterday that interior work seems to have begun at the old dialysis building at 900 M Street. They're rehabbing the interior and the exterior to create three retail storefronts, though no tenants have been announced yet.
* The Douglass Bridge is having another early-Sunday-morning-closure on the 14th.
* Planners are trying to figure out where to put all the charter buses coming to town for the inauguration. I'm guessing that the surface parking lots all around Near Southeast are going to be pretty enticing.
* The WBJ picks up on what I reported last week about 810-816-820 Potomac Avenue going up for sale in a sealed bid.
* One more add: Dr. Gridlock reports that Metro will be testing more eight-car trains on the Green line.
 

Now here's some quick-thinking: "With high-end hotels completely booked and District residents renting out their homes to tourists, JPI has joined the inauguration rental frenzy and will rent unleased apartments at two of its recently delivered projects near Nationals Park. The Dallas-based developer will require a three-night minimum stay at the Axiom at Capitol Yard and Jefferson at Capitol Yards. The company did not release pricing information, but said it will offer guests a choice of furnished one or two-bedroom units. They also will receive access to 24-hour concierge service and conference rooms, gym facilities, free wireless Internet access in common areas." (WBJ)
UPDATE: Per Ed's link in the comments, the prices are $750/$1,000 per night for 1 and 2 BR units (with that three night minimum). Here's the Craigslist post.
Comments (0)
More posts: 70/100 I, inauguration09, jpi
 

Although the leasing office has been open for a few weeks now, I only just visited Onyx on First this past weekend. They're still putting on the finishing touches (their certificate of occupancy came through not too long ago), so I was only able to see the main floor and one of the model units, but at least now I do finally have photos from the inside of the building (scroll down if the link doesn't jump you down the page). I also got a couple shots from the roof, but things aren't quite completed up there, so I didn't get a photo of the pool. And since they're now open, I've moved Onyx to "completed" status.
The Axiom apartment building at 100 I has been open for a little while, but I hadn't gotten myself in there since a pre-occupancy construction-dust tour back in June. That has now been rectified, and I've posted photos of the common areas and one of the model units. (Didn't get back to the roof, though.) You can also see my interior photos from sibling Jefferson/70 I, to see the warehouse vs. modern differences in the designs.
Comments (0)
More posts: 70/100 I, jpi, Onyx, Square 743N
 

From today's print edition of the Washington Business Journal (subscribers only): "In response to the burgeoning credit crisis, local multifamily developer JPI East has reduced its development and production capacity, laying off half its development divisions. The company would not say how many people were involved, but insiders say it was fewer than 10."
As for JPI's projects in Near Southeast, including the almost-completed 70 and 100 I, the under-construction 909 New Jersey, and the in-development 23 I? "The company still has 10 deals under construction in the region, including three luxury apartment projects in the Capitol Riverfront district near Nationals Park. All three have the debt and equity to go forward, [JPI East's president] says." It might be worth noting, however, that the previously announced September 2008 start date for 23 I has come and gone; and the Wendy's building is still standing, and I haven't so far seen any raze permits coming through the pipeline for it.
 

* The Post's DC Wire blog is reporting that at 5 pm today DCRA will be having a lottery for the 28 street vending spots near Nationals Park. "Winners will enjoy their spots for one month, starting on June 1. Then the process starts all over again with a lottery on the last Tuesday of each month until the baseball season ends." (Vendors grumbling about neon-green On the Fly's vending on Half Street have found out that the eco-vendor is actually on private property.)
* From the Examiner: David Catania gets back into the baseball carping business, saying the city should get its money back from the consultants who predicted in 2005 that the Nats would average 39,000 fans in the first year at Nationals Park, since there's only been an average of 29,000 fans during the first third of the season. Catania says "that ERA may have seriously overestimated ticket sales, which represents a major portion of stadium-related revenues." However, DC CEO Natwar Gandhi has replied that "the ballpark bonds are structured in such a way "that a significant drop in attendance would not hinder our ability to pay debt service" and that "in a worst-case scenario, total attendance at the new stadium could drop to approximately 10,000 people per game without affecting debt-service payments." The Examiner also says: "Ticket prices at the new ballpark are 20 percent higher than the consultant predicted, Gandhi said, which will drastically reduce the effect of reduced attendance." I wonder if the consultants factored in cold and miserable April weather? The Post's DC Wire has more on this.
* The Nats announced earlier this year that tours of the ballpark are available on non-gamedays; yesterday they sent out word that proceeds from those tours will benefit the team's Dream Foundation, which currently has a number of initiatives underway, including the Neighborhood Initiative that's providing three years of funding to the Earth Conservation Corps. Info about the tours is available here.
* My Ballpark and Beyond column in today's District Extra is short and sweet, with blurbs on the RiverFront/Florida Rock zoning approval and the almost-arrival of 700 new residential units at 70 and 100 I Street.
* Also in the District Extra is a big piece on whether the diversity of the Nats' roster, "combined with their state-of-the-art stadium, will be enough to attract young blacks and Latinos to the game in the District."
* DC United wants the city to pay $225 million for its Poplar Point stadium, which the Post says is "far more than some city leaders say they would support" and that "even the amount officials have considered, $150 million, has raised some concern with D.C. Chief Financial Officer Natwar M. Gandhi, whose analysis has concluded such a deal could push the government above a Wall Street debt ceiling that he recommended last year." In the meantime, Marc Fisher thinks it's all a bad idea.
 

Watching from ground level as new buildings pop up is all well and good--but when they are completed, it also means a new vantage point for overhead views of the neighborhood (as long as I can convince the owners to indulge a pesky camera-toting neighborhood blogger). So, thanks to the folks at JPI, I'm now able to add 70 I and 100 I to the Overhead Photo Gallery, joining existing perches on top of 1000 New Jersey, 20 M, and various spots at the ballpark. Even though it wasn't a brilliantly sunny day when I visited, I still got some good photos of the current state of Near Southeast (such as 100 I's southward view seen above, showing the renovated First Street, Onyx, 100 M, Velocity, Nationals Park, and 20 M). In these new 70 I and 100 I overhead galleries, you'll also see 909 New Jersey, the hole being dug for 1015 Half, and even some views east toward 225 Virginia and west toward Southwest. Enjoy. (And, if you want to see the photos I took *inside* 70 and 100 I this week, check out the project page.)
Comments (0)
More posts: 70/100 I, jpi
 

The folks at JPI were kind enough to take me on a walk-through today of their getting-close-to-opening Jefferson and Axiom apartment buildings (better known as 70 and 100 I Street). Jefferson, with its warehouse/industrial feel, is about a month away from opening its shared spaces and first few floors of apartments, with all 12 stories expected to be open to tenants by late fall; Axiom will see its first units open in July, and also is expected to be completed before the end of the year. Together, the two buildings total nearly 700 apartments, and will be the first rental units to open in Near Southeast.
My interior photos of Jefferson/70 I give you a glimpse of the huge "sports pub", the interior courtyard, the other shared spaces, and the roof deck and pool, with hints of the amazing views of the city from up on high. (Don't worry, I'll be adding lots of big images to my Overhead Photos Gallery soon.)
Since Axiom/100 I is not quite as far along in its construction, the interior photos don't hint as much at the final look-and-feel of the shared spaces; but I actually got more photos inside the units in 100 I. And it's on 100 I's roof deck that I got the above photo.
The temporary rental office in the trailer at Half and I is open for business. At Jefferson, rents start at about $1,600 for a studio, $1,855 for a 1-bedroom ($2,225 for a 1 br/den), $2,555 for a 2-bedroom, and a $3,320 for a 3-bedroom; Axiom's prices are a little higher. For both buildings, a single parking space is $200 per month, or $275 a month for a tandem space. And pets are allowed, but there are size and breed restrictions, and additional fees. There are also some special deals being offered on lease terms.
Comments (0)
More posts: 70/100 I, jpi
 

I haven't officially visited the rental office/trailer at Half and I yet, but I can still pass along that 70 and 100 I Street now have their own web sites: 70 I is officially the Jefferson at Capitol Yards, and its sibling 100 I is known as Axiom at Capitol Yards. The sites (which could perhaps use a bit more horsepower or a bit less Flash) have floor plans (just for the Jefferson, Axiom coming soon), amenities lists, and photo galleries.
Comments (0)
More posts: 70/100 I, jpi
 
77 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8




                  © Copyright 2024 JD.